Hahaha yes I am well aware I need much more experience. I have only had this for 2 years and probably only used it for dirt work 2 times I mainly use it for the forks , Jeb, and grapple bucket for snow removal
Easy math. 100 Sq ft at 3 inches is 10 yds. When u grade work the bucket tipped straight down( liked dump position) u have cutting edge in gravel with down pressure work bkwards.
@@bkyardmechanic5010 figuring the volume was going to be a variable because the area changed all over the place from 6 inches deep to 2 inches deep and was not a flat or even consistent taper to use normal geometry :/
This is painful to watch. You need a lot more practice. I have over 30 yrs experience. In time you'll master it . Good luck.
Hahaha yes I am well aware I need much more experience. I have only had this for 2 years and probably only used it for dirt work 2 times
I mainly use it for the forks , Jeb, and grapple bucket for snow removal
Easy math. 100 Sq ft at 3 inches is 10 yds. When u grade work the bucket tipped straight down( liked dump position) u have cutting edge in gravel with down pressure work bkwards.
After u get bumps out then drag it bk with bucket flat. Wish u good luck
@@bkyardmechanic5010 figuring the volume was going to be a variable because the area changed all over the place from 6 inches deep to 2 inches deep and was not a flat or even consistent taper to use normal geometry :/