Complete tutorial What is resource loading and how to calculate resource loading projects

Поделиться
HTML-код
  • Опубликовано: 28 сен 2024
  • Resource loading in construction is a technique that loading schedules with activities, needed resources, and task durations. One of the significant benefits of resource loading in construction is that it increases the chance of project success.
    From the start, project managers and stakeholders can determine how many resources are needed for the project and the best way to allocate work. You can assign tasks based on your team's capacity, reducing overallocation and conflicts with contractors. For instance, you can estimate how long the masons will need to install drywall throughout the condo complex and avoid unrealistic deadlines that can derail the project.
    Determining costs is also easier as managers can see all the time estimated for each task in resource-loaded schedules.
    That's not to say that resource loading in construction is always easy. It's difficult to get estimates without data, so if you don't know how long it takes to lay the foundation of an apartment block, it might be hard to do any resource loading. Also, contractors estimate durations in days and months and hardly ever in fractions of time like hours. So, you might find it hard to round up hours into standard units of measurement.
    Resource loading is your total assigned hours of work divided by the number of hours you have to do the work. Resource loading is looked at on a per day, per week, per month, or per the duration of the project basis.
    Resource loading = hours of work per time period / hours of capacity per time period
    Planning - P6 Links:
    / planningp6
    / planningp6
    / planning-p6-4ba25619a
    110- Primavera P6 Tricks By Using Schedule Analyzer | convert Xer p6 schedule to excel by analyzer | p6
    • Video
    111- Primavera P6 Resource Curves feature | How to Generate Different Types of Resource Curves Primavera
    • Primavera P6 Resource ...
    112- How To Change Customize the Values and Setting Activity Usage Profile in Primavera P6 | Planning P6
    • How To Change Customiz...
    113- How to Apply Actual in Primavera P6 | Quick way to update the schedule as planned in primavera p6 |
    • How to Apply Actual in...
    114- How to prepare recovery Schedule in Primavera P6 | Recovery Schedule in p6 | Planning-P6 | Primavera
    • How to prepare recover...
    115- How to update progress feature works in primavera p6 | how to update progress as planned quickly p6
    • How to update progress...
    116- How to do Recalculate Assignment Cost in Primavera P6 For Resources | how to recalculate cost in p6
    • How to do Recalculate ...
    117- How to do Summarizing Projects in Primavera P6 | How does P6 summarize data in the Summary/Grouping
    • How to do Summarizing ...
    118- How to prepare revised schedule in p6 | Make revised schedule for any changes in p6 | Primavera p6 |
    • How to prepare revised...
    119- Financial Periods and Using Stored Period Performance in Primavera P6 | primavera p6 | Planning P6 |
    • Financial Periods and ...
    120- How to use Primavera P6 Global Change Tool and feature |Global Change option in p6|Tips, Tricks P6|
    • How to use Primavera P...
    121- How to Enable and Disable Auto-Reorganization in Primavera P6 | What is Auto-Auto-Reorganization P6
    • How to Enable and Disa...
    122- How to use Monitor Thresholds feature in primavera P6 | How to monitor and add thresholds in p6 |
    • How to use Monitor Thr...
    123- How to download and install primavera p6 version 22.12 | What new in p6 22.12 complete information |
    • How to download and in...
    124- Complete tutorial What is resource loading and how to calculate resource loading projects #primavera
    • Complete tutorial What...
    #resourcecalculation, #resourseloading, #planningp6

Комментарии • 77

  • @PLANNINGP6
    @PLANNINGP6  Год назад +5

    drive.google.com/file/d/1df3XNxKQw-dbHA24gPDHAO21OWkxQeX2/view?usp=share_link
    docs.google.com/spreadsheets/d/12R8c0tS8dtu3oTpgalM86ojV_p3BqQBZ/edit?usp=share_link&ouid=108898335912859567189&rtpof=true&sd=true

    • @smeekteek
      @smeekteek Год назад

      Would it be possible for you to upload a few different Releases of this XER for user like myself that are using different Releases of P6 Professional? For example, i am using P6 Professional, Release 17.7.

    • @sharathalex7288
      @sharathalex7288 Месяц назад

      6:36 min you are using one XER file upload to Excel tool .
      Could you please give that

    • @PLANNINGP6
      @PLANNINGP6  Месяц назад

      @@sharathalex7288 The Tool is called #primaverap6 Schedule Analyzer 2024 version by Planning-P6: ruclips.net/video/E-e3jWEg7QQ/видео.html
      To purchase the tool please contact us: wa.me/923088663797?text=Hello%2C%0A%0AWelcome%20to%20PlanningP6

  • @Rameshkumar4567
    @Rameshkumar4567 Год назад

    Really i enjoyed your course and easyway of understanding. Great to have it brother

  • @scottsimmons6958
    @scottsimmons6958 Год назад +1

    I'm mostly self-taught with P6. I'm building a 4 Lane Highway and Bridge. I've used a very similar resource loading dictionary. I have labor, equipment, and materials built in my resource library, but I struggle with the Duration Type. Any recommendations would be appreciated as i want to use them as I'm capturing actuals and measure performance. The cost management components of P6 is amazing for project controls side of the equation. Great video and the best I've seen so far.

