- Видео 20
- Просмотров 2 552 272
Piling Contractors
Добавлен 20 фев 2014
Showing the work of Piling Contractors Pty Ltd, one of the largest foundation engineering specialists in Australia with a reputation for quality delivery on infrastructure, resources and other construction projects.
Diaphragm Wall - Perth (long version)
Installation of diaphragm wall, 55 panels between 15m and 20m deep x 600mm wall thickness. Installation of anchors for approximately 60 lin. m of wall.
Просмотров: 423 145
Видео
Diaphragm Wall - Perth
Просмотров 10 тыс.9 лет назад
Installation of diaphragm wall, 55 panels between 15m and 20m deep x 600mm wall thickness. Installation of anchors for approximately 60 lin. m of wall.
Ductile Iron Pipe Piles (DIPP)
Просмотров 8 тыс.9 лет назад
Low headroom ductile iron pile pipes installed for new International Convention, Exhibition and Entertainment Precinct in Sydney, New South Wales
Driven Steel Tube Piling, LNG plant, NT
Просмотров 518 тыс.9 лет назад
Driving large diameter steel tube piles up to 12.5m in length for foundations for an LNG process plant in Northern Australia. Project Q1051
Inner boring inside driven steel tube piles, LNG plant, NT
Просмотров 40 тыс.9 лет назад
Drilling out inside driven steel tube piles where refusal has been encountered above designed towed level so that the tube can be redriven to reach the designed tow level. Project Q1051
Moranbah Mine Shaft
Просмотров 145 тыс.9 лет назад
2 mine shafts (4 & 5) are drilled and reamed to approximately 30m below ground level at 4.3m diameter, using shotcrete as wall stabilisation cast in night shift. Shaft (6) is 7.8m diameter, which requires the construction of a “ringed hard soft secant wall” around the perimeter prior to internal drilling at 7.3m diameter down to 30m.
Polymer Piling for Hexam Train Support Facility (TSF), NSW
Просмотров 26 тыс.9 лет назад
Works are for Aurizon's development of a new Train Support Facility (TSF). This will then service Aurizon's growing Hunter Valley Coal freight business and alleviate capacity pressures in the coal supply chain. Rotary bored piling for Middle Creek Bridge Jemena pipeline protection slab abutments - incorporating 78 No. 900mm diameter piles drilled under polymer support fluid. Total of 2532 lin/m...
Diaphragm Wall Construction Methodology
Просмотров 494 тыс.10 лет назад
A diaphragm wall is constructed using a narrow trench excavated in ground and supported by an engineered fluid (typically a bentonite mud) until the mud is replaced by the permanent material. Generally diaphragm walls are made from reinforced concrete, though unreinforced walls can also be used. Diaphragm walls are often used in congested areas or where the excavation depth is very deep which w...
300T crane lift of BG28 for difficult access piling
Просмотров 7 тыс.10 лет назад
Timelapse showing “lift in” by 300 t crane of a BG28 piling rig into a basement
BG28 Piling Rig Assembly in CFA mode
Просмотров 72 тыс.10 лет назад
A timelapse showing a BG28 piling rig being assembled for CFA mode
Controlled Stiffness Columns for ground improvement
Просмотров 9 тыс.10 лет назад
Construction of controlled stiffness column for soft soil ground treatment using the displacement auger method for a new Train Support Facility at Hexham New South Wales
Kings Square Bored Piles under Bentonite
Просмотров 28 тыс.10 лет назад
Bored piling under bentonite mud for 35m long 750mm diameter piles. Each pile was constructed with a permanent 21m long 813mm diameter steel casing. Kings Square, Perth, Western Australia
Secant Pile Wall Construction Methodology
Просмотров 368 тыс.10 лет назад
Embedded retaining walls are used in a wide variety of civil engineering applications including for embankment stabilisation, construction of basement walls, underpasses or tunnel approaches, in ground tanks and other buried structures. Use of in ground retaining walls can minimise the bulk excavation needed to achieve desired ground profiles. Walls can be used in temporary or permanent conditi...
