Project Finance Model for Interviews from Hell and A-Z Model

Поделиться
HTML-код
  • Опубликовано: 15 окт 2024
  • Works through ideas on how to make a complete financial model from blank sheet with ideas on what to do in interview. Find file at www.edbodmer.com

Комментарии • 38

  • @BryceBarbier
    @BryceBarbier 2 года назад +15

    “I should say I’m drinking while I’m making this video it’s probably not a good idea” consider me subscribed….

  • @1503sanity
    @1503sanity Год назад +16

    Most helpful resource out there. Singlehandedly prepared me for a job interview (and I got the job) from a non-existent baseline knowledge. Thank you so much, Ed!

  • @MrOmertemiz
    @MrOmertemiz 3 года назад +9

    I cannot understand how this video has been watched just 1.5k. This video lecture worth thousands of dollars.. thank you Ed Bodmer.

  • @rodrigocordova92
    @rodrigocordova92 2 года назад +1

    Sir, as soon I heard you were having a drink, I immediately went for something to join you. Thank you and excellent video.

  • @Difrisco1
    @Difrisco1 2 года назад +2

    Many many thanks Ed, I studied your video for two days and it was SUPER helpful for a job interview. Great job!!!

  • @FinancialModelDetective
    @FinancialModelDetective 3 года назад +9

    That’s extremely useful, clear and fun to watch. I have so many people to share this video with. Thanks Ed

  • @sl9081
    @sl9081 5 месяцев назад

    Wow this is super insightful, thank you for the Ed!!

  • @11dudekk22
    @11dudekk22 3 года назад +2

    This is great. Easy to follow and understand. Thanks Ed.

  • @MrOmertemiz
    @MrOmertemiz Год назад +1

    Hello sir, I hope you see this message,
    Today I watched this video again in for refresh, I have just realized one little thing, I might be confused maybe.
    As you know, you built your model monthly for construction period and yearly for operation period. When you were making calculation for interest, especially for the interest during construction, although interest input is 3% yearly, you took this interest rate as is.
    What I thought is, should not we use roughly 3%/12 when we are calculating interest during construction ? This change has huge impact on debt amount on cash flow and P&L, it makes equity IRR almost double when interest rate considered monthly.
    Thank you very much again for this amazing tutorial, I hope to see in person in the future.

    • @Ozlmsnt
      @Ozlmsnt Год назад

      Selam, IDC ne demek ve neden IDC depreciation ile IDC tutarları aynı oldu?

    • @MrOmertemiz
      @MrOmertemiz Год назад

      Selam, IDC interest during construction demek. IFRS ve USGAAP'e gore insaat suresinde ortaya cikan faiz aktiflestirilir, dolayisi ile ayni sabit kiymetlerdeki gibi amortismana tabidir. Sabit kiymetin amortisman suresi ile ayni surede amortisman ayrilir. Sanirim Turkiye VUK'a gore aktiflestirilmiyor, giderlestiriliyor. @@Ozlmsnt

  • @carlosantoniotabernilla
    @carlosantoniotabernilla 3 года назад +3

    This is awesome Ed!!!

  • @thomasjp95
    @thomasjp95 10 месяцев назад +1

    This is great. Some questions:
    1) For a 1 hour PF modelling test isn't this method (of flags I mean) time consuming? Are there any alternatives?
    2) When calculating the start/end period, why not have it exactly as 1 Jan - 31 Jan, 1st feb-28th feb and so on?
    3) Do you have any 1 hour model exams? I checked your interviews from hell and it seems like most of them are longer
    4) Shouldn't CFADS also be netted of capex?

    • @CandlerCapital
      @CandlerCapital 10 месяцев назад

      Also looking for shorter model exams. Can you lmk if you find anything?

    • @givenchybw7636
      @givenchybw7636 10 месяцев назад

      anyone found shorter model exams?@@CandlerCapital

    • @damatter3314
      @damatter3314 4 месяца назад

      I have a 1 hour test coming up as well - wondering if you've found anything?

  • @narminaskerzade3171
    @narminaskerzade3171 2 года назад +5

    Hello Ed! when you calculate the interest , shouldn't it be calculated differently for construction period since each period i s equal to a month while the interest rate is an annual rate? i am kind of confused here

  • @rosecurran7050
    @rosecurran7050 Год назад

    Bodmer for President! Yes!

  • @pacifista00
    @pacifista00 2 года назад

    worth its weight in gold, thank you Ed

  • @shubhendukumar1972
    @shubhendukumar1972 3 года назад +1

    lots of knowledge with great fun. thanks

  • @nickyasmr1601
    @nickyasmr1601 2 года назад

    EDWARD BODMER, thank you!

  • @lasse6758
    @lasse6758 3 месяца назад

    I believe your IDC is off? The annual 3% rate is applied monthly during construction

  • @7indevon261
    @7indevon261 29 дней назад

    Please may someone drop the link to the file on his website? I have tried to look but had no luck

  • @JohnOwens0
    @JohnOwens0 11 месяцев назад

    Also, the interest calculation uses the full rate during the construction period even though the construction period is modelled monthly. Should that formula for interest expense factor the number of months in the period for the calculation of interest which is rolling into IDC?

  • @sn00pryan
    @sn00pryan 26 дней назад

    Isn't depreciation and inflation wrong because you're using an annual % on a monthly timeline?

  • @gonzalemoigne3391
    @gonzalemoigne3391 2 года назад

    Thanks for the class!

  • @danielcachafeiro2590
    @danielcachafeiro2590 2 года назад +1

    Hope somebody, can help me out. Why did we not consider debt repayment on profit and loss? Did we at any point consider the compounded interests? I see that the interests were calculated from an increasing draws, are they considering compounded interest from the IDC/circular reference? Thanks!

  • @JohnOwens0
    @JohnOwens0 11 месяцев назад

    The video says "gearing" is 80%. Should that say "leverage"? My understanding is that there's 80% of the cost available as debt, which would mean 80% of the capital structure is debt.... and then when i think of gearing I think of D/E (as opposed to D/(D+E)).

  • @alexandereuripidou5653
    @alexandereuripidou5653 2 года назад

    Subscribed. Formulas and shortcuts great. Way laid out is great.
    The periods have been confusing me the whole time. Can see monthly at 1:28:10 then can see yearly at 1:27:07. I've done 240 months in my model but IRR shits itself. With interest in monthly model I did the (1+1%)^(1/12)-1 to get the monthly interest on ops and revs, does this sound right?

  • @huiyichen3960
    @huiyichen3960 3 года назад +3

    could you share the excel after work? Edward? thanks

  • @andrewrzn2248
    @andrewrzn2248 3 года назад

    Great video, thank you!

  • @giuandrei
    @giuandrei Год назад

    This is gold

  • @nicolaskyriakoglou735
    @nicolaskyriakoglou735 2 года назад +1

    Hi Ed - When gearing is changed (i.e. 80%), after pressing the macro button in your model, DSCR at the end is 0.30 instead of FALSE. Any idea why this might be?

    • @sophiax6788
      @sophiax6788 Год назад +1

      I had the same issue. It’s because of your dates. The last period should be in 2041, and delete the invalid ones beyond that

  • @Ozlmsnt
    @Ozlmsnt Год назад

    Everything is calculated in the capex period so we see the 0s, I couldnt catch the formulas in depth..

  • @kfzar908
    @kfzar908 3 года назад +2

    Why no eomonth lol?

  • @davidmuirhead8489
    @davidmuirhead8489 3 года назад

    gold