[Last CGL Train][SMRT] C151A (507/508) from Changi Airport to Tanah Merah(CHD)
HTML-код
- Опубликовано: 18 сен 2024
- Recorded on 03/09/2021 → 04/09/2021
-Train Details
C151A (507/508) (Batch 1)
Build By: Kawasaki Heavy Industries & CSR Qingdao Sifang
Year Build: 2010
Year Entered Service: 2011
Year Refurbished: N/A
Motor: IGBT-VVVF (Fuji Electric)
TRN: 102
Wow, very rare for a C151A to be the last CGL train :)
When taking public transport, please wear a mask, refrain from communicating with others commuters and practice good personal hygiene. Also it is highly recommended to scan the SafeEntry QR code at the MRT stations. Together we can beat COVID-19.
Train service timings and interval will be the same as Pre-Circuit Breaker.
Click on this link for train service changes on the
Sengkang-Punggol LRT
www.instagram....
Only the Changi Airport Skytrain service between T1 and T3 will be in operation.
KTM Shuttle Tebrau service has be suspended until further notice.
(Information As Of 01/09/2021)
If you like to use this video or have any enquire you can send me an email:
singaporetrainschannel@gmail.com
Follow me on Instagram:
/ singapore_trains_channel
Thanks for showing Changi branch line :D
Thanks for showing Changi branch line
You will come back to the airport tomorrow for the skytrain.
Old Changi Airport PSD signage
0:44 robot cleaner
Why there's 2 train outside?
Ok
Maybe there are 2 last train and the one outside may withdraw to either CHD, UPD, TWD or Tuas Depot.
This C151A set is the last train so, the one outside finish service and will return to the depot to rest for the next day
those 2 going back to CHD