Polson Lumber #70 and NP

Поделиться
HTML-код
  • Опубликовано: 27 янв 2025

Комментарии • 8

  • @mikeypartymusic6760
    @mikeypartymusic6760 Месяц назад

    What a beauty 😊

  • @chrisruth7057
    @chrisruth7057 5 лет назад +1

    Awesome video 😃👍

  • @EntertainmentWorldz
    @EntertainmentWorldz 5 лет назад +1

    super video

  • @tomas5376
    @tomas5376 5 лет назад

    More great train video! Gracias🚂🚂🚂🚂👍✌️😊🙏🏼

  • @ortingdude
    @ortingdude 5 месяцев назад

    As of 2024, the Tacoma Hill is no longer active. A derail has been placed just beyond the East C Street Crossing and the line has been severed just beyond the 72nd Street/McKinley Ave crossing. All of the railroad crossing signals have had their lights removed or have been turned inwards. At 72nd, they have removed the overhead mast of the crossing. Other crossing from the severed point till 104th Street have had their lights removed. Now, freight is handled by Rainier Rail via Chehalis.

    • @travelingtom923
      @travelingtom923  5 месяцев назад

      That is really a shame. Watching trains go up that big hill was always a lot of fun. I was surprised it lasted as long as it did.

  • @Brian_rock_railfan
    @Brian_rock_railfan 5 лет назад +1

    Awesome video Traveling Tom :)

  • @chrishansen1293
    @chrishansen1293 5 лет назад +1

    Sounds like that Jeep crossed a little too soon.