Mastercam Multi-setup Webinar

Поделиться
HTML-код
  • Опубликовано: 30 июл 2024
  • Learn more about Mastercam solutions, training, and support at bit.ly/3MfRFo2
    Join our Certified Mastercam Application Expert as they show you how to take a single part program and prepare it for the selected vise, fixture, or tombstone work-holding environment in production.
    • Programing Part Top and Bottom in a Vertical using WCS (Work Coordinate System) to verify part complete
    • Creating and using a Stock Model in a Vertical or Horizontal and how to move stock models from one Vice or Tombstone to other
    • Tips and Tricks for efficient programming and posting

Комментарии • 5

  • @policebox1092
    @policebox1092 2 года назад +2

    Awesome

  • @VictorHernandez-nt3tw
    @VictorHernandez-nt3tw 2 года назад +2

    Great tutorial. I just wish it was so much easier than this in MasterCAM . I feel like it's a lot of work around p

    • @MLCCADSystems
      @MLCCADSystems  2 года назад

      The developers are always looking for ways to improve the software, and you can perform this operation without this many steps if you skip things like full simulation. Thanks for the feedback!

    • @JonBanquer
      @JonBanquer 2 года назад

      Mastercam badly needs a fixture manager and a tombstone manager to help automate this very tedius, time wasting process . Additionally, using just Levels isn't efficient even with Viewsheets. The workflow in Mastercam is piss poor compared to better CADCAM programs causing lots of wasted time.