Halliburton's New iCruise™ Intelligent Rotary Steerable System

Поделиться
HTML-код
  • Опубликовано: 27 ноя 2018
  • In this video, we get a hands-on review of Halliburton's New iCruise™ Intelligent Rotary Steerable System! You'll learn more about the basics of directional drilling, as well as what makes Halliburton's new directional BHA so exciting. This new tool is quite different than their previous directional tools, as well as their competitors. With incredible technological abilities and the reliability of push-the-bit directional drilling, this is a must see!
    If you'd like to learn more about the drilling process, directional steering, wellbore design, etc., then check out our online courses at www.OilfieldBasics.com/learn.

Комментарии • 77

  • @neilreid9005
    @neilreid9005 3 года назад +9

    Thank you! Finally an understandable and clear description of how to bend an oil string. Well done.

    • @hunterjameson6236
      @hunterjameson6236 2 года назад

      you probably dont care at all but does anyone know a method to get back into an instagram account??
      I was dumb forgot the account password. I appreciate any tips you can offer me!

    • @merrickchristian9392
      @merrickchristian9392 2 года назад

      @Hunter Jameson instablaster ;)

    • @hunterjameson6236
      @hunterjameson6236 2 года назад

      @Merrick Christian Thanks so much for your reply. I found the site through google and Im trying it out atm.
      I see it takes quite some time so I will get back to you later with my results.

    • @hunterjameson6236
      @hunterjameson6236 2 года назад

      @Merrick Christian it did the trick and I finally got access to my account again. I'm so happy:D
      Thank you so much, you really help me out :D

    • @merrickchristian9392
      @merrickchristian9392 2 года назад

      @Hunter Jameson Glad I could help :D

  • @paqanini
    @paqanini 11 месяцев назад

    very good explanation, thanks a lot, great job!

  • @hanihandoko7307
    @hanihandoko7307 2 года назад +1

    Saya teringat masa kecil saya, sewaktu tinggal diwilayah Merak - Banten ada perusahaan Santa Fe.

  • @ralph5450
    @ralph5450 3 года назад +1

    Can't wait till they have a DIY kit.

  • @francescobaruffi999
    @francescobaruffi999 2 года назад +3

    Does this fit on a Milwaukee drill?

  • @gislehildershavn399
    @gislehildershavn399 5 лет назад +3

    I like it! ;o)

  • @mb4lunch
    @mb4lunch 4 года назад +1

    Looooongah Haaardaaah and quickaaaah! Drill it baby!

    • @OilfieldBasics
      @OilfieldBasics  4 года назад +2

      Someone's had a little too much caffeine. :P

  • @mingfeng6104
    @mingfeng6104 2 года назад +1

    Some one said it worked with slower ROP compared with SLB PD Archer or orbit. Is that true?

    • @notyourbusiness8550
      @notyourbusiness8550 Год назад +1

      I worked in Halliburton and Schlumberger and I can say that slb equipment is the best.

  • @251Trioxin
    @251Trioxin 4 года назад +1

    Let’s go Halliburton!!!

  • @ppalten61
    @ppalten61 5 лет назад +1

    What sizes are available? 4 3/4'' with 5 7/8'' to 7'' bit size 6 3/4'' with 8'' to 11 5/8'' bit size, 8'' with 12'' to 14'' bit size and 9 1/2'' body with 14'' - 17 1/2'' bit size. What pad sizeas are available? Stabilizer above is always 1/8'' undergauged?
    How to measure ROP - is depth downlinked from surface? Does the tool need specific differential pressure from bit to have enough power for the pads? Means in case losses occur and planned flowrate has to be reduced, POOH and change configuration. Can this be done by changing an internal ring on the rigsite or only in the workshop? What happens in case a nozzle is plugged and pressure drop below iCruise increases above planned range - will that damage the internal parts of the iCruise and toll has to be POOH?
    With that Superflex what is the maximum DLS to be drilled with 4 3/4'' and 6 3/4'' tool? This Superflex can cause vibrations, so in case planned DLS is moderate, is there different flex designs available?

    • @OilfieldBasics
      @OilfieldBasics  5 лет назад

      Hey Peter! I wish I could answer your questions man, but I would just suggest reaching out to someone at Halliburton. They could answer your questions better.

  • @kelleyroberts6017
    @kelleyroberts6017 7 месяцев назад +1

    Sounds similar to The Improved TunnelVision Mole.