    • @PLANNINGP6
      @PLANNINGP6  Год назад

      Thanks for comment,
      You can measure your project progress by physical progress updates.
      or please extract the spread sheet of manhours and prepare EVM sheet with the help of extracted manhours from #primaverap6.

  • @cristianoronaldo...0794
    @cristianoronaldo...0794 Год назад +1

    Sir i watch your every vedeo i am a fresh civil engineer but i know the all basic of planning so please make small building or related to civil project complete schedule with resource loading. Sir please

    • @PLANNINGP6
      @PLANNINGP6  Год назад

      Welcome dear, complete projects are already there search in our channel complete projects and watch that Playlist.

  • @aniruddharoy4999
    @aniruddharoy4999 10 месяцев назад +1

    HI , it is really good stuff video and kindly share the productivity norms chart which you have shown in this video. that would be great help

    • @PLANNINGP6
      @PLANNINGP6  10 месяцев назад

      Thanks for the complement, the Productivity Norms are paid.
      To purchase please contact us through WhatsApp

  • @rajasekarr4516
    @rajasekarr4516 Год назад +1

    Thanks for you useful lecture.

  • @HaiderAli-tj4jd
    @HaiderAli-tj4jd Год назад +1

    Also Can you Give Some Lectures on Creating Progress Measurement System (PMS) for EPC Project in Excel

    • @PLANNINGP6
      @PLANNINGP6  Год назад

      We are working on the complete tutorials and hopefully our You Tube family will find each and everything here.

  • @jaggu221
    @jaggu221 Год назад +1

    Can you please share the productivity rates of oil and gas projects

    • @PLANNINGP6
      @PLANNINGP6  Год назад

      Dear,
      The norms file has a small cost, Please use WhatsApp to get in touch with us if you wish to purchase.

    • @DilipKumar-wu5ez
      @DilipKumar-wu5ez Год назад

      ​@@PLANNINGP6please share the pdf productivity

  • @sharathalex7288
    @sharathalex7288 Месяц назад

    Load XER Set up you used for loading XER file . can I get that

    • @PLANNINGP6
      @PLANNINGP6  Месяц назад

      The Tool is called, Schedule Analyzer 2024 version by Planning-P6: ruclips.net/video/E-e3jWEg7QQ/видео.html
      To purchase the tool please contact us: wa.me/923088663797?text=Hello%2C%0A%0AWelcome%20to%20PlanningP6

  • @reginaldibenne6875
    @reginaldibenne6875 Месяц назад

    Great video

    • @PLANNINGP6
      @PLANNINGP6  Месяц назад

      Thanks for the feedback and Compliment.
      We are glad to hear that our content has been helpful to our friends and viewers. We appreciate the feedback, please share our content on LinkedIn and other social media platforms with others.
      Remember to mention @planningp6 and #planningp6 and planningp6.com

  • @reginaldibenne6875
    @reginaldibenne6875 Месяц назад +1

    I have a question.
    Q. Must we add the Labour, Non Labour and Material resource during Resource-loading in P6? for example, In Excavation Activity, do we need to assign Excavator, Foreman, Helper and Operator? if yes, does it mean that the Total BUDGETED UNIT would be added up in P6. Let's say each has 16, then in total will be 64.

    • @PLANNINGP6
      @PLANNINGP6  Месяц назад

      Yes, you generally need to add both Labor and Non-Labor resources to activities in Primavera P6. This includes assigning specific resources like Excavator, Foreman, Helper, and Operator to the Excavation activity.
      However, Material resources are typically handled differently. While materials are essential for projects, they are often represented as costs associated with activities rather than being directly assigned as resources. This is because materials are consumed as the project progresses, and their quantities can vary.
      Understanding Budgeted Units:
      • Budgeted Unit: This represents the total quantity of work expected to be completed for a specific activity.
      • Labor Resources: The Budgeted Unit for labor resources is often measured in hours or days.
      • Non-Labor Resources: The Budgeted Unit for non-labor resources (like equipment) can be measured in units (e.g., hours of machine use) or quantities (e.g., number of units).
      In your example:
      • If you assign Excavator, Foreman, Helper, and Operator to the Excavation activity, and each has a Budgeted Unit of 16 hours, the total Budgeted Unit for the activity would indeed be 64 hours.

