in twitter all of us should tag about slow piece of work progress on uppal narapally fly over to Honorable Nitin Gadgari Ji (Roads and Transport Minister) and NHAI and to KTR sir atleast to complete service roads full fledged work . already i did, if possible every one should tag instead of placing comments here as common public as end of the day we are facing problem.
I become BRS follower after watching your videos. Thanks for the valuable information. Few years ago I have lot of misconception about kcr nd ktr but I am totally wrong.
Major delay in project is due to relocation of power lines, drainage lines and land acquisition. All the funds were released by central government. Cheap politics resulted in public suffering.
Thu mee bathukulu cheda @Nijam_matladu .. "dengalayka langa addam vachindi " annadu nee lantodu. BRS govt. was able to complete many flyovers under SRDP but there were no issues as said "due to relocation of power lines, drainage lines and land acquisition". Telangana people should understand this and vote for BRS.@@Nijam_matladu
We might be travelling by bullet trains and flying bikes by the time this flyover is completed. If at all they complete it in another 4 years, this would probably the only fly over with brand new slabs on a ten year old pillars.
Nen BTech pass ainappudu start aindi ippatiki 3 companies switch aina kani elevated corridor construction matram atle undi. Bro Peerzadiguda roads meeda kuda oka video cheyyandi. Chala dharunam ga unnai
that's not correct---land acquisition happened very slowly and our state government was in-charge of it. Also our contractor declared IP and this was in court and hence took time.
Major delay in project is due to relocation of power lines, drainage lines and land acquisition. All the funds were released by central government. Cheap politics resulted in public suffering.
బ్రో మీరు 2నెలల కింద చేసినా, ఇంకో 2 సంవత్సరాల తరువాత చేసినా ఇందులో ఎలాంటి మార్పు ఉండదు. ఎందుకంటే ఇది కేంద్రం చేతిలో ఉంది. ఈ fly over తొందరగా కట్టండి రా అని అడగాలి అన్నా, చెప్పాలి అన్నా, దీని బాస్ ఢిల్లీలో ఉన్నాడు. అక్కడికి వెళ్లి బుచ్ఛం ఎత్తుకోవాలి.
@@snehithreddy13 Nice googly...sorry check facts...it's state govt duty to fix underground drianage ..pipelines and other cables. Central govt duty to construct only flyover. Same issue not giving lands fir Nagulapally terminal.. not giving lands for hospitals..list is long
What does underground drainage and electrical lines on the sides have to do with flyover 🙄. They will effect construction of service roads may be but does not bother with flyover construction.
Its delay pure because of Central government fund NHCI. All hyderabadies should should show to BJP in coming elections. I felldown from byke in this roads twice. I understood last TRS government also made delays in doing surveys for construction clearance. So both government responsibility
Bro uppal circle deghara inko flyover on process lo undhi kadha which is going to go from top of skywalk and metro,pls make an update on that and btw love ur videos bro I am interested in this so much❤
@@dussamanojkumar le bro uppal ring road degara ramanthapur nunchi oka flyover vastundhi Dani plan paina video petali..akada metro and skywalk paina nunchi oka flyover kadthunaru
ఈ flyover వల్ల ఉప్పల్, పిర్జ్యాధిగూడ, బొడుప్పల్ & మెడ్డిపెల్లి వారికి ఏ లాంటి సౌకర్యం లేదు. చివరికి ఉప్పల్ ring road దగ్గరైన entry/exit ఇస్తే chala traffic flyover ను use చేసుకుంటారు
The reason for delay of this flyover is due to relocation issue of electricity poles and drainage lines by Telangana state government. Because of cheap politics public are suffering.
Thu mee bathukulu cheda @Nijam_matladu .. "dengalayka langa addam vachindi " annadu nee lantodu. BRS govt. was able to complete many flyovers under SRDP but there were no issues as said "due to relocation of power lines, drainage lines and land acquisition". Telangana people should understand this and vote for BRS.
The service road was totally devastated....NHAI did never understood the difficulty of people and asked the contractor to fix the road ASAP the pillar is completed....many people met with accidents....there were many fights happened on it but never and ever NHAI concerned for people....state government has layed the new service road after many requests.
