Liebherr - Crane power for climate change

Поделиться
HTML-код
  • Опубликовано: 13 апр 2022
  • ​Ten months ago, Austrian group Felbermayr started operations with its third Liebherr LR 11000. Since then, the crawler crane has been erecting Enercon wind turbines in Burgenland to the south-east of Vienna. Working with an LR 1750/2, the 1000 tonne crawler crane has erected a total of thirty wind turbines. Felbermayr will be sending another LR 11000 to the wind farms near the Austrian-Slovakian border in May to support the rest of the work. The erection work is scheduled to be completed by the end of 2022 at the latest.
  • НаукаНаука

Комментарии • 9

  • @ericm8811
    @ericm8811 2 года назад +5

    Hey Liebherr! Thanks for this cool vid showing this impressive crane achieving real results! Ride ride ride!

  • @coylerz11
    @coylerz11 2 года назад +1

    Very impressive piece of machinery!

  • @mustapha807
    @mustapha807 2 года назад

    Pour moi une grue liehberr. De 65 tons la venir vive liehberr

  • @ioanbota9397
    @ioanbota9397 10 месяцев назад

    Realy I like this video

  • @hubertkaiser8581
    @hubertkaiser8581 2 года назад

    Ohne die Gruenen keine Windturbinen, ohne Windturbinen keine Kraene, ohne Kraene kein Liebherr, ohne Liebherr nichts.........