Gateway Terminal's Electric SENNEBOGEN 895E Cycle Time - The World's Largest Material Handler

Поделиться
HTML-код
  • Опубликовано: 18 ноя 2024

Комментарии • 8

  • @michaelbogino2473
    @michaelbogino2473 24 дня назад +1

    You can see this setup from I-95 in New Haven and it is truly impressive even from far away. Very cool to have this kind of advanced project in CT.

  • @Kiwi_T-Bone
    @Kiwi_T-Bone 20 дней назад +2

    Very cool! I did think that the cycle time test needed to include a truck dumping into the tray again to be a complete beginning to end test

  • @DevinKrisst
    @DevinKrisst Месяц назад +1

    LEGENDARY

  • @gopikrish1298
    @gopikrish1298 8 дней назад

    Truck arrives
    Bucket rotates 180 degrees to receive load
    The truck moves forward to make U turn at the far end of the quay

  • @klimber5813
    @klimber5813 11 дней назад +2

    What is the advantage of this method? Why not use a conveyor belt?

    • @gerhardma4687
      @gerhardma4687 7 дней назад

      If the warehouse is so far away and everything has to be transported by truck, unloading from the skip and loading the ship is so much quicker. I think those responsible have thought everything through carefully

  • @mathiasschumacher7321
    @mathiasschumacher7321 18 дней назад

    The International Payhauler are like 50 years old?