  • Here's some latest footage, images and updates of the 6J46 Peak Forest - Salford Hope Street derailment that happened above Sidmouth Street in Audenshaw on Friday 6th September 2024. After getting a heads up that the Stricken HYAs were getting re-railed at the start of the week and that Colas Rail Class 56 No. 56090 was to do the honours of moving the wagons towards Crowthorne Junction we were hoping that the operation would take place once we'd finished work but unfortunately it didn't, so the only footage we've manage to capture so far was taken on Thursday evening after work and it involved Volker Rail owned Kirow Crane DRK 81613 attempting to re-rail the remaining HYAs that are still off the tracks. After chatting to the Network Rail staff we've been told that they won't be replacing the bridge, they'll instead be repairing it by reinforcing it by putting in new steel girders and timbers as well as also fixing any other minor faults. With D1015 passing down here on the first Saturday in December we're hoping that everything will be back to normal by then.

Комментарии • 25

  • @RedShedNick
    @RedShedNick 10 дней назад +2

    Great update lads, and yes must be up and running for December, its essential! Cheers Nick.

    • @trainsurfers
      @trainsurfers  10 дней назад +1

      Cheers Nick, yeah looking forward to seeing D1015 powering up the bank passed the Reservoirs.

    • @RedShedNick
      @RedShedNick 9 дней назад

      ​@@trainsurfersReally look forward to that.

    • @davidsnapebrcrosslane8782
      @davidsnapebrcrosslane8782 9 дней назад

      When ?​@@trainsurfers

    • @trainsurfers
      @trainsurfers  9 дней назад

      @@davidsnapebrcrosslane8782 7th December

  • @bobtudbury8505
    @bobtudbury8505 3 дня назад

    how many manpower??

  • @ЛЬВИНИ
    @ЛЬВИНИ 7 дней назад

    Great video.

  • @neilcrawford8303
    @neilcrawford8303 9 дней назад

    Nice record of some of the recovery work.
    At first I thought that was a lot of weight for the bridge span to take, what with the crane taking the weight of the wagon. That's a lot of weight on the crane jacks. Then I noticed they'd shored up the bridge from underneath, with timber packers. and props.

    • @trainsurfers
      @trainsurfers  2 дня назад +1

      Cheers, yeah just 3 of the HYA's are left now, 2 still not on the rails properly yet. Yeah the bridge is properly secured now.

  • @RichardMitchell-ut1uc
    @RichardMitchell-ut1uc 10 дней назад

    Nice catch lads - is that the first time a Kirow crane has been used to clear up a derailment in the UK?

    • @trainsurfers
      @trainsurfers  9 дней назад +1

      Cheers Richard, we couldn't tell u tbh

  • @thetrainspotters502
    @thetrainspotters502 10 дней назад

    Great video mate glad the team are making progress such an unfortunate thing to happen

    • @trainsurfers
      @trainsurfers  10 дней назад +1

      Cheers, yeah the operation is going well at the moment.

  • @DavidGlover-u8i
    @DavidGlover-u8i 10 дней назад

    What diversion route are the freight trains taking?

    • @trainsurfers
      @trainsurfers  10 дней назад

      There going via Guide Bridge, the biomass trains from Yorkshire are going via Ashton Moss.