  • @mynameisnotshane6501
    @mynameisnotshane6501 2 года назад

    how long can that bit work before it need to be replaced

    • @user-pb4qh5xp6c
      @user-pb4qh5xp6c 5 месяцев назад

      It depends on the formation. We drilled over 15,000 feet in a single run in the Eagle Ford shale in 2014. I'm sure there's been longer runs. On a six well drilling pad, we drilled all six surface hole sections with one BHA and bit, for nearly 24,000 feet. The bit looked new except for the worn paint. The surface hole section in south Texas is like drilling through a snow bank.

  • @mohamedalishafiqueahmed9496
    @mohamedalishafiqueahmed9496 2 года назад

    i need to make drill to make a duct to more electric cabel duct

  • @freebird7284
    @freebird7284 3 года назад +5

    now make a cutaway display model to show exactly what's going on inside

  • @IrshadAhmad-mh1kg
    @IrshadAhmad-mh1kg 5 лет назад +1

    Hope the new addition of RSS will improve Halliburton performance in GeoMarket for search of HC

  • @jasonreyes6830
    @jasonreyes6830 4 года назад +2

    Do y’all know where I could get a job in pipeline HDD I know how to calculations and I am a fast learner

    • @OilfieldBasics
      @OilfieldBasics  4 года назад

      Thanks for the question, but unfortunately we don't work with any staffing agencies or job boards at the moment.

    • @jasonreyes6830
      @jasonreyes6830 4 года назад

      Oilfield Basics okay well if anyone ask I’m willing to relocate, my number is 281.759.0921

  • @jeremybrooks335
    @jeremybrooks335 5 лет назад +2

    It would rock better with a Ulterra Bit 🤷🏾‍♂️

  • @mohamedalishafiqueahmed9496
    @mohamedalishafiqueahmed9496 2 года назад

    i also looking a project 500 km area its need 100 nos ro water source may be help me on thath project well driling at at least 100 stn.well water to the Land craft logestic project

  • @omaral-subhi8514
    @omaral-subhi8514 5 лет назад +12

    A copy of Schlumberger power drive push the bit system

  • @vahidhemati6626
    @vahidhemati6626 2 года назад

    Anyone knows the how much is it?

  • @Evicted170
    @Evicted170 2 года назад

    The bit should steer. No, or minimal, Bit to Sensor= zoro projection ahead.

  • @3rdGenRX7TT
    @3rdGenRX7TT 3 года назад +1

    Did he say "doddgy software" ?? 😁

  • @3rdGenRX7TT
    @3rdGenRX7TT 3 года назад +1

    They should call it i-Copy.. right at 4:49 he almost said AutoTrak 🤣😂🤣😂

    • @affliction337
      @affliction337 3 года назад +1

      “No one will notice that we copied it if we paint it red and change the name.” Lol

    • @3rdGenRX7TT
      @3rdGenRX7TT 3 года назад

      @@affliction337 🤣🤣😂😂🤣🤣😂🤣😂 Xeroxburton .. @ 1:00 Superflex...OMG... Looks exactly like the Baker AutoTrak Flex Sub

  • @arlieferguson3990
    @arlieferguson3990 3 года назад

    Fully Automated drilling

  • @yuyangli5281
    @yuyangli5281 5 лет назад +2

    similar as atk

  • @carlitoab
    @carlitoab 3 года назад +3

    Fascinating! Renewables is such a bland industry in comparison.

    • @OilfieldBasics
      @OilfieldBasics  3 года назад

      Haha! Well said.

    • @tongpoo8985
      @tongpoo8985 3 года назад +1

      It really is. It's a scam tbh. Nuclear is the only viable replacement for fossil fuels. Solar and wind are about 30 years too young.

    • @Jennaehill
      @Jennaehill 2 года назад

      FYI this kind of drilling is used for renewables too (deep geothermal)

    • @carlitoab
      @carlitoab 2 года назад

      @@Jennaehill true. Geothermal is very interesting. About the only form of renewable energy that we may rely on.

  • @darrellkavanagh7373
    @darrellkavanagh7373 3 месяца назад

    Hmmmmm...is that Hal or just SLB PD knockoff ?

  • @jrpena7857
    @jrpena7857 Год назад

    Looks like a fish waiting to happen

  • @tre6323
    @tre6323 4 года назад

    Junk compared to what Baker Hughes Inteq has

  • @warningsigns4526
    @warningsigns4526 4 года назад

    800 people lose job at Reno Halliburton - thedailyjobcuts.com - good riddance