Thanks for watching eFunda and share our videos with all. Main cable entries to JB shall be depend upon the type of JB. Main cable shall enter from bottom and left and right side cable shall be branch cable this helps individual termination inside JB..
@@eFundaChannel thank you. I mean we have have Fire and Gas field junction box. Main multitriad and auxiliary cables going out to the detectors are entering from bottom only. My question is about termination pattern. We have vertical terminal block. First bottom hole at extreme left is for main cable and remaining holes are for branch cables. However contractor is trying to terminate maincable from right to left. Is there any IEC code available for, normally main cable should be terminated to left side?
Thanks for watching our channel eFunda and pls share with some one in need of such vidoes. Yes we are in planning to make separate videos on Procurement Engineering parts where we will cover Material Requisition (MR), Technical Bid Evaluation (TBE) and VDR...Keep watching our channel eFunda.
Thanks for watching videos on efunda and our aim is make videos for all the viewer. At this time immediately not possible but in future will try but not guarantee....infact Keep watching that will improve your spoken English. This will help you in work
Please make a video on wiring schedule
Main cable should be terminated to left side ? Outgoing cables should be connected to right side ?
Thanks for watching eFunda and share our videos with all.
Main cable entries to JB shall be depend upon the type of JB. Main cable shall enter from bottom and left and right side cable shall be branch cable this helps individual termination inside JB..
@@eFundaChannel thank you. I mean we have have Fire and Gas field junction box. Main multitriad and auxiliary cables going out to the detectors are entering from bottom only. My question is about termination pattern. We have vertical terminal block. First bottom hole at extreme left is for main cable and remaining holes are for branch cables. However contractor is trying to terminate maincable from right to left. Is there any IEC code available for, normally main cable should be terminated to left side?
Can u please make a video on material requisition, TBE, TR, TQ for atleast one instrument
Thanks for watching our channel eFunda and pls share with some one in need of such vidoes.
Yes we are in planning to make separate videos on Procurement Engineering parts where we will cover Material Requisition (MR), Technical Bid Evaluation (TBE) and VDR...Keep watching our channel eFunda.
@@eFundaChannel looking forward to see 👍
All above mentioned videos are already made and published on our channel.
Thanks for watching and share with someone in need.
Thanks for the immediate response to my request to make videos on procurement. Thanks to Nikam sir. 🙏
@@sairamk2591 Please visit our channel and see separate playlist for procurement Engineering videos. Thanks
Plz sir make it in hindi language
Thanks for watching videos on efunda and our aim is make videos for all the viewer. At this time immediately not possible but in future will try but not guarantee....infact Keep watching that will improve your spoken English. This will help you in work