Time-History Analysis of a (G+9)-Story Building in SAP2000.

Поделиться
HTML-код
  • Опубликовано: 10 дек 2024

Комментарии • 9

  • @AhmetCorut52
    @AhmetCorut52 Год назад +1

    You are the best one. Thank you 👏👏👏

  • @samira-ut8mx
    @samira-ut8mx 4 месяца назад

    it is very helpful, thanks🙏

  • @ZanyarGhaneei
    @ZanyarGhaneei 3 месяца назад

    very nice and practical

    • @SmartEngineer2
      @SmartEngineer2  Месяц назад +1

      @@ZanyarGhaneei Thanks for your valuable words

  • @arianahmed5132
    @arianahmed5132 2 месяца назад

    I am doing NLTHA in Etabs can you guide me how long does it take to complete the whole analysis? my building is G+13

    • @SmartEngineer2
      @SmartEngineer2  Месяц назад

      @@arianahmed5132 it depends upon ur computer power, and which type of analysis you are conducting?

    • @arianahmed5132
      @arianahmed5132 Месяц назад

      @@SmartEngineer2 I am conducting Direct Integration but i switched to FNLA because it was taking so much time. I also have another question as well, i wanted to show the acceptance points in the deformed shape tool, whenever i check the box and apply also set the time to absolute max it doesnt show. The only way i can see is through the performance checks or by setting the D/C ratios. Am i doing something wrong?