Operating a PistenBully at Jakobshorn

Поделиться
HTML-код
  • Опубликовано: 28 дек 2024

Комментарии • 15

  • @jaegersuisse
    @jaegersuisse 2 года назад +8

    Danke für den Post. Ist mir eine Ehre...

  • @Froot99
    @Froot99 2 года назад +7

    Seems like such a cool job! Only a shame I live so far away from the Alps

  • @endobutterz7000
    @endobutterz7000 2 года назад +4

    I'm is grateful that we only live 1 hour away from Davos.

  • @fishlouwie6944
    @fishlouwie6944 2 года назад +8

    Musik als wäre jemand gestorben warum?

  • @JTs3DPrints
    @JTs3DPrints Год назад +1

    What is purpose of rope connected at front when you are going uphill halfway through clip. Is that due to how steep hill is, or perhaps to help keep front end down on that part of the slope? Looks like very cool job, beautiful scenery every day! Building at top looks familiar from a Bond movie?

    • @theablanca17
      @theablanca17 Год назад

      Cable for winch. For steep slope as you guessed.

  • @piotrkramarczyk7390
    @piotrkramarczyk7390 Месяц назад

    Beautiful job. Please tell me how can I start becoming an operator of snow groomer.

  • @jamesbond-uj3qs
    @jamesbond-uj3qs 2 года назад +6

    Tolle Bilder, aber die Musik passt überhaupt nicht dazu.

  • @tomasales3877
    @tomasales3877 3 дня назад

    👍👍👍

  • @VercorsPassion
    @VercorsPassion 2 года назад +4

    🤩😍

  • @Noezen03
    @Noezen03 Год назад +1

    How fast are these machines can go anybody knows?

    • @ronharris91
      @ronharris91 Год назад +1

      Not very fast, maybe 15km/h or so, thwy arent meant to go fast. They are meant to have lots of torque to push and also run all the hydraulics, etc

    • @Instinktjagd
      @Instinktjagd 2 месяца назад

      fast one can go up to 40 km/h