Maganda at organized yung parking at maintenance ng train system. Pero yung mga station kay pangit mukhang bodega sana manlang kumuwa sila ng comtract sa mga rail network provider sa europe itong design nato parang hindi pinagisipan basta alkung anu nalang maisip gawin .
Yes, as a rail enthusiast, I was disappointed in the exterior design of the stations. I was expecting something more modern or futuristic but it looks like a 1970's design and not very different to the LRT 1 stations.
honestly mas maganda at may aesthetic sense pa nga ang original LRT1 stations hahaha itong MRT7 literal na box na may bubong at hadgan panget sobra@@aussieboy77
atlis meron nang train kaysa wala pa diba? at kung isasabay yan sakto sa pagtapos ng mrt 7 eh panigurado lalong matatagalan pa dahil sandamakmak na checking un gagawin sa train bago isalang sa train track. maganda na din na advance un pagbili atlis na check na nila yan at alam na nila kung okay ba un pagkakagawa
Yong ayaw mag benta ng right of way nila sana wag kayo sumakay ng MRT at kahit anong infrastructure ng gobyerno. Pati highway wag kayo gumamit.
Muling magbabago ang ating bansa❤🇵🇭
Philippines will be likemchina🇨🇳
Ibang ibang na pagdating ng panhin ang pinas
Maganda at organized yung parking at maintenance ng train system. Pero yung mga station kay pangit mukhang bodega sana manlang kumuwa sila ng comtract sa mga rail network provider sa europe itong design nato parang hindi pinagisipan basta alkung anu nalang maisip gawin .
Yes, as a rail enthusiast, I was disappointed in the exterior design of the stations. I was expecting something more modern or futuristic but it looks like a 1970's design and not very different to the LRT 1 stations.
honestly mas maganda at may aesthetic sense pa nga ang original LRT1 stations hahaha itong MRT7 literal na box na may bubong at hadgan panget sobra@@aussieboy77
@@Sammyduo214 Personally I think the LRT-2 stations are a more attractive design.
Kaya ba Dec 2025? bwahahahaha
Mabuti ngayon mabilis ang trabaho nila hnd katulad noong kay digong sobrang bagal.
Grabe nman naluma na yung train at tracks di pa rin tapos 😆
Sa sobrang bagal ng construction. Yung mga bagong bagon naging luma na. Akalain mo 4 na taon na iyan. Di pa nasasakyan luma na. tsk tsk tsk!
tinakpan naman. tumatagal ng 30 years ang ibang bagon
Luma pala ah, siguraduhin mo lang na hindi ka sasakay. Baka mamaya makikipag agawan ka rin pala pag sakay.
atlis meron nang train kaysa wala pa diba? at kung isasabay yan sakto sa pagtapos ng mrt 7 eh panigurado lalong matatagalan pa dahil sandamakmak na checking un gagawin sa train bago isalang sa train track. maganda na din na advance un pagbili atlis na check na nila yan at alam na nila kung okay ba un pagkakagawa
1 x 6 Per Bagoon iyang mrt7.
Sobrang dami ng Tren na dumating, hindi parin tapos ang mga Facilities... palpak talaga ... mga hayup
sabihin mo yan Kay Ramon ang ..