@helendennis3260 1. Pools 71 , cost per one is Ghc 230 = Ghc16,330 2. PANELS 426, cost per one is Ghc 90 = Ghc38,340 3. cement 20bags, cost of one is Ghc100 = Ghc2,000 4. Sand and stone is Ghc3,000 5. WORKMANSHIP Ghc15,000 6. water Ghc1,000 7. Total Ghc 75,670
@ 1. Pools 71 , cost per one is Ghc 230 = Ghc16,330 2. PANELS 426, cost per one is Ghc 90 = Ghc38,340 3. cement 20bags, cost of one is Ghc100 = Ghc2,000 4. Sand and stone is Ghc3,000 5. WORKMANSHIP Ghc15,000 6. water Ghc1,000 7. Total Ghc 75,670
@@julielartey9352 1. Pools 73 ,one is Ghc250 =Ghc18,250. 2. PANELS 438, one is Ghc100 =Ghc43800. 3. Cement 28bags, one is Ghc100 = Ghc 2,800 4. Water Ghc 1,000 5. Sand & stone Ghc3,000 6. Workmanship Ghc18,000 Total Ghc 86,850
You've mentioned precast building will last 70 years. So after 70 years building will crumble. Some one needs to rebuilt with cement,bricks and steels so precast is not logically, financially the right choice for a home.
I've seen precast in Kenya for building homes everything ,I didn't know Ghana has it
Please how much this will cost for 2 plot and is 70 by 100
@helendennis3260
1. Pools 71 , cost per one is Ghc 230 = Ghc16,330
2. PANELS 426, cost per one is Ghc 90 =
Ghc38,340
3. cement 20bags, cost of one is Ghc100 = Ghc2,000
4. Sand and stone is Ghc3,000
5. WORKMANSHIP Ghc15,000
6. water Ghc1,000
7. Total Ghc 75,670
@menselghanalimitedltd9518 please can I get your WhatsApp number?
Hi what’s the price of the little building please thank You for sharing
@@SoftLifeFamilyLimitedVoltaR1 The price is Ghc 25,000
@ thank You for your response
Please give me cost for fencing my 70/100 wall
@
1. Pools 71 , cost per one is Ghc 230 = Ghc16,330
2. PANELS 426, cost per one is Ghc 90 =
Ghc38,340
3. cement 20bags, cost of one is Ghc100 = Ghc2,000
4. Sand and stone is Ghc3,000
5. WORKMANSHIP Ghc15,000
6. water Ghc1,000
7. Total Ghc 75,670
Please may I know the cost of 100feet by 110ft wall thanks
@@julielartey9352
1. Pools 73 ,one is Ghc250 =Ghc18,250.
2. PANELS 438, one is Ghc100 =Ghc43800.
3. Cement 28bags, one is Ghc100 = Ghc 2,800
4. Water Ghc 1,000
5. Sand & stone Ghc3,000
6. Workmanship Ghc18,000
Total Ghc 86,850
We're is the factory in Ghana
Dowdowa
You've mentioned precast building will last 70 years. So after 70 years building will crumble. Some one needs to rebuilt with cement,bricks and steels so precast is not logically, financially the right choice for a home.