In EHTC page The Speed control loop is given +100% loop to avoid the turbine going beyond overspeed.It means when turbine tripped M/C should come on speed control loop that closes the control valves very fast
Sir When Turbine was tripped, control automatically comes to speed control because of speed control output of -2 on minimum gate selection...then what is the importance of giving 100% adding in that loop.
Very good video ...
Thank you.
Ur all videos are awesome sir 👏👏
Thank you
Thank you sir 🙏
You are welcome 🙏
sir ji what will happen when turbine trip but esv not close
@RahulKumar-ul2if It may not be possible as when turbine tripped trip oil' pr become zero and stop valve will close in 0.2 sec.
@@rahulsirclasses1987 okk thanks sir ji
Sir
What is the reason for giving 120% in EHTC speed control loop.
In EHTC page The Speed control loop is given +100% loop to avoid the turbine going beyond overspeed.It means when turbine tripped M/C should come on speed control loop that closes the control valves very fast
Ok sir
Sir
When Turbine was tripped, control automatically comes to speed control because of speed control output of -2 on minimum gate selection...then what is the importance of giving 100% adding in that loop.