Testing current transformers installed in power transformers and GIS

Поделиться
HTML-код
  • Опубликовано: 17 ноя 2024
  • НаукаНаука

Комментарии • 6

  • @omicronenergy
    @omicronenergy  13 лет назад +1

    @HansErikOlovsson
    With "injecting primary current" we have to point out that in our video we refer to high current injection (Nominal Primary Current) measurement. The statement that it is difficult or impossible to measure these kind of CTs refers to some application where it is simply not possible to get access to the primary side to test with the high current injection measurement principle. For other application it is rather difficult and extreme costly but of course possible.

  • @omicronenergy
    @omicronenergy  13 лет назад +1

    @HansErikOlovsson
    Thanks for your comment. We appreciate your input and we are highly interested to verify the statements if not correctly given.

  • @omicronenergy
    @omicronenergy  13 лет назад +1

    We would be interested in how others test CT's where access to primary terminal is not possible?

  • @udeyraj284
    @udeyraj284 12 лет назад +1

    This video is focusing on the Testing CTs installed in Transformers and GIS for the electrically meter.

  • @NabijonHazratqulov-rb2uf
    @NabijonHazratqulov-rb2uf 5 месяцев назад

    Hi . Thanks a lot.

  • @alialmohandesh279
    @alialmohandesh279 7 лет назад +1

    nice