As I have said previously you did it all so clearly and put knowledge in two parts. Now our main care in these natural but also constructing transformation is to achive the aestetic integration of new Methods with the existing engineering characteristics and in effect the preservation on the sensitive vunerable landscape. Always be that constructive! Well speach - I saw vertical topic and it is impressiv and implying with this one.
hi if i use the values you gave like wetland are 5 m2 per capita, what source should i write in my paper for citation. I mean, are those values from US EPA standards?
For a town, you will need a very large area to build the CW (considering a highly populated region). If this is not a constraint, you can consider it as an option.
Before a CW it's better to consider Anaerobic Baffled Reactor as primary treatment ruclips.net/video/78DXQqc2Dis/видео.html This is a detailed video about the system's design
Hi, thank for your informative video. I would like to ask a question. Are every basin of constructed wetlands should be under the soil level? If yes how can we collect the water from the outlet? another question is, how can we calculate the area of the wetland if it is for an industry?
Hello dear, Ideally a hydraulic profile should be made for the WWTP. Wetlands are placed under the soil level and the effluent is collected through a perforated pipe.
Thank you for the answer @@wateracademy5866 , so does it means that the effluent will be pumped out to the above soil level through a perforated pipe due to the hydraulic concept? Another question is, does the calculation of area 5m^2/Person also works for an industry?
@@rny280You might need a pump if gravity won't work (depending on the Hydraulic Profile). For industries, wetlands are not the best option. It might be used as a tertiary treatment. Always make sure that the entering flow to the wetland has very low TSS and FOG
Water treatment for beginners course: bit.ly/43vbJdF
Wastewater treatment for on-site projects course: bit.ly/44PkIHB
ruclips.net/video/zR1H6_B_hd4/видео.html
As I have said previously you did it all so clearly and put knowledge in two parts. Now our main care in these natural but also constructing transformation is to achive the aestetic integration of new Methods with the existing engineering characteristics and in effect the preservation on the sensitive vunerable landscape.
Always be that constructive! Well speach - I saw vertical topic and it is impressiv and implying with this one.
Clear explanation. I'll try the wetland system in the future.
hi if i use the values you gave like wetland are 5 m2 per capita, what source should i write in my paper for citation. I mean, are those values from US EPA standards?
ruclips.net/video/zR1H6_B_hd4/видео.html
Wonderful explanation
Thank you!! 😄
ruclips.net/video/zR1H6_B_hd4/видео.html
Good work. Thanks for sharing
Thanks
hi, very urgent question! is it suitable for a town size treatment or just for a building complex?
For a town, you will need a very large area to build the CW (considering a highly populated region). If this is not a constraint, you can consider it as an option.
Hi. How would I calculate the size of the septic tank, if I use your calculations and the detention time is 3 days?
Before a CW it's better to consider Anaerobic Baffled Reactor as primary treatment ruclips.net/video/78DXQqc2Dis/видео.html
This is a detailed video about the system's design
Can this water be used for irrigation of trees after wards or is too much of the phosphorus and nitrogen taken out by the wetland plants
It the wastewater treatment plant is well designed, yes the effluent of the wetland can be reused for irrigation
Hi, thank for your informative video. I would like to ask a question. Are every basin of constructed wetlands should be under the soil level? If yes how can we collect the water from the outlet? another question is, how can we calculate the area of the wetland if it is for an industry?
Hello dear,
Ideally a hydraulic profile should be made for the WWTP.
Wetlands are placed under the soil level and the effluent is collected through a perforated pipe.
Thank you for the answer @@wateracademy5866 , so does it means that the effluent will be pumped out to the above soil level through a perforated pipe due to the hydraulic concept? Another question is, does the calculation of area 5m^2/Person also works for an industry?
@@rny280You might need a pump if gravity won't work (depending on the Hydraulic Profile).
For industries, wetlands are not the best option. It might be used as a tertiary treatment.
Always make sure that the entering flow to the wetland has very low TSS and FOG
I get it, thank you so much for your help@@wateracademy5866
ruclips.net/video/zR1H6_B_hd4/видео.html
Thank you good input for me
Glad it was helpful!
Wonderful! Thanks so much
Glad you liked it!
Thanks bravo
You’re welcome
Good explanation
Thanks
what is the detention time for water in Wetland ?
for horizontal flow wetlands, it is typically between 2-5 days
Thanks