    @onorebakasama 4 месяца назад +2

    1:46 - The Bay Bridge is a suspension bridge (and cantilever, and through-truss), not cable-stay.

    • @TheMrPeteChannel
      @TheMrPeteChannel 4 месяца назад

      The old cantilever section was torn down & replaced with a box gerter & single tower cable stayed bridge.

  • @roycelarson6337
    @roycelarson6337 4 месяца назад

    Will they consider using the existing approach ramps?

  • @snypa-ck7hn
    @snypa-ck7hn 4 месяца назад +1

    dude 1:16 fix yo outlets

  • @alanstevens1296
    @alanstevens1296 4 месяца назад

    The $5 to $10 billion in economic losses in 2024 could have been prevented if it was a tunnel as was built at the two other Baltimore harbor highway crossings.
    Build a 6,000 foot long tunnel. That was the original plan for the outer harbor crossing. The Key Bridge approach span piers were built on the causeways that were built for a tunnel.

    • @TheMrPeteChannel
      @TheMrPeteChannel 4 месяца назад

      I'd rather see a tunnel built then another boring cable stayed bridge.

  • @TheMrPeteChannel
    @TheMrPeteChannel 4 месяца назад

    Every jet is now a twin jet. No more trijets or quad jets. Every bridge is now a cable stayed bridge. This is getting boring.