Major delay in project is due to relocation of power lines, drainage lines and land acquisition. All the funds were released by central government. Cheap politics resulted in public suffering. New road works funds were released by central government additionally and on special request of Ex MLA
unfortunately common people are suffering, both state and central govt are playing with this project. state govt should take legal action on contractor..
all other works by union govt in telangana going fast expect this project. bownpally to medchal with in 6 months most of the work completed by central govt. even state govt should take action on contractor and NHAI. end of the day facing problem yu and me only, not politicians@@snehithreddy13
@@mahireddy9890 బ్రో ఆ వీడియోలు మేము కూడా చూశాము. అక్కడక్కడ ఫినిష్ అయిన వీడియోలు చూపించి మొత్తం పని అయిపొయింది అంటే ఎట్లా? మరియు, అతను తెలంగాణ గురించి మాట్లాడితే ఎక్కడో కర్ణాటక లో బీజేపీ కట్టిన సగం సగం పనుల గురించీ చెప్తావు ఎంటి?
Adantha mana dreams lo brother. Worst BJP leaders asalu. Oka 2 flyover regular ga follow up chesi complete cheyinchaleka potunnaru. Malli votes adgutharu. This single flyover is the proof that BJP candidates from Uppal and Amberpet constituencies will never win this year. I hope they lose MP also. Useless people. As a daily rider I know the pain while travelling from this stretch.
😂😂 foolish people Completed projects are by state govt and pending projects are central... As soon as this complete again it will be state 😂😂 brainwashed idiotes
If TG people don't vote for BJP, the BJP at center won't cooperate with respect to projects undertaken by state. So for speedy completion of projects lets make the so called Double Engine Sarkaar 😂
Ikkada chesi chupinchandi ante Delhi gurinchi cheptharu. Have some shame think about your own state brother. They shouldve transferred the funds to state government and accept their inefficiency.
@@venkatsusheelg9658 I'm not doing anything to TG people and asking to give power to such party which is at center for speedy development of state. BJP govt will better than present highly corrupt BRS govt
in twitter all of us should tag about slow piece of work progress on uppal narapally fly over to Honorable Nitin Gadgari Ji (Roads and Transport Minister) and NHAI and to KTR sir atleast to complete service roads full fledged work . already i did, if possible every one should tag instead of placing comments here as common public as end of the day we are facing problem.
i agree it was going very slow in past but now its changed. I see a lot of work happening now at a fast-pace!
slowest under construction flyover in world....State govt completed record number of flyovers in the same time
I become BRS follower after watching your videos. Thanks for the valuable information. Few years ago I have lot of misconception about kcr nd ktr but I am totally wrong.
Major delay in project is due to relocation of power lines, drainage lines and land acquisition. All the funds were released by central government. Cheap politics resulted in public suffering.
Thu mee bathukulu cheda @Nijam_matladu .. "dengalayka langa addam vachindi " annadu nee lantodu. BRS govt. was able to complete many flyovers under SRDP but there were no issues as said "due to relocation of power lines, drainage lines and land acquisition". Telangana people should understand this and vote for BRS.@@Nijam_matladu
We might be travelling by bullet trains and flying bikes by the time this flyover is completed. If at all they complete it in another 4 years, this would probably the only fly over with brand new slabs on a ten year old pillars.
Nen BTech pass ainappudu start aindi ippatiki 3 companies switch aina kani elevated corridor construction matram atle undi.
Bro Peerzadiguda roads meeda kuda oka video cheyyandi. Chala dharunam ga unnai
Thank you for the update bro! Keep up the good work 👍
ఇది కూడా రాష్ట్ర ప్రభుత్వం చేతిలో ఉంటే 2 సంవత్సరాల క్రితమే పూర్తి అయ్యేది..... కేంద్ర ప్రభుత్వం ఆధ్వర్యంలో పనులు జరుగుతున్నాయి కాబట్టే ఆలస్యం
Mari MMTS Evaru Late Chesaro?
@@Jaihind36metro in hyd is not feasible ani central govt enduku antundi?
Both the govts have to come together to solve the issues of the state.
that's not correct---land acquisition happened very slowly and our state government was in-charge of it. Also our contractor declared IP and this was in court and hence took time.
