HEC-RAS 2D Class: 5.2 - Selecting Breach Breach Parameters

Поделиться
HTML-код
  • Опубликовано: 6 янв 2025

Комментарии •

  • @_duniyadari_
    @_duniyadari_ Год назад +1

    How to calculate the pool volume at failure?

  • @onebyone9014
    @onebyone9014 8 месяцев назад

    Hello, I have a problem I am trying dam breach analys and I had an hdf error. It gives “Error in the time window
    Hdf error trying to close hdf output file hdf5 diag: Error detected in hdf5”

  • @vikassinghjadoun9952
    @vikassinghjadoun9952 Год назад

    When we give the upstream hydrograph data, what is the time duration that we give for the hydrograph. Is it the same as breach formation time as calculated by different methods.

  • @isaacsinkala1574
    @isaacsinkala1574 2 года назад +1

    Thank you very much. I really need this knowledge.

    • @stanfordgibson
      @stanfordgibson 2 года назад

      Thanks Isaac. Yeah, these parameters are really important.

  • @saeedgolian7535
    @saeedgolian7535 6 месяцев назад

    Just a quick question, if we have a tailing facility (non-Newtonian fluid) and a water dam (Newtonian fluid), then how these two can be modelled as in "Unsteady Flow Data", just one flow regime can be defined for the whole system, i.e. Newtonian or Non-Newtonian flow regime. Please correct me if I am wrong and if there is any solution to model these combination of flow regimes. Thanks

    • @stanfordgibson
      @stanfordgibson 6 месяцев назад

      This may be the most common question we get about 2D and I really need to do a video on it. In the standard fixed-bed NN tool, no, you only get one global Cv. But you can "hack" this by setting up a simple "mobile bed" sediment model (we even added simplifying tools like "concentration only" mode and a "deposition limiter" that will use the sediment engine to use the AD equation to route your debris flow into clear water...mix with the clear water, update the concentration, and feedback on the NN parameters. I really need to do a video on this...but i'm not sure when I'll get to it.

  • @firmansyahmardwiono2875
    @firmansyahmardwiono2875 2 года назад

    How to run dam breach for cascade dam?

    • @stanfordgibson
      @stanfordgibson 2 года назад

      If you have multiple dams in line, you could either set different breach times, or, better, set breach elevations for both of them, and after the first dam breaches, it will automatically fill the downstream reservoir and breach that dam.

    • @firmansyahmardwiono2875
      @firmansyahmardwiono2875 2 года назад

      @@stanfordgibson thank you very much