Fantastic run around your layout on the cam truck. Your modelling is quite outstanding and when mixed with a highly entertaining video is a pleasure to watch. Thanks and have good Christmas and prosperous New Year. Euan
Under signalling regulations on what was BR,at no time do you ever have two trains in one section, but then you get the list of exceptions to the rules, mostly for permissive working, where another unit either goes into an occupied section to assist a broken down train, or to couple up or un-couple to/from another unit. Nice touch having the bell for green signals, bet you don't have the spinning sunflower as well. But to be technical, every single set of points, cross overs etc. are protected by signals and you only go past any signals at danger, with the signalmans permission.
Again, just outstanding, the quality and detail of your modelling is like nothing I've seen before.
Very interesting story Patrick and a great trip down memory lane................Cheers Kev
Most enjoyable story and what a fantastic layout you have. Running full lenth trains on a large layout was my key requirement. All the best
That was very nice. You reminded me of my dad who used whatever he could get his hands on to automate his layout back in the 60s and 70s
Fantastic run around your layout on the cam truck. Your modelling is quite outstanding and when mixed with a highly entertaining video is a pleasure to watch. Thanks and have good Christmas and prosperous New Year. Euan
That turntable section at the end looks awesome. Yeah, takes me back for sure.
Luverly backstory, those rotary selectors are a blast from the past! Great bit of editing too. Keep 'em coming mate, very enjoyable!
Thanks
You set the bar high for the rest of us mere mortals. once again well made stream. if Sue & I get 25% of your standard we would be happy. Stay safe
Love it! More, please, more!
Under signalling regulations on what was BR,at no time do you ever have two trains in one section, but then you get the list of exceptions to the rules, mostly for permissive working, where another unit either goes into an occupied section to assist a broken down train, or to couple up or un-couple to/from another unit. Nice touch having the bell for green signals, bet you don't have the spinning sunflower as well. But to be technical, every single set of points, cross overs etc. are protected by signals and you only go past any signals at danger, with the signalmans permission.
What is that cam truck? I’ve been looking for something like this for years but not found something small enough, yet.