Major delay in project is due to relocation of power lines, drainage lines and land acquisition. All the funds were released by central government. Cheap politics resulted in public suffering.
@@Jaihind36 Thu mee bathukulu cheda
బ్రో మీరు 2నెలల కింద చేసినా, ఇంకో 2 సంవత్సరాల తరువాత చేసినా ఇందులో ఎలాంటి మార్పు ఉండదు. ఎందుకంటే ఇది కేంద్రం చేతిలో ఉంది. ఈ fly over తొందరగా కట్టండి రా అని అడగాలి అన్నా, చెప్పాలి అన్నా, దీని బాస్ ఢిల్లీలో ఉన్నాడు. అక్కడికి వెళ్లి బుచ్ఛం ఎత్తుకోవాలి.
BRSXk killed this flyover..not working on drianahe and pipelines fir years and years Bose dk😂
@@truthspeaksforever nice cover drive...state gov has nothing to do in this flyover
@@snehithreddy13 Nice googly...sorry check facts...it's state govt duty to fix underground drianage ..pipelines and other cables. Central govt duty to construct only flyover. Same issue not giving lands fir Nagulapally terminal.. not giving lands for hospitals..list is long
What does underground drainage and electrical lines on the sides have to do with flyover 🙄. They will effect construction of service roads may be but does not bother with flyover construction.
@@nsreddy0408 that's not the order of work.
త్వరగా పూర్తి చేయాలి 😊😊
Thanks brother Adagane vedio chesinadhuku
Its delay pure because of Central government fund NHCI. All hyderabadies should should show to BJP in coming elections. I felldown from byke in this roads twice. I understood last TRS government also made delays in doing surveys for construction clearance. So both government responsibility
Gadkari is not giving any priority for Hyderabad
If people don't vote for BJP then they won't cooperate with state govt. For fast completion of project let's make Double Engine Sarkaar 😂
@@R_Umesh_Chandrainstead of making double engine lets make bjp without any engine 😂😂. Don't vote in parliament and Assembly elections 😅😅
@@Telangana567
If we don't vote for BJP atleast in parliament elections then Khangress promotes Islam and involves in Scams 😂
This is world record project in NHAI history, Another 5 years minimum
Tq sir.
Hello sir, Is it under SRDP or central government?
Central Government
Ghatkesar kondapur railway over bridge gurinchi teeyandi
Now Govt change..will there any future of East Hyderabad & this flyover completion
Bro uppal circle deghara inko flyover on process lo undhi kadha which is going to go from top of skywalk and metro,pls make an update on that and btw love ur videos bro I am interested in this so much❤
Adhe ee video bro😅😂😂
@@dussamanojkumar le bro uppal ring road degara ramanthapur nunchi oka flyover vastundhi Dani plan paina video petali..akada metro and skywalk paina nunchi oka flyover kadthunaru
6 years jaruguthneee undi..
ఈ flyover వల్ల ఉప్పల్, పిర్జ్యాధిగూడ, బొడుప్పల్ & మెడ్డిపెల్లి వారికి ఏ లాంటి సౌకర్యం లేదు. చివరికి ఉప్పల్ ring road దగ్గరైన entry/exit ఇస్తే chala traffic flyover ను use చేసుకుంటారు
SRDP kaadhu kadhaa andhukenemo late avuthondhi ..eppuudu complete avuthondho emo
Adi avvadamma
👍👍👍👍👍👍👍
Emaina down ramps unnaya? Like pvnr
Uppal metro paina nunchi anta ee Fly over....
The reason for delay of this flyover is due to relocation issue of electricity poles and drainage lines by Telangana state government. Because of cheap politics public are suffering.
Thu mee bathukulu cheda @Nijam_matladu .. "dengalayka langa addam vachindi " annadu nee lantodu. BRS govt. was able to complete many flyovers under SRDP but there were no issues as said "due to relocation of power lines, drainage lines and land acquisition". Telangana people should understand this and vote for BRS.
The service road was totally devastated....NHAI did never understood the difficulty of people and asked the contractor to fix the road ASAP the pillar is completed....many people met with accidents....there were many fights happened on it but never and ever NHAI concerned for people....state government has layed the new service road after many requests.
How can you say this is nahi project...
