Lebuhraya WCE, Seksyen 2: SKVE - KESAS - Bakal Buka Q3 Tahun Kewangan 2025
HTML-код
- Опубликовано: 5 ноя 2024
- Drone: Dji Air 3
Recommend Drone:
1. DJI Air 3S Camera Drone: s.shopee.com.m...
DJI Air 3S Intelligent Flight Battery: s.shopee.com.m...
2. DJI Air 3 Camera Drone: s.shopee.com.m...
DJI Air 3 Intelligent Flight Battery: s.shopee.com.m...
3. DJI Mini 4 Pro Camera Drone: s.shopee.com.m...
DJI Mini 4 Pro Intelligent Flight Battery: s.shopee.com.m...
4. DJI Avata 2 Camera Drone: s.shopee.com.m...
DJI Avata 2 Intelligent Flight Battery: s.shopee.com.m...
----------------
The West Coast Expressway (WCE) / Lebuhraya Pantai Barat (LPB) is an interstate controlled-access highway running along the west coast of Peninsular Malaysia.
The 233-kilometre (145-mile) expressway is currently under construction, with several sections open for public use.
The West Coast Expressway is a privatization project approved by the Government to West Coast Expressway Sdn Bhd (WCE). The project, operates on a build-transfer-transfer model. The project is expected to be completed in five years’ time.
The West Coast Expressway (E32) commences at a junction with Selangor State Road FT31 which runs from Banting, Selangor and ends at the ramp of Changkat Jering toll plaza of the North-South Expressway at Taiping, Perak.
It is planned and designed in such a way so that it is well-connected to the existing highways (such as PLUS, SKVE, NKVE, NNKSB, LATAR, KESAS, etc.), in order to maximize its coverage and gives the road users more options while travelling.
The entire expressway with 21 interchanges will provide convenience to users to plan and travel more efficiently.
Once the expressway is completed, it will be the fourth longest in Peninsular Malaysia, after the North-South Expressway Northern Route, the East Coast Expressway and the North-South Expressway Southern Route.
#wce #shahalam #selangor #malaysia #fawwazmedia
--------------------
Cepat la buka laluan Banting -kesas..hari2 tempuh jem..boleh jimat dr 50minit ke 20 minit..
Tgk video ni yg latest ni..naper nk tunggu suku ke 3 tahun depan lambat benor....piling tanah mendap dh siap semua..tgk jaluran dri skve sampai kesas..dlm 99% siap dah..kalo pemantauan n ujian LLM x kan terlampau lama sgt...paling lewat sepatutnya sebelum pertengahan disember tahun ni buka..x lama dh nak cuti hari natal...come on wce ooii
contraktor kita buat kerja lambat.
nak bukak sekali ngan RnR kot 😀
Nak tengok perkembangan asam jawa ke tanjung karang pula tuan...
Ejah LTU selepas exit Raub tu min…bunyi kata banyak progress
Next pulak highway dong kampung sy 🙏🏻😭
Aku dah lalu semua laluan WCE yang dah dibuka. Kualiti memang ke laut. Minggu lepas cuba dari Banting ke SKVE, mak ai tak rata. Bergegar-gegar kereta.
Sama bang ,kualiti jalan dengan plus memang jauh berbeza.
Terbengkalai lama sangat, tu yg tanah mendap pun tak sekata. Nanti lepas turap semula, baiklah sikit keadaannya.
Segi kebaikannya ialah pengguna akan pandu ikut had laju agar tak terasa lambungan dan tak merosakkan sistem gantungan kereta.
Lpt2 masa mula2 buka duku gitu juge. Lepas 10 tahun bnyk dah beza lepas beberapa kali menurap
@@shaktikumaran haritu gi utara, lalu WCE. Bila exit Changkat Jering masuk PLUS...smooth je jalan hahaha. Cuma WCE lapang la tak banyak kereta, masuk PLUS jalan rata tapi penuh kereta.
Masih menunggu kemaskini seksyen 7. Thank u min.
(SKVE Highway to Kesas Highway coming soon from 2025)
(west coast expressway)
Next project tambah lorong Baru lebuhraya kl karak project mega next tol kl karak project mega MALAYSIA 🇲🇾🇲🇾🇲🇾🇲🇾🇲🇾 video ❤️❤️❤️❤️❤️❤️💯💯💯💯💯
bila dh siap ja laluan niee ia akan dapat kurangkan kesesakan di kesas dan mereka dari dua dua arah dapat masuk ke highway ni dan masuk ke selatan dan utara ia lebih baik daripada terpaksa menunggu dilampu isyarat di bandar bukit tinggi klang bukan
will be opened by next month , December 2024
Dgr cita seksyen 7 mac 2026 betul ka? nmpk sek 7 paling last siap... raya thn depan hadap jem lgi kt tg karang... 🤣🤣🤣
Tol sae (wce) -skve nnti mesti keras..campur dua hiway kan😅😅
sae sistem tol terbuka. bayo kat tol kemuning tu jer haha
@@kucingmeowcanteq7994tol bukit rimau
kerja terlalu lambat, section 7 progress sedikit sahaja
Lepas ni LTU pulak min.😂
Hanya 4 lorong? Ini dikira kawasan trafik padat.
Kawasan kritikal jemnya paling lambat siap….
❤️👍🏻😊
min try fly csr kuala krai..
takyah fly min, takde beza
Min, CSR / LTU, abaikan jer dulu.
Baik pantau ECRL kat Selangor lagi puas hati sebab sentiasa ada kerja terbaru.
Higway ni cantik viewnya,cuma melantun2...110kmj pun bhaya🤢
Bawa je 80km 😂, masih jauh lebih cepat drpd JLN klang banting. Kalau tgk skve, sampai skrg masalah ni masih berterusan
Kenapa lambat sgt nak buka
Tak tahulah nak menghampiri penghujung tahun 2024
Ada kes pemendapan tanah dekat section ni.. So dorg terpaksa buat kerja2 pemasangan piling dekat kawasan yang mendap.. Benda ni mmg take time utk repair... Kalau tak tackle benda ni, in future mmg beralun je lah highway ni and asyik kena regulate and pave memanjang je...
Failed project....xde akses ke rimbayu...sape la punya plan...
puncak alam pun xda akses, memang tak fikir masa depan diorg ni
@@ahmadarifudin5875mungkin sebab ada latar tuan..