ASSE Test procedure for 1015 5 valve

Поделиться
HTML-код
  • Опубликовано: 12 дек 2024

Комментарии • 9

  • @krisrich3716
    @krisrich3716 4 месяца назад +1

    Excellent demonstration 👏

  • @rajayounis699
    @rajayounis699 3 года назад +2

    Very helpful to learn

  • @גילההנדימןשלך
    @גילההנדימןשלך 10 дней назад

    what is the Difference between test number 1 and number 3 ?

  • @NeptuneBackflow44
    @NeptuneBackflow44 7 месяцев назад

    do you close all all 5 valves on the gauge before starting Test #3?

  • @treeevordubz1567
    @treeevordubz1567 11 месяцев назад +1

    Was this the actual test exam in Michigan?

  • @handyman9366
    @handyman9366 Год назад

    Hello, what if the checks appear to hold >1PSI, but slowly, over say 10 hours, bleed below 1 PSI? In other words, how long do the checks need to hold >1PSI to pass? Thank you!

    • @michiganbackflowinstitute
      @michiganbackflowinstitute  2 месяца назад

      Thanks for the question. If a check is not holding, then that is considered a fail. There is no documented time limitations. A leak is a leak, be it 5 minutes, or 10 hours.