Railfanning Elmwood Park and Saddle Brook, NJ 9/25/2015 (Part 1)

Поделиться
HTML-код
  • Опубликовано: 15 окт 2024
  • This video was shot at the Midland Ave crossing in Elmwood Park, New Jersey
    I've been planning another trip out to these crossings, and when i heard this crossing has been upgraded, i came out to film theses 2 crossings.
    To make this crossing safer, NJ DOT has installed new traffic lights at this crossing. These traffic lights, when activated will stop traffic from stopping on the tracks.
    The crossing itself also got some new LED crossing lights. Check the crossing info section for that.
    Crossing Info:
    Signal on right: 3 pairs of Safetran 12x24 inch LED lights, a WC Hayes gate motor and a Safetran mechanical bell.
    Signal on left: 2 pairs of Safetran 12x24 inch LED lights, a Safetran gate motor and a Safetran mechanical bell.
    Enjoy!
    TM & Copyright © 2015 by Freedomtowerman Productions®
    All Rights Reserved

Комментарии • 36

  • @MobileRailSpotterRxR
    @MobileRailSpotterRxR 9 лет назад

    Nice! Good thing they kept the mechanical bells.

    • @FreedomtowerStudios
      @FreedomtowerStudios  9 лет назад +1

      +Crossing Railfan Cal Thank You!
      Yeah i know, NJ Transit keeps mechanical bells at there crossings after upgrades.

    • @realimbored668
      @realimbored668 9 лет назад +1

      +Freedomtowerman Productions I would've added a GS Type 1 e bell next to the mechanical bell to have both ring when the gates lower and the e bell to ring until gates rise just to keep people aware that the signals are on, and add gateless masts with Safetran Type 1 e bells because two gated masts just look too empty to me

  • @freebrickproductions
    @freebrickproductions 9 лет назад

    What did the old signals have?

    • @FreedomtowerStudios
      @FreedomtowerStudios  9 лет назад +1

      +freebrickproductions Same as these, nothing has changed to crossing signals, execpt the crossing got LED lights.

  • @TheGlenRockianRailfan
    @TheGlenRockianRailfan 9 лет назад

    Does anyone know when the Westmont Station on the Bergen line will open?

    • @FreedomtowerStudios
      @FreedomtowerStudios  9 лет назад

      +glen rock railfan I asked a NJ Trasnit worker that, he said there is no offical date to when that will be open.

  • @atheman90
    @atheman90 3 года назад

    Wait. Why does the train at 3:30 have Metro-North cars, but an NJ Transit locomotive? Shouldn’t they match?

    • @FreedomtowerStudios
      @FreedomtowerStudios  3 года назад

      Not necessary, NJ Transit and Metro North share equipment when needed.

    • @atheman90
      @atheman90 3 года назад

      @@FreedomtowerStudios I see your point, but how will people know if it’s Metro-North or NJ Transit? Just wondering.

    • @FreedomtowerStudios
      @FreedomtowerStudios  3 года назад

      @@atheman90 All NJ Transit trains will show up on a schedule, (Suffern and East). This line ends at Suffern NY, but because NJ Transit serves Port Jervis and all Metro North stops (Suffern to Port Jervis) they also share equipment. Its really complicated

    • @atheman90
      @atheman90 3 года назад

      @@FreedomtowerStudios good to know.

  • @theresapriolette9222
    @theresapriolette9222 9 лет назад

    at 2:20 and 2:25 why gate lift up half and lift down with other train come?

    • @realimbored668
      @realimbored668 9 лет назад

      The vehicles that passed were too small to keep the gates consistently down

  • @LibertyRailfan
    @LibertyRailfan 9 лет назад

    Nice video Vinny.

  • @NorfolkSouthernES44AC
    @NorfolkSouthernES44AC 9 лет назад

    Nice video!!

  • @thomasvadeika2119
    @thomasvadeika2119 9 лет назад

    (2:05) What was that???????

  • @TheGlenRockianRailfan
    @TheGlenRockianRailfan 9 лет назад

    Good job! I wish I had the time to go there.

  • @AmtrakProductions
    @AmtrakProductions 8 лет назад

    Come here again plz.

    • @FreedomtowerStudios
      @FreedomtowerStudios  8 лет назад

      +Amtrak productions I will when the traffic lights (the ones that are bagged) get activated. Im guessing sometime early next year.

    • @AmtrakProductions
      @AmtrakProductions 8 лет назад

      +Freedomtowerman Productions why not yet? This was filmed in November or October

    • @AmtrakProductions
      @AmtrakProductions 8 лет назад

      +Freedomtowerman Productions September! It is crazy! Wouldn't it be done now

    • @FreedomtowerStudios
      @FreedomtowerStudios  8 лет назад

      Amtrak productions I just went by this crossing on Friday, December 20th when i was on my way into the city, the lights are still covered up. My guess is they will have the lights working again in January, but knowing how slow Elmwood Park is with installing lights, its anyone's guess.

    • @AmtrakProductions
      @AmtrakProductions 8 лет назад

      +Freedomtowerman Productions when ashland got traffic lights( see ep 45) it took 2 weeks to set up

  • @chrisc95367
    @chrisc95367 9 лет назад

    I upload new train vid

  • @XXMETAL4LIF3XX
    @XXMETAL4LIF3XX 8 лет назад

    amazing they need all this upgrading to keep people from driving against the signals.