Massive ring-shaped coil goes into storage

Поделиться
HTML-код
  • Опубликовано: 8 сен 2024
  • In August 2023, poloidal field coil #4 (24m in diameter and weighing 350 tonnes) was moved from the European Poloidal Field Coils factory on the ITER site to a storage facility nearby. Its near clone, poloidal field coil #3, is ready for cold testing, and is expected to be handed over to the ITER Organization in the spring of 2024. By then, Europe will have delivered the 5 ring-shaped poloidal field coils it was responsible for...

Комментарии • 30