0:56 mcm ada fosil sejarah tadi dipecahkan, patut masa kerja proses pengorekkan pastikan dulu klau terjumpa penemuan artifak, dan tapak sejarah war warkan dulu sbab ia milik hak negara malaysia. supaya ia terpelihara.. mesti mcm mcm jumpa bawah tanah tu.. semoga ianya dipermudahkan.
The two Chinese TBMs were used by the Chinese contractor from the Semantan portal to Pasa Seni, passing through Sentral station interchange section of the MRT. The two machines were assembled in the same factory that were used by Herrenkenct the German TBM manufacture that made TBMs for contracts in China. The KL MTR was driven through two differing strata's and so two different TBM designs were used. The Chinese contractor used an old Herrenkenct design bentonite slurry type for the Kenny Hill ground. While Gamuda used several mixed use Herrenkenct TBMs in the limestone voided grounds. I'm sorry but I can't remember the Chinese contractors name, but they performed very well and were a pleasure to work with for the entire tunneling process. Sadly, two of their employees perished in the MH370 tragedy. May they RIP.
Over a long distance with not much to measure against the accuracy of these machines and people is incredible.
power gile mesin ni . teringat dkt mesin basuh rumah aku
I really excited to wait for the MRT finish.
Finish
Tq najib
1:00 whoa, thats dangerous
0:56 mcm ada fosil sejarah tadi dipecahkan, patut masa kerja proses pengorekkan pastikan dulu klau terjumpa penemuan artifak, dan tapak sejarah war warkan dulu sbab ia milik hak negara malaysia. supaya ia terpelihara.. mesti mcm mcm jumpa bawah tanah tu.. semoga ianya dipermudahkan.
ni serius ke buat lawak?
What a perfect survey work.
reminds me the giant worm monster in men in black in the subway
abisla harta karun aku yg simpan kat bwh tanah tu
Arif Amin yg sabar y 😂😂
dorang rembat la
Aduhh kantoi lah nukclear aku ..nnti orng sebelah tau hbis lah kecoh dlm you tube..bajang betul lah
0:58 SPLASH!!!!
SPLAHH BOOM
You mean at 1:01?
@@nasirgoldbourne47 for begining. Avoiding misunderstanding
Wadaw
giler ah...
Masa najib pm..bnyk perubahan pada negara Dr segi nagatif dan positif nya...
What gonna do tunnel is crust
mrt depoh putrajaya
Yep
Underground
This tunnel is rocky see a red circle
Orang kata bn x buat kerja, x sumbang apa2 kepada rakyat.
None of the large-scale machines, gamuda, has any of these machines. Most of these machine technologies are China
Nope. The ones from Gamuda are from Germany and Switzerland. The Chinese ones not used here.
The two Chinese TBMs were used by the Chinese contractor from the Semantan portal to Pasa Seni, passing through Sentral station interchange section of the MRT. The two machines were assembled in the same factory that were used by Herrenkenct the German TBM manufacture that made TBMs for contracts in China. The KL MTR was driven through two differing strata's and so two different TBM designs were used.
The Chinese contractor used an old Herrenkenct design bentonite slurry type for the Kenny Hill ground. While Gamuda used several mixed use Herrenkenct TBMs in the limestone voided grounds.
I'm sorry but I can't remember the Chinese contractors name, but they performed very well and were a pleasure to work with for the entire tunneling process.
Sadly, two of their employees perished in the MH370 tragedy. May they RIP.
1:01 kan kan kan🤬😡💣💥💩