Very useful video..thanku sir. Just keep posting such videos. We have paid for tution but not getting content like u are giving here. Point wise explanation..thanku
Why we use W18 Kips on ASSHTO and what is meant by 18Kips like it is for what Is it the force of the track or the resistance of the road that can maximum applied? why not more force exceeded, and what happened if exceeded.
Hello sir, I want to know one think please reply fastly to this By CBR the SBC is 279kn/m2 how can we take the dimensions of sub grade, sub base and base
U made the concept clear in 15 minutes which i didnt learn in my four years of engineering☺️
Continue the good work sir🤗
Ye badhiya tha guru
A beautiful way of teaching keep it up Sir 👍🏻
Sir bhut hi shandaar nice to see you on screen sir👌👌👌
Bahut achha padhate h sir ,aap
Finally .. u have shifted to white board... and a Beautiful face is revelved .... all the best Sir... 😊🙏
Great to see you on RUclips...... keep up the good work and best of luck.....
Super👌
Concept clear ho gaya sir
Very useful video..thanku sir. Just keep posting such videos. We have paid for tution but not getting content like u are giving here. Point wise explanation..thanku
Very nice information
Superb sir ji 👏👌🙌
Excellent. Love from Bangladesh.
Thanks thanks excellent teachings and guide with technical details I salute and accept, God's always keep U Safe and energetic
OMG itna pyara samjhaya apneee❤️ great
Sir agar sub grade ka CBR value 8% hai to baki layer ka thickness ke liye kya GSB,WMM,DBM,BC ka CBR nikalana hoga kya?
Sir 2.5mm pe hi jyada kyun aata hai generally? Ye experiment se dekha gayaa ya fir iske piche bhi kuch reason hota hai?
Why we use W18 Kips on ASSHTO and what is meant by 18Kips like it is for what Is it the force of the track or the resistance of the road that can maximum applied? why not more force exceeded, and what happened if exceeded.
Teaching method👌👌
Finally I got what is purpose of cbr test tnx sir
How can we decide whether we need to do Soaked CBR or Unsoaked CBR?
Sir questions bhi karaiye please
sir you did not mentioned anything about soaked or unsoaked soils. you directly said for compacted soils.
please help.
Sir
(Tie bar for longitudinal joint
Dowel bar for expension joint )
Ke bare me bhi bata dete
Sir .....CBR value for different layer will be different???? And how we'll find CBR value for different layer ???
Very nice dear
I have never seen as a such type of teacher....
Digin kese Karte hai village road $ NH & pwd Road ka
Good explanation
Awesome sir
THANKS VAIYA FOR
🎉thank you sir 💐
Sir continue further lectures plz
Wonderful sir
Great
thanks alot sir
Sir how can we find wheel load at our site
a=?
Nice sir
Great...
Very Well Described.
Clear explanation.Tq sir.
Wonderful
Sir what is the formula for T1 and T2 also T3
I will solve one problem then you easily understand
Nice please resolve a numerical using CBR method
Bilkul
All the best 👍👍👍👍
chha gye sir ji
Please have a problem on CBR Method
Ok
god bless u
Thank u Sir🙏
please add at least subtitles
Okk
Thanks
Thanku sirr
Hello sir, I want to know one think please reply fastly to this
By CBR the SBC is 279kn/m2 how can we take the dimensions of sub grade, sub base and base
Any thing required either we take from is code or given in question
CBR value =load ×C. F/Standard load×100
How to find the wheel load (P)
Directly given in question
@@DAAETechofficial sir generally on site how to find ?
1370 load ko difine ka digiya
Best
Sir plz make a video on Westergaard stress theory
Bilkul
😍
👍👍
Very irritating, the background sound ... Uhh
I will improve
Sir pdh rhe ho sir
@@DAAETechofficial Nice explanation Sir keep it continues
Excellent sir