  • @vinaykhyalia2102
    @vinaykhyalia2102 Год назад +4

    Sir aap jiss tarike se padhate ho waisa mne khi nhi padha.... really thanks....ab aise adat ho gaiye h ki jo topic samjh nhi ata bss dil krta hai apse hi padhe...
    Please make video on Electrodynamo type wattmeter. If you have time.

  • @kamaleshkumarbind5442
    @kamaleshkumarbind5442 Год назад +2

    Thanks sir

  • @ravi___4820
    @ravi___4820 Год назад +2

    Sir please requested do videos on power plant engineering subject.

  • @ankitgupta-sh5yy
    @ankitgupta-sh5yy 8 месяцев назад

    best lecture sir

  • @zezo2895
    @zezo2895 2 месяца назад

    Thank you sir❤

  • @prabhatpathak6326
    @prabhatpathak6326 Год назад +1

    Sir Firm power,cold reserve,hot reserve spinning reserve पर भी वीडियो बना दीजिए.thanks .

  • @udaynath8492
    @udaynath8492 Год назад +3

    Sir 3 phase induction motor bhi padhaya h kya aap ne?

  • @tasleemhussain9549
    @tasleemhussain9549 3 месяца назад

    Sir plant use factor n plant utilisation factor are same????

  • @amirrahman9837
    @amirrahman9837 2 месяца назад

    Reserve capicity should not be called as waste of money as in case of increase in load the plant will collapse it will be a loss in the shape of energy not delivered, however it should be limited.

  • @hussammajeed3892
    @hussammajeed3892 3 месяца назад

    ❤❤❤❤❤❤❤

  • @upasnakapariya7589
    @upasnakapariya7589 6 месяцев назад

    Sir aapne bataya tha ki electricity ko store karke nahi rakh sakte h jitna generation hota sab use karte hain aisa design kiya jata h plant ko fir aap kahe rahe h ki reserve karke bhi rakhna hai samajh nahi aaya ye

    • @techinsight1418
      @techinsight1418  6 месяцев назад

      Reserve means.....ki hum apne generator ko 100% par n chalaye......80 par chalaye or 20 ko reserve rakhe.....jarorat aane par 100 kare....