DILO Tutorial: Measurements of SF6 Gas Multi Analyzer V1

Поделиться
HTML-код
  • Опубликовано: 27 авг 2024
  • This tutorial series provides helpful information on the settings of the SF6 Gas Multi Analyzer.

Комментарии • 2

  • @badar646
    @badar646 Год назад +1

    what is the inspection requirement of this machine? for example 3rd party inspection is required after how many months or years?

    • @dilocompanyinc.6810
      @dilocompanyinc.6810  Год назад

      Thanks for your question!
      We invite you to learn more about calibration cycles at DILO’s blog: dilo.com/blog/article/importance-of-sf6-calibration-cycles-information
      For this analyzer system, the required service interval for the electrochemical sensor is two years. However, we recommend a minimal annual inspection as a best practice.
      Charging the battery:
      To avoid a deep discharge of the installed battery, it is recommended to charge the battery after a period of 6 months latest. This is advised if the MultiAnalyserSF6 will not be used for an extended period of time. The battery should be charged completely before an extended period of nonuse.
      Please don’t hesitate to contact sales@dilo.com if you have any questions.