    • @DavidGlover-u8i
      @DavidGlover-u8i 9 дней назад

      @@trainsurfers Thanks for the info👍

  • @cannadineboxill-harris2983
    @cannadineboxill-harris2983 10 дней назад +1

    I needed to know why they couldn’t dig a tunnel and do an extension for most of the mainline Trains so that they could extend the unused abandoned underground train stations. Why couldn’t they use the part D78 Stock train doors on the sides and also restructure the front face of the A60 and A62 stock which will include the class 507, class 508, class 313, class 314 and class 315 remix and make them all together and also redesign all of them into an overhead wire line trains and also make most of them into Five carriages per units and also having three Disabled Toilets on those Five cars per units A60 and A62 stock trains and also convert the A60 and A62 stock trains into a Gardner 6LXC, Cummins M11, Volvo B10M, Gardner 6LXB, Gardner LG1200 and Gardner 8LXB Diesel Engines and also put the Loud 7-Speed Voith Gearboxes even Loud 10-Speed Leyland Hydra cyclic Gearboxes in the A60 and A62 stock, class 507, class 508, class 313, class 314, and class 315 and also modernise the A60 and A62 stock and make it into 11 carriages per unit so it could have fewer doors, more tables, computers and mobile phone chargers? A Stock Train and 8 Disabled Toilets on those A stock trains. why couldn’t we refurbish and modernise the waterloo and city line Triple-Track train tunnel and make it even much more Larger and extend it to the bank station, making it into a Triple-Track Railway Line so those Five countries such as Australia, Germany, Italy, Poland And Sweden to convert the waterloo and city line Triple-Track Railway tunnel into a High-Speed Railway lines? The Third Euro tunnel Triple-Track Railway line to make it 11 times better for passengers so they could go from A to B. Then put the modernised 11 carriages per unit A Stock and put them on a bigger modernised Waterloo and city line Triple-Track train tunnel so it could go to bank station to those Five countries such as Australia, Germany, Italy, Poland And Sweden. The modernised refurbished 11 carriages per unit A stock could be a High Speed The Third Triple-Track Euro Tunnel Train So it is promising and 47 times a lot more possible to do this kind of project if that will be OK for London Australia, Germany, Italy, Poland And Sweden. oh by the way, could they also tunnel the Triple-Track Railway Line so it will stop from Buckinghamshire, Hertfordshire and Essex so that the Passengers will go to Australia, Germany, Italy, Poland and Sweden and also extend the Triple-Track Railway Line from the Bank to Buckinghamshire, Hertfordshire and Essex Stations so that more people from there could go to Australia, Germany, Italy, Poland And Sweden more Easily. Why couldn't they extend the Piccadilly Line and also build brand-new underground train stations so it could go even further right up to Clapton, Wood Street can they also make another brand new underground train station in Chingford and could they extend the Piccadilly Line and the DLR right up to Chingford? All of the classes 150, 155, 154, 117, 114, 105, and 106, will be replaced by all of the Gardner 6LXC, Cummins M11, Volvo B10M, Gardner 6LXB, Gardner LG1200 and Gardner 8LXB Diesel Five carriages three disabled toilets are air conditioning trains including Highams Park for extended roots which is the Piccadilly line and the DLR trains. Could you also convert all of the 1973 stock trains into an air-conditioned maximum speed 78 km/hours (48 MPH) re-refurbished and make it into a 8 cars per unit if that will be alright, and also extend all of the Piccadilly train stations to make more space for all of the extended 8 car per unit 1973 stock air condition trains and can you also build another Mayflower and Tornado Steam Locomotive Companies and can they order Every 87 Octagon and Every 48 Hexagon shape LNER diagram unique small no.13 and unique small no.11 Boilers from those Countries such as Greece, Italy, Poland, and Sweden, can they make Mayflower and Tornado Steam Locomotive speeds by up to 147MPH so you can try and test it on the Original Mainline so it will be much more safer for the Passengers to enjoy the 147MPH speed Limit only for HS2 and Channel Tunnel mainline services, if they needed 16 Carriages Per units, can they use those class 55’s, class 44’s, class 40’s and class 43HST Diesel Locomotive’s right at the Back of those 18 Carriages Per Units so they can take over at the Back to let those Mayflower and Tornado Steam Locomotive’s have a rest for those interesting Journeys Please!!!!, oh can you make all of those 18 Tonne Boxes of Coal for all of those 147MPH Mayflower and Tornado Steam Locomotive’s so the Companies will Understand us PASSENGER’S!!!! So please make sure that the Builders can do as they are told!!!!!! And PLEASE do something about these very very important Professional ideas Please? Prime Minister of England, Prime Minister of Australia, Prime Minister of Sweden, Prime Minister of Germany, Prime Minister of Italy, Prime Minister of Poland and that Includes the Mayor of London.

    • @paulbissitt4754
      @paulbissitt4754 10 дней назад +2

      WHAT? Sorry but I fell asleep reading this drivell You seem to have "lost the plot".Are you feeling OK?

    • @pitbing
      @pitbing 10 дней назад +1

      Your proposals are all in hand. Once the Audenshaw derailment is cleared, work will start as soon as possible.

    • @TheNightOwl-ef7ih
      @TheNightOwl-ef7ih 10 дней назад

      @@paulbissitt4754 It bothers me that people like that are allowed to use the internet or even walk the streets unaccompanied. Maybe it was his Carer's day off?

    • @Billybutlin46
      @Billybutlin46 10 дней назад +1

      What was the question again?

    • @trainsurfers
      @trainsurfers  10 дней назад +1

      WTF are you on about?