CFA Methodology
Просмотров 264 тыс.10 лет назад
Continuous Flight Auger (CFA) Piling is the quietest form of piling and is a fast and very economical technique. It is a cast in-situ process, very suited to soft ground where deep casings or use of drilling support fluids might otherwise be needed. CFA piling is a non displacement piling system; hence the soil excavated from the pile is brought to the surface. CFA piles can be an attractive al...
Hume Dam Sheet Piling
Просмотров 5 тыс.10 лет назад
Installation of a sheet pile wall to facilitate remedial works to an existing dam in New South Wales, Australia. Project N1014
Sheet Piling for cofferdam Shell Cove
Просмотров 9 тыс.10 лет назад
Sheet Piling for cofferdam Shell Cove
It is can possible to drill up to 600 ft
🎉🎉🎉🎉
Very helpful
Cheer~~a system of methods used in a particular area of study or activity.😊
Man, I know it’s sad but I do love construction and man’s ingenuity to create 👍🏼
It's urgent
Send me diaphragm work agency number
👍
Wow, this is amazing, bro, this is a giant project
I just bought an older tow behind drill rill rig that I was told is for drilling shallow wells and I need more info on because it has solid continuous flight augers, 3" and 2" diameter, two 6' sections of each. They are not hollow for injecting anything down the center of them. It has a single cylinder Wisconsin 6.5 hp motor for the hydraulic assist to raise and lower the drill and a 2 cylinder Wisconsin 18hp motor with some type of transmission made by "Long-Airdox" that the drills are then attached to and driven. Anybody familiar with this? Thanks!
Risk of falling, absence of safety harness and lifeline for personnel.
Hello! We have a RUclips channel and would like to know if we could use some of your content from this video ?
did you just assume the pile gender?
Great.
Gracias por el piling
👍
How do you connect the basement slabs to the piles and ensure that the slab is properly supported at the edges?
The basement slab normally floats independently. Secant piling will not give a watertight structure, only a water resistant one and ground water will seep through giving damp stains. To make the basement watertight a drainage channel is connected to the drainage system and cast in a strip of concrete on the inside of the secant wall and the basement slab is built against the drainage channel slab. Then a wall is built off the basement slab leaving a sealed drained cavity on the inside face of the secant piled wall.
the techno track is bangin' on this one
Cool stuff.
Whats the pro-tip for doing it without polystyrene or timber?
ค
Hi, we are the PHPA factory, and supply the high vis polymer to many drilling company, would you like to try?
We can provide you with used trench cutter...
Thanks for sharing
Sweet. To much safety, giving the false confidence that the contracter has your safety 1st. But sweet video.
Can i get the ppt for this
Seeing that reminds me of how shitty that job was !!! One thing that sticks in my head was the fact of installing rectangular cages in round holes , obviously dreamed up by an engineer with more degrees than a thermometer but no common sense
you drill a pilot hole first then attach reamers which cut to the diameter of the next barrel which also has reamers and the material that is removed by the reamers falls into the pilot hole . lots of tool changing as you have to keep removing spoil from the pilot hole !! It's a slow process
I really don't miss doing CFA boring as bat shit !!! Mr Hat
Thanks for the video, very interesting and clear.
So time consuming way to dig a trench. Waste of time and money
Wow! That really is the mother of all drills!!
BOM DIA ! Pra mim é uma honra esta aqui te prestigiando, vamos sempre juntos somar e fortalecer nossos trabalhos, eu já estou por aqui!.
Nice sir. It's awesome
Which standard code you can follows sir.
What´s the reason for the very long kelly extension?
Thanks for the info.
most satisfying video i have ever seen. Amazing work! thanks for sharing.
Was this the BPi Westin Hotel. Look very familiar 😉
Excellent teamwork! Hope you guys always put safety as top priorities. Very good video
very illustrative video. May I know the tool you've used to create the animation. thanks
muy bonita tu animación mijo, saludos a tus papis
Tqq
Very well explanation
we get knowledge of your presentation pile drilling work
Good work
what is NDT used?
I am suroprised this doesn’t get more media coverage.
🙏🙏🙏👍👍👍
What are they doing with a giant cigarette??