No doubling between Rane bennur to hubli, work happening symbolically, our MPs ministers are useless, by 2020 this line from blr to hubli should have been doubled and electrified, with speed of 130kms+, but it seems it is distant dream. None of the tracks inside karnataka have 130+km speed capacity. Shame on all those irresponsible people.
Very good coverage Thanks
🙏
Make video on bansandra to nittur doubling
Here it is ruclips.net/video/_SmJfC0erQA/видео.html
No doubling between Rane bennur to hubli, work happening symbolically, our MPs ministers are useless, by 2020 this line from blr to hubli should have been doubled and electrified, with speed of 130kms+, but it seems it is distant dream. None of the tracks inside karnataka have 130+km speed capacity.
Shame on all those irresponsible people.
This section may take time as progress is pretty slow