CQCX Series Magnetic Track Light installation manual

Поделиться
HTML-код
  • Опубликовано: 29 сен 2024
  • CQCX-Q100 Embedded Magnetic Track installation manual
    1. Splicing tracks according to actual needs
    2. Insert the rail connector, dock the rail, and tighten the screws
    3. Insert the rail connector, dock the corner rail, and tighten the screws
    4. Install the straight connector and the corner connector into the track straight joint and corner joint respectively
    5. The 24V built-in power supply is connected to the reserved wire and put into the track
    6. Install the lamps for lighting test
    7. Install the dust cover
    8. Fix the end caps at both ends of the track
    9. Track into the ceiling - Fix with screws - Putting gypsum board - Fix with screws - plaster repair - paste mesh - batch putty - paint
    10. Remove the dust cover
    11. The 24V built-in power supply is connected to the reserved wire and put into the track
    12. Fit the straight connector into the straight joints
    13. Fitting corner connectors into horizontal corner joints
    14. Install lamps
    CQCX-M100 Surface Mounted Magnetic Track installation manual
    1. Splicing tracks according to actual needs
    2. Insert the rail connector, dock the rail, and tighten the screws
    3. Fix the end caps at both ends of the track
    4. Drive expansion screws into the reserved openings in the ceiling
    5. Put the track on the ceiling according to the positioning
    6. Fix with screws
    7. Fit the straight connector into the straight joints
    8. The 24V built-in power supply is connected to the reserved wire and put into the track
    9. Install lamps
    Click the link to know more
    www.aliexpress...

Комментарии •