Major delay in project is due to relocation of power lines, drainage lines and land acquisition. All the funds were released by central government. Cheap politics resulted in public suffering. New road works funds were released by central government additionally and on special request of Ex MLA
This will be completed in year 2100
I don't think this elevated flyover starts from Golnaka to the power grid (Narapally). No exit and no entry at Uppal area
unfortunately common people are suffering, both state and central govt are playing with this project. state govt should take legal action on contractor..
When its funded by union govt....what state govt can do ? Its just lack of funds flow.
all other works by union govt in telangana going fast expect this project. bownpally to medchal with in 6 months most of the work completed by central govt. even state govt should take action on contractor and NHAI. end of the day facing problem yu and me only, not politicians@@snehithreddy13
దయచేసి ఆ ఉప్పల్ లోని చెరువులోని గుర్రపు డెక్క త్వరగా తొలగించాలి.
Enka yenni years pattudhi bro... Already start chesi 8 years indhi😂😂😂😂... E Central govt. Koncham kuda siggu ledha bro. 🤗
10 years aindhi
State government has completed 34 projects under SRDP but central government could not finish even one.. This is the efficiency of BJP government...
Devanahalli Hoskote Completed.Devanahalli Doddballapur complete by this dec
@@mahireddy9890 బ్రో ఆ వీడియోలు మేము కూడా చూశాము. అక్కడక్కడ ఫినిష్ అయిన వీడియోలు చూపించి మొత్తం పని అయిపొయింది అంటే ఎట్లా? మరియు, అతను తెలంగాణ గురించి మాట్లాడితే ఎక్కడో కర్ణాటక లో బీజేపీ కట్టిన సగం సగం పనుల గురించీ చెప్తావు ఎంటి?
@@rexoctalish brs ippudu జాతీయ పార్టీ కదా
Arey BRS banisa majority of projects are undertaking by GoI.
@@R_Umesh_Chandra are bjp banisa, first national project, state projects difference telusko
Enka 5 years iena complete cheyaru
Why
@@Kamesh-j8f దానికి పైసలు రావడానికి దాని బాస్ ఢిల్లీలో ఉన్నాడు.
ఢిల్లీకి వెళ్లి అక్కడ బుచ్చం ఎతుకోవలి
Funds ivaru central government
It will be completed before General elections 2024, Kishan reddy geluvale kadha.. work resumed now with new contractor
Adantha mana dreams lo brother. Worst BJP leaders asalu. Oka 2 flyover regular ga follow up chesi complete cheyinchaleka potunnaru. Malli votes adgutharu. This single flyover is the proof that BJP candidates from Uppal and Amberpet constituencies will never win this year. I hope they lose MP also. Useless people. As a daily rider I know the pain while travelling from this stretch.
Brother image towers video update kavale
What is the name of that lake
Nalla Cheruvu
Good coverage
I think this is under central government
project execute cheyalsina gayatri infra bankruptcy aipoindi .....verevallaki project assign chesa annaru kani vaalu kuda project start cheyatledu enduku ?
From 5yrs no major progress😂, credits to BJP
😂😂 foolish people
Completed projects are by state govt and pending projects are central...
As soon as this complete again it will be state 😂😂 brainwashed idiotes
If TG people don't vote for BJP, the BJP at center won't cooperate with respect to projects undertaken by state. So for speedy completion of projects lets make the so called Double Engine Sarkaar 😂
They can jst handover the project to state and accept their failure....it can be finished by state govt
@@snehithreddy13
Don't do joke. Do you know how many projects BJP undertaken in and around Delhi. Don't become a slave of KaChaRa.
Ikkada chesi chupinchandi ante Delhi gurinchi cheptharu. Have some shame think about your own state brother. They shouldve transferred the funds to state government and accept their inefficiency.
Are you blackmailing Telangana People?
@@venkatsusheelg9658
I'm not doing anything to TG people and asking to give power to such party which is at center for speedy development of state. BJP govt will better than present highly corrupt BRS govt
BRS govt killing uppal..taking years to complete land acquisition..building drianage and pipelines..thu!!!!
Inka eppudu avtundira nayana ee flyover work. Orey BJP na batta ga twaraga complete cheyra
paniki maalina BJP