Information is very useful and technical but in civil construction there is no skilled manpower and skilled Engineers They even don't follow the basic technical things
After providing spout weep pole , concrete with cinder will b filled in sunken area these the spout provisions done may get block can u explain what exactly happens here.
Good video. If the toilet is on the exterior wall then this weep hole pipe can be discharged to the outside landscape area thru wall. Here the point to be noted is that the slope of W proof and screet conc should be towards nahani trap side and the weep pipe must be laid on that edge side.
I am a civil engineer with 33 years of field experience here in India. ALWAYS waterproof the sunken floor and walls ( upto 2'6) , and the GROOVES in walls, BEFORE laying the pipes. The leakage water between floor tiles, should ideally be taken out from a lowest point of the water proofed floor, that should be away from the corner of the other main pipes exit point. Better to use 1.5" pipe and not 1" as excess leakage water extraction. Also the 4 " and other pipes SHOULD NOT TOUCH, or sides of the opening the floor..and a gap of 1"-2" be maintained..this is to allow for proper waterproofing around the exit point in the wall / beam..else there is chance of leakage from under/ side portion of the large pipes, as packing cannot be done if it touches the floor/ sides.
After providing spout weep pole , concrete with cinder will b filled in sunken area these the spout provisions done may get block can u explain what exactly happens here.
@@IHF625Blocks in the spout happens due to removal of lime from concrete due to seepage through concrete and this is called leaching of lime. This leached out lime combines with CO2 from atmosphere/outside and harden in to Calcium carbonate and this CaCO3 blocks the spout over a long period.
1. Is foundation compulsary for ground floor inner partion walls of 4 inch ? Plinth beam aren't enough baae for these wall. Proper colum, tie beam are also there. 2. Except RCC work (Column/ Beam/Slab) want to replace cement with limestone. For walls and plaster. Please suggest which is best limeRed brick / flyash or Acc blocks ?
Though idea is for any future leakage but this is total waste of money. I have it in my building with 1.5 inch pipe, best is to go with waterproofing or cement liquid plastering.(it’s cheap and meaningful)
Spout is a must and the pipe should protrude out. If water drops starts coming out, it's fire warning that there's seepage inside the sunken slab which requires remedy sooner or later @@kiteinair12
The centre pipe should be of such height that it's within cinder filled depth so that the pipe remains open even after laying water proofed concrete above cinder. As long the vertical pipe is open, it will not allow seepage water to stagnate and gets thrown out through spout.
भईया एक वीडियो बेसमेंट पे लाईए की किस प्रकार मैनुअली खर्चा आता है मींस लेबर कितना लेती है किस प्रकार चार्ज करती है मैनुअली और एक्सकेवेटर से क्या खर्चा आता है और मैनुअली और एक्सकेवेटर दोनों मिलाने के बाद बेसमेंट फिनिशिंग का क्या खर्चा आ जाता है
OMB WALL MAGIC COAT 🔥 क्या आप गर्मी से परेशान हैं क्या आप गर्मी से मुक्त होना चाहते हैं यदि हा तो हम आपके लिए लाए हैं गर्मी कम करने वाली बाहरी कोटिंग अंदरूनी सतह को लंबे समय तक ठंडा रखता है 🔥🔥🔥🔥🔥🔥🔥🔥🔥
आप की जानकारी अनमोल है। सीधा और सच्चाई तरीके से आप बताते हैं धन्यवाद 🙏🏼🙏🏼👏
I am a civil engineer and I really appreciate your points
भईया नमस्कार बहुत ही शानदार तरीके से आप समझाते है,शायद ही यूट्यूब पे कोई इस तरह समझाता हो🙏🏻खुश रहिए आप हमेशा
Kya yeh ground floor k liye applicable hai.? Please answer.
अदभुद जानकारी हे ये धन्यवाद
Exceptional point
God Bless You Brother
Bahut badiya jaankari. Small suggestion, if the pipes had been pointed out by arrow or circling it would be easier to understand 🙏
Sir ye jo bich m pipe end cap ke sath stand ker raha h ,vo jara clear ker de, bus yahi canfusion h
Sir iske liye spout lgaya jata h aur sunken ki waterproofing mai slope deke spout lga diya jata h ismai pani ni jayga kaise bu
Information is very useful and technical but in civil construction there is no skilled manpower and skilled Engineers
They even don't follow the basic technical things
Excellent information
Sir duck me kaunsa water proofs use kare
Very good nice good job 👏
After providing spout weep pole , concrete with cinder will b filled in sunken area these the spout provisions done may get block can u explain what exactly happens here.
Good video. If the toilet is on the exterior wall then this weep hole pipe can be discharged to the outside landscape area thru wall. Here the point to be noted is that the slope of W proof and screet conc should be towards nahani trap side and the weep pipe must be laid on that edge side.
👌👌👌
whats that protruding pipe in center
ye pipe khangar ke layer mein dalega?
