Hello po Engineer sa Back Fill and Compaction mali po yung values na nalagay nyo. yung gravel bed po sa SOG is 10.4cu.m. But other than that po yung presentation is perfect! Thank you po.
No, I don't have company, We are currently working on our PCAB License, but right now we are accepting clients to build Residential houses while waiting foe our PCAB
@@badanabeaf.9907 3.875m please double yung plan. Please check kung saan nkatapat yung Grid line Grid line 1 sa gilid po ng column Grid line 2 sa center para makuha yung center to center disdtance kunin niyo yung half ng 250mm na sukat ng C1 ngayon ibawas niyo dun sa 3.875m para makuha niyo yung center to center distance 3.875- 0.125 = 3.75m
very nice po napaka laking tulong po ito napapa dali ang computation nito. God bless
Thanks po rito☺️
Thank you so much po! This is so helpful.
Hello po Engineer sa Back Fill and Compaction mali po yung values na nalagay nyo. yung gravel bed po sa SOG is 10.4cu.m. But other than that po yung presentation is perfect! Thank you po.
SIR SA EXCESS NA PART SA VOLUME OF GRAVEL BED (FOOTING) PANO NAKUHA ANG 3.47
FOR THE B.1 EXCAVATION HOW DID IT COME UP AS 26.680 FOR THE AREA IN SQ.M SINCE IT IS NOT STATED IN THE VIDEO ? PLEASE RESPONSE THANKS
The calculation is not shown in the video but please check excel file for the fomula.
drive.google.com/drive/folders/1u4SiCxsfibkBIkTgOR1g6YUqK4sT7Ubs
@@ARONJAMESGARCIA that requires access ,cant open your file
Sa footing tie beam po ba saan ang lagyan ng allowance sa excavation ? Sa side lang ba?
Thanks po!
I feel very interesting with your channel... do u have company for house or resident contractor
No, I don't have company, We are currently working on our PCAB License, but right now we are accepting clients to build Residential houses while waiting foe our PCAB
Hello po. Good Day. Ang kung may footing tie beam po ba ay isasali rin po ba yun sa earthworks?
How to download po yung file? Naka view only po kasi sya
Hi po sir pwedi maka hingi ng spreadsheet ng excavation thank you po
Pano po na solve yung slab on grade po pag nasa plan?
5:13pm 6/25/24
Pano po naging 3.75 yung distance sa center to center?
Diba sa plan po is 3.875 yung distance, pano po na calculate yung from center to center? I really don't get it.. hoping for your response sir😢
@@badanabeaf.9907 same di ko rin magets bakit 3.75. Or baka error lang? sana masagot ni Engr. Aaron
@@badanabeaf.9907
3.875m please double yung plan.
Please check kung saan nkatapat yung Grid line Grid line 1 sa gilid po ng column Grid line 2 sa center para makuha yung center to center disdtance kunin niyo yung half ng 250mm na sukat ng C1 ngayon ibawas niyo dun sa 3.875m para makuha niyo yung center to center distance
3.875- 0.125 = 3.75m
@@ARONJAMESGARCIA thank you po engr
Salamat po Engr. @@ARONJAMESGARCIA
SAN PO PWEDE MAG DOWNLOAD NG EXCEL MO PO?
@@anonymouss-x6p ruclips.net/video/3oI1BZ-XLig/видео.html&lc=UgzFfffKANrhmtDD4G14AaABAg.ADjeax7G0vPADkIqkQxqAE&si=TiBWkslsoieLylUq
sir good day meron po ba kau excel file? tnx
facebook.com/ajtgarcia18
Please check the link below to download the file
@@ARONJAMESGARCIAdeleted na po yung file?
Pano po madownload ang file?
Click niyo po yung link sa description ng video
Anyone na nakapag download ng excell ni sir? Pls pa share naman po. Thankyou
same hingi rin po sana ako
drive.google.com/drive/folders/1u4SiCxsfibkBIkTgOR1g6YUqK4sT7Ubs