DOKA - Self Climbing Working Platform on High Rise Buildings | Detailed Inspection | Parts, Assembly

Поделиться
HTML-код
  • Опубликовано: 19 окт 2024

Комментарии • 36

  • @rockwithsable
    @rockwithsable 3 года назад +1

    Doka Material is best with unique solution and safety point of view.

  • @modassariqbal306
    @modassariqbal306 4 года назад

    ...apka video bahut important hota hai hum users k liye sir...we all r always waiting 4 ur upcoming videos........
    Please 1 videos banaya column k starter p sir k column to column distance kaise nikal te hai centre line drawing s jab column k size upar jane k bhad reduce ho jate hai tb centre line drawing s kaise dikh kr nikalte hai reduce column k distance for column starter ko site p check kr n k liye sir

    • @EverythingCivil
      @EverythingCivil  4 года назад +1

      Okay will try this. Thanks for watching.

    • @muzammilmarediya
      @muzammilmarediya 4 года назад +1

      Bhai jab column reduce hota he to centerline wahi hota he bas size small ho jati he koi bhi side se

  • @kuchbhiunboxing2431
    @kuchbhiunboxing2431 2 года назад

    bhai yeh MIVAN flats me interior karane me issues nhi hota hai kya, agar baad me electrical points change karana ho to, woh kaise lagega, ya flat ke entry door pe Security Grill laga sakte he kya

  • @jyotijain3449
    @jyotijain3449 4 года назад +1

    Hi There,
    It is a very good video. Thanks for putting it up.
    I have several questions on this system -
    1. Can this platform be used as material hoist? If yes, how much load of rubble can it take per m2? ( the platform that is used in the video)
    2. What is the net weight per bay of the working platform?
    3. How many people can work from that platform per bay?

    • @EverythingCivil
      @EverythingCivil  4 года назад +1

      Hello,
      1. No this platform is not suitable to work as a material hoist. It can take approximately 200kg per unit area.
      2. If you ask the self weight of the platform I don't have the exact figure will have to ask the OEM but must be close to 1MT.
      3. 10 people can work on each platform per level safely.

  • @sudhakarbandagale4917
    @sudhakarbandagale4917 Год назад

    Doka material suppyer kaha pe hai sir? Mumbai me kaha milega? Eski cost per set Kitna hoga approx minimum/ maximum?

  • @vijaychaudhary1224
    @vijaychaudhary1224 Месяц назад

    Sir, what is cost for doka

  • @vijaynangarepatil8638
    @vijaynangarepatil8638 6 месяцев назад

    Informative

  • @mohammadkhorshedalam133
    @mohammadkhorshedalam133 4 года назад

    very useful video

  • @muzammilmarediya
    @muzammilmarediya 4 года назад

    Always waiting 4 ur videos
    True knowledgable
    Sir job vacancy ho to batana western Mumbai

  • @mhusainkhan9977
    @mhusainkhan9977 2 года назад

    After handing over completed R.c.c floor to other agencies, how do we do external plaster & painting?

  • @sopannikam9043
    @sopannikam9043 2 года назад

    What is the rate & methodology for dismantling same platform. Thanks

    • @EverythingCivil
      @EverythingCivil  2 года назад

      We did on lumpsum for total removal 2.5lacs with own tower crane

  • @mohammadkhorshedalam133
    @mohammadkhorshedalam133 4 года назад

    After which height this nets re used i means the lowest height?

    • @EverythingCivil
      @EverythingCivil  4 года назад

      Hello,
      As it was mentioned in the video usually we start using it from the typical floors and these floors generally start at 30m from ground for high rises.
      But if you ask the minimum height you can fix this I would say you need minimum 5 floors to be constructed 3 for the bracket fixing and the net and the bottom two for access and egress.
      Considering floor height to be 3m each.

    • @mohammadkhorshedalam133
      @mohammadkhorshedalam133 4 года назад

      @@EverythingCivil Thanks.

  • @facttechmarathi3034
    @facttechmarathi3034 3 года назад

    How does it dismantle in last ?

  • @shubhamsalunkhe9394
    @shubhamsalunkhe9394 6 месяцев назад

    BCS balcony cage system

  • @badalgallery
    @badalgallery 4 года назад +1

    First time i see this system

    • @EverythingCivil
      @EverythingCivil  4 года назад +1

      Great. I hope it helped increase your knowledge about same. Thanks for watching.

    • @badalgallery
      @badalgallery 4 года назад

      I am surprised when you u told we are casting each floor in 7 days.
      How it's possible ,what about curing and cement setting.in our area {bihar} every one say u can't cast another floor before setting of cement.
      I hope one day u make a video on this.

    • @EverythingCivil
      @EverythingCivil  4 года назад +1

      This is trend nowadays due to introduction of aluminium shuttering wherein slab and column is casted at one go also proper coordination between teams is important. We have achieved minimum slab cycle of 3days on a slab area of 3500sqft on another project.

    • @badalgallery
      @badalgallery 4 года назад

      Thanku for your reply....With best wishesh.

  • @coffeelovers1711
    @coffeelovers1711 4 года назад

    Bhai plss video on how to study andbget good marks pls apki story sir pls

  • @yasirzhari2523
    @yasirzhari2523 4 года назад

    Nice content keep it up

  • @ankitgajbhiye1606
    @ankitgajbhiye1606 2 года назад

    Sir if any vacancy in your company for civil engineer please let me know. I want to gain high rise building projects experience. I have 1y 6mo exp in industrial and building projects. Please help me

  • @mohammedsazzat3955
    @mohammedsazzat3955 Год назад

    Jaking system dekna sahiye

  • @Priyangshu139
    @Priyangshu139 2 года назад +1

    Mujhe uchai se darr lag raha hai