Very good update , this work was pending long time due to land acquisition but ,work is going fast . Even some places near adambakkam station 2 buildings needs to be demolished and then work will start.
How the track line 1 and line 5 join in alandur and how it's seperate from st. Thomas mount station thats confusing. Either they lay new pillars and track for line 5
@@City_Breeze-1 Yes, you're right. But what is the need to construct a new St.Thomas mount station next to the existing one if the two lines (Corridor 2 and 5) are connecting as they head into the existing St. Thomas mount station? I ask because I read that they will not be constructing a new St.Thomas mount station for Phase-2. If that is the case, what are those pillars being constructed next to the existing St. Thomas mount station for? Anyone?
bro why line 5 is not connect in existing stmount railway station and why build it the new staton in parallel..,if they connecgt existing station the new station cost is saved and easy to connection when the same strech to sollingallur to centrel it easy to pasengers
Chennai metro..❤ சென்னை மெட்ரோ திட்டத்திற்கு ஒப்புதல் அளித்துள்ளது. சென்னை மெட்ரோவின் தந்தை. MK Stalin. Chief minister of Tamil Nadu.. good thinking😅😅😅😅😅❤
Very good update , this work was pending long time due to land acquisition but ,work is going fast . Even some places near adambakkam station 2 buildings needs to be demolished and then work will start.
Yes. Thank you.🙏
Sir vanuampet to .adipakkam status Pl thank you srig
Excellent update congratulations
Thank you.🙏
Very good explanation
Good detailing
Thanks.🙏
Very nicely explained with illustrations. Keep it up 👏🏻👏🏻👍🏻
Thank you.🙏
Hats off to your hardwork
Thank you so much.🙏😃
Excellent update, most complicated engineering challenge!
Yes. Thank you.🙏
Appreciate your efforts
Thank you.🙏
Super coverage bro
Thank you.🙏
Left, right, left, right, left, right... Nice bro... Keed do post.
Thank you.🙏
Any updates on Tambaram Velachery(Guindy/Little Mount) metro current path
Please update search keys Or description
If i search with "st thomas mount rail" or mrts this video is not coming as result
OK. i will do it. Thank you so much🙏😊
Taking more risk to telecast thank you brother for your risk
Good coverage
@@saravanansathyanathan3664 Thank you.🙏
Thank you.🙏
How the track line 1 and line 5 join in alandur and how it's seperate from st. Thomas mount station thats confusing.
Either they lay new pillars and track for line 5
line 5 is connecting in line 2 track. not in line 1. Thanks.
@@City_Breeze-1 Yes, you're right. But what is the need to construct a new St.Thomas mount station next to the existing one if the two lines (Corridor 2 and 5) are connecting as they head into the existing St. Thomas mount station? I ask because I read that they will not be constructing a new St.Thomas mount station for Phase-2. If that is the case, what are those pillars being constructed next to the existing St. Thomas mount station for? Anyone?
Nice
Thanks.🙏
nice😎😎👍👍
Thank you.🙏
bro why line 5 is not connect in existing stmount railway station and why build it the new staton in parallel..,if they connecgt existing station the new station cost is saved and easy to connection when the same strech to sollingallur to centrel it easy to pasengers
Is there track shift from alandur to stm for both L2,L5, and existing station for L5 and newly constructed for L2?
Yes. there will be a track shift . Thanks.
Line 5 is not crossing only over the flights taking off in meenambakkam airport😂
Thank you.
Chennai metro..❤ சென்னை மெட்ரோ திட்டத்திற்கு ஒப்புதல் அளித்துள்ளது. சென்னை மெட்ரோவின் தந்தை. MK Stalin. Chief minister of Tamil Nadu.. good thinking😅😅😅😅😅❤
NO POLITICS PLEASE. THANKS.🙏
Update drone shot
Sorry.no drone shot. Thanks.