  • @yunaabro
    @yunaabro Год назад +1

    Good work 👏
    Can share the productivity rate pdf?

  • @stephb186
    @stephb186 Год назад +1

    Hoping someone sees this and knows the answer. I added resource to a task that ends on last day of March but in resource assignments view it shows a small portion of that cost in April. Anyone know why this might be? Calendar issue? It's happened over several tasks and I can't see any reason for it, it's driving me mad! Thanks 😊

    • @PLANNINGP6
      @PLANNINGP6  Год назад

      Check if the activity type is level of effort, then change it to task-dependent.
      What is the latest finish date of the task?
      Are the baseline finish and actual finish dates same?
      However, if the problem persists, kindly share the XER file with us. #planning_p6

    • @stephb186
      @stephb186 Год назад +1

      @@PLANNINGP6 Task type is dependent, late finish same as finish and same as BL (task complete). I can't share the XER due to nature of my job. Really struggling to work out why this keeps happening. Could it be a calendar misalignment? Or an EVM setting?

    • @stephb186
      @stephb186 Год назад +1

      @@PLANNINGP6 it's only £30 or thereabouts so not significant but I want to understand what's going on. Any help appreciated :)

    • @PLANNINGP6
      @PLANNINGP6  Год назад

      @@stephb186 To discuss it, get in contact with us on WhatsApp. If solving the problem is something you truly want.
      In order to discover the issue, how can we do so without analyzing the schedule?
      After a conversation over WhatsApp, we can do it through team viewer.

    • @tarysen3113
      @tarysen3113 Год назад

      @@stephb186 @Check the finish date of cost assigned at resource tab. may be Cost assigned finish date wrongly entered till april.

  • @manojbist270
    @manojbist270 Год назад +1

    Can you send me an Excel copy of productivity and resources sheet

    • @PLANNINGP6
      @PLANNINGP6  Год назад

      In the tutorial's comments (Comment from #planningp6), there are some (drive) links for free stuff (Excel sheets), and if you'd like the productivity norms file, you can purchase it. (For purchasing contact us through WhatsApp)

  • @Ahmedsuroor
    @Ahmedsuroor 3 месяца назад

    The Excel file you have attached is totally different from this please update

    • @PLANNINGP6
      @PLANNINGP6  3 месяца назад

      These are practice files.
      Productivity Norms file is paid.

  • @amalthomas5850
    @amalthomas5850 11 месяцев назад

    How to create a schedule analyzer in xl sir

    • @PLANNINGP6
      @PLANNINGP6  11 месяцев назад

      Applying micros and formulas.

    • @amalthomas5850
      @amalthomas5850 11 месяцев назад

      PLZZ provide the sample report link sir

    • @PLANNINGP6
      @PLANNINGP6  11 месяцев назад

      @@amalthomas5850 contact us via WhatsApp and buy the tool schedule analyzer.

  • @rashidminhas9957
    @rashidminhas9957 Год назад +1

    Can you please share the noms file

    • @PLANNINGP6
      @PLANNINGP6  Год назад

      Yes, we can but the norms file is paid.
      Contact us on WhatsApp for further Quarry...

  • @sameramer6829
    @sameramer6829 Год назад +1

    Sir, Kindly Share your productivity rate file.

    • @PLANNINGP6
      @PLANNINGP6  Год назад

      Welcome dear, the productivity file has cost. If you want to purchase contact us on WhatsApp.

  • @ershahimrain1289
    @ershahimrain1289 Год назад +1

    Sir please share excel file. It's very helpful.

    • @PLANNINGP6
      @PLANNINGP6  Год назад +1

      ok please find blow link:
      drive.google.com/file/d/1df3XNxKQw-dbHA24gPDHAO21OWkxQeX2/view?usp=share_link
      docs.google.com/spreadsheets/d/12R8c0tS8dtu3oTpgalM86ojV_p3BqQBZ/edit?usp=share_link&ouid=108898335912859567189&rtpof=true&sd=true
      Above files are just sample, you have to create files as per your project requirement....

  • @MuazzamAli-uc9ov
    @MuazzamAli-uc9ov Год назад

    Hi, I Contacted you on Whatsapp & By Email i need this file to purchase

  • @jodysetiawan3790
    @jodysetiawan3790 Год назад +1

    HELLO friend, do you have linked account

    • @PLANNINGP6
      @PLANNINGP6  Год назад

      Thank you,
      What you want us to ask, we can't understand. Please write in detail..

  • @anilachintabathina2245
    @anilachintabathina2245 Месяц назад +1

    Sir please send Excel sheets which will be as Templates

    • @PLANNINGP6
      @PLANNINGP6  22 дня назад

      Sure, contact via WhatsApp: wa.me/923088663797?text=Hello%2C%0A%0AWelcome%20to%20PlanningP6.