Good Information provided by you
Very good. Sir
Sir sb kuch to bta diya but mera qus ye tha ki humko jo area bach jata h usme kya fill krna chahaye
jo pipe dalege to tiles lagane par band ho jayega to
Nice video bhaiya 👌👌
I am a civil engineer with 33 years of field experience here in India.
ALWAYS waterproof the sunken floor and walls ( upto 2'6) , and the GROOVES in walls, BEFORE laying the pipes.
The leakage water between floor tiles, should ideally be taken out from a lowest point of the water proofed floor, that should be away from the corner of the other main pipes exit point.
Better to use 1.5" pipe and not 1" as excess leakage water extraction.
Also the 4 " and other pipes SHOULD NOT TOUCH, or sides of the opening the floor..and a gap of 1"-2" be maintained..this is to allow for proper waterproofing around the exit point in the wall / beam..else there is chance of leakage from under/ side portion of the large pipes, as packing cannot be done if it touches the floor/ sides.
After providing spout weep pole , concrete with cinder will b filled in sunken area these the spout provisions done may get block can u explain what exactly happens here.
@@IHF625Blocks in the spout happens due to removal of lime from concrete due to seepage through concrete and this is called leaching of lime. This leached out lime combines with CO2 from atmosphere/outside and harden in to Calcium carbonate and this CaCO3 blocks the spout over a long period.
Sir ager kbhi is toilet me cloth cla gye tho isme se nikal gyega
1. Is foundation compulsary for ground floor inner partion walls of 4 inch ? Plinth beam aren't enough baae for these wall. Proper colum, tie beam are also there.
2. Except RCC work (Column/ Beam/Slab) want to replace cement with limestone. For walls and plaster. Please suggest which is best limeRed brick / flyash or Acc blocks ?
whre would be exit point of pipe
Nice video.
Sir for Ground Floor House from overhead Tank what size outlet pipe has to be used to get the correct water pressure
How to install bathtub in 1st floor without sunken floor? So that floor level remains the same
Esme hoke Paani undar bhi to Jaa Sakta hai???
Though idea is for any future leakage but this is total waste of money. I have it in my building with 1.5 inch pipe, best is to go with waterproofing or cement liquid plastering.(it’s cheap and meaningful)
this is supposed to go over water proofing...if u water proof and there is a leak above where will the water go ?
Spout is a must and the pipe should protrude out. If water drops starts coming out, it's fire warning that there's seepage inside the sunken slab which requires remedy sooner or later @@kiteinair12
It's fore warning not fire warning
If bathroom is in High rise towers.. wat would be exit point of pipe
Bhaiya 1st floor ke bathroom ko change karna cah rahe h to bathroom me kya karaye jisse ground floor pe silan na aye please reply bhaiya
waterproofing to krna he hoga
Right
Sir fir center ke pipe ka kya use h
The centre pipe should be of such height that it's within cinder filled depth so that the pipe remains open even after laying water proofed concrete above cinder. As long the vertical pipe is open, it will not allow seepage water to stagnate and gets thrown out through spout.
Cpvc ya PPR . Kon sa best h
Both
It won’t work as it will be blocked while putting tiles and mortar
भईया एक वीडियो बेसमेंट पे लाईए की किस प्रकार मैनुअली खर्चा आता है मींस लेबर कितना लेती है किस प्रकार चार्ज करती है मैनुअली और एक्सकेवेटर से क्या खर्चा आता है और मैनुअली और एक्सकेवेटर दोनों मिलाने के बाद बेसमेंट फिनिशिंग का क्या खर्चा आ जाता है
Old video chk kre
Agar maan lijiye koi 110 mm ki pipe hi leak ho gayi to uska pani leakage pipe me kaise jayega
weep hole ya v pole
Confirm nahi hai lekin naam iska yahi hai
बाथरूम के फर्श में पत्थर के जोड़ और कोने को लीक प्रूफ कैसे करें।
OMB WALL MAGIC COAT 🔥 क्या आप गर्मी से परेशान हैं क्या आप गर्मी से मुक्त होना चाहते हैं यदि हा तो हम आपके लिए लाए हैं गर्मी कम करने वाली बाहरी कोटिंग अंदरूनी सतह को लंबे समय तक ठंडा रखता है 🔥🔥🔥🔥🔥🔥🔥🔥🔥
Upar jab aur material fill karenge to ye pipe to block ho jaayegi completely.....kuch din baad to ek drop paani nai niklega isse😅😅😅😅😅
Nahhh bara baddha lagega aise bicch me rakhne se...isse accha hai slope bathroom hi bana lo..pani store nahi hoga aur wo dheere dheere se chala jayega
Sharafat ali
Sunken kya hota haai sir?
Old video chk kre
Dur boka kahi ka 🥲 kisa admi hai tum is se accha pvc panel lega le na uper se mouse ka khatra