  • @HaiderAli-tj4jd
    @HaiderAli-tj4jd Год назад +3

    I am really amzed by your tutorials. Keep up the good work. Learnt a lot from you.

  • @abdulrauf8413
    @abdulrauf8413 10 месяцев назад +1

    Q1: How to round off Labor Units and Durations while uploading in Primavera or we have to upload with decimals ?
    Q2: You added cost as resource, when we assign this resource to an activity and allocate cost of the activity, will this cost be shown in budgeted cost ?

    • @PLANNINGP6
      @PLANNINGP6  9 месяцев назад

      Planning-P6 Reply to Q1: It is contingent upon the duration of the project and the decisions taken by the client or consultant.
      Nonetheless, based on our experience, if your project is equal to or less than a year, round up to 10% with the prior numbers, and if it is more than a year, round up using the subsequent value.
      Planning-P6 Reply to Q2: Indeed, it will be shown in the appropriate column.

  • @abrarhaware3007
    @abrarhaware3007 Месяц назад +1

    Very Informative video thank you. Don't put music behind its annoying

    • @PLANNINGP6
      @PLANNINGP6  Месяц назад

      Thanks for the feedback and Compliment.
      Right now, we're not using background music.
      We are glad to hear that our content has been helpful to our friends and viewers. We appreciate the feedback, please share our content on LinkedIn and other social media platforms with others.
      Remember to mention @planningp6 and #planningp6 and planningp6.com

  • @faisalgulzar4538
    @faisalgulzar4538 9 месяцев назад +1

    AA sir, You did not added cost for any labor resource. Is it ok? Can we consider completed?

    • @PLANNINGP6
      @PLANNINGP6  8 месяцев назад

      WS Dear,
      We think we have included a distinct cost resource in the tutorial and have provided an explanation for this.
      Thanks
      #planningp6

  • @muhammadalikhan4011
    @muhammadalikhan4011 4 месяца назад

    sir kindly guide me aboute piling if we have 800mm thick diameter Pile (Lenght = 14 m) 4 No

    800mm thick diameter Pile (Lenght = 26 m) 5 No

    800mm thick diameter Pile (Lenght = 21 m) 180 No
    then how we can file productivity and resources.

  • @faisalgulzar4538
    @faisalgulzar4538 11 месяцев назад +1

    AA sir
    Productivity rate file please.

    • @PLANNINGP6
      @PLANNINGP6  11 месяцев назад

      Walaikum Assalam.
      The file is paid, contact us through WhatsApp to purchase.

  • @amalthomas5850
    @amalthomas5850 11 месяцев назад +1

    Sir create a above mentioned work platform in xl

    • @PLANNINGP6
      @PLANNINGP6  11 месяцев назад

      We didn't understand your question, therefore please clarify and be detailed.

  • @engrishfaqahmed7766
    @engrishfaqahmed7766 10 месяцев назад +1

    Please share P6 tools and Excel sheet

    • @PLANNINGP6
      @PLANNINGP6  10 месяцев назад

      Contact us through WhatsApp, will share if it is not paid (Tools are Paid)

  • @SaifUllah-ts7wf
    @SaifUllah-ts7wf 8 месяцев назад +1

    This course is very easy and important for everyone

    • @PLANNINGP6
      @PLANNINGP6  8 месяцев назад

      We are glad to hear that our content has been helpful to our friends and viewers.
      We appreciate the feedback, please share our content on LinkedIn and other social media platforms with others.
      Remember to mention @planningp6 and #planningp6

  • @SKOrbit
    @SKOrbit Год назад

    From where can I get this for for P6

  • @kabilansubramaniyan6978
    @kabilansubramaniyan6978 Год назад +1

    Nice video.still iam not complete full video.but still video is very nice

    • @PLANNINGP6
      @PLANNINGP6  Год назад

      Thanks, why you are saying that this is not a complete tutorial?

    • @kabilansubramaniyan6978
      @kabilansubramaniyan6978 Год назад +1

      @@PLANNINGP6 not liked that .i was just seen 10minutes video .in that i was feel to share my thanks to you.that why i was texted here.now iam watching your video only .end of the video I will share my full experience in this forum

    • @PLANNINGP6
      @PLANNINGP6  Год назад

      @@kabilansubramaniyan6978 Ok right. You must have to provide your detailed feedback on it.🙂

  • @mohamednoohimran4382
    @mohamednoohimran4382 Год назад

    Bro I need Productivity Rate Pdf could you share me ?

  • @Life_Vision
    @Life_Vision Год назад +1

    thank you

  • @Rameshkumar4567
    @Rameshkumar4567 Год назад

    Nice lecture. Good work brother