- Видео 7
- Просмотров 78 290
Chethan Gowda R K
Индия
Добавлен 1 сен 2012
Видео
Design of box culvert
Просмотров 60 тыс.3 года назад
This video contains the complete design of box culvert
Design of Circular Tank
Просмотров 2233 года назад
This video has the complete design of circular water tank resting on ground
BOX CULVERT Introduction
Просмотров 2,9 тыс.3 года назад
This video gives the information about suitability of box culvert and its design and construction procedure
Hydraulic Design of Bridges 2/2
Просмотров 4 тыс.4 года назад
This video gives you the information about calculation of Design discharge and linear water way or length of bridge from the data collected during reconnaissance survey or primary site investigation
Hydraulic Design of Bridges 1/2
Просмотров 9 тыс.4 года назад
This video gives you the information about hydraulic design of river bridges. i.e parameters which controls the geometric design or dimensioning of bridges.
Pile Foundation for Bridges-1
Просмотров 1,9 тыс.4 года назад
This video gives you the information about types of pile foundation and design considerations of precast driven piles for bridges
Could be done in 20 mins. Good video though
best lecture ever please can I get the lecture materials and the tables used in the calculation. I want to apply the same to my students. However video not loud and clear in some port of 2/2 many thanks
Very Nice lecture Sir. Can we have a same type of a separate lecture on moment distribution method.....
Sir, please make a video of "design of U - through Culvert using staad pro"
Sir, check your units please
The sound of vedio is very low
How to add FTL of irrigation tanks in hydraulic design of bridge if there is a tank upstream of bridge?
Further, soil bearing capacity is not used in the design
Well explained
How 3.6 value taken in length of dispreesied
Can any one ans it
@@blessysugunagodsservant4487 See the longitudinal length of class AA loading (track length i.e.) it is 3600 mm
Sir, how we get the design and spacing of haunch bar ?
26:11 . A= L x D => d = 120 /60 => d = 2m, How we get L= 60m?
selam
Sir very good basic knowledge and easy to understand but volume is too slow waiting for all lectures in bridge design
sir please make an video for a 70R wheeled vehicle also as soon
Very los
From where b value cames 7.5
44:00
This is helpful. Very informative video and with clear explanation. Sir,it would be great if you could share video for multiple cells analysis. Thank you for sharing.
What is FRL full form?
finish road level
hello Sir, can we contact you for technical help?
Will we do the same for the Hydraulic Design of culverts?
thanks for the knowledge
Correction in distribution factor It is not 1/2L But it will be 1/(L/2)=2/L Other than it Nice explanation👍😍
Very Informative... Thanks...
I think the weight of bottom slab can be reduced from the upward reaction load since it is acting in the direction of gravity and against reaction load. That will reduce the moment and in turn required reinforcement. The reinforcement calculations are done for maximum moment and same reinforcement is provided on both sides. The moments at support being considerably less to the span moments, saving in reinforcement can be achieved to help save the national resources on materials. Also the criteria for providing reinforcement in haunch is not clear.
awesome
Thanks for the amazing explanation
can u plz do a vedio on design of precast box culverts
Wonderful explanation sir. Thanks
can we use the same method for loading analysis of multiple cell
Clear cut explanation 🥳
Sir next video on RCC Slab Bridge
Please show me the link of next video
Please send me the link for next video
Very neat presentation... Good work sir... Awaiting more such videos from you👍🏻
Sir apna numder do muje grillage sikhna h
Hi sir, please wanna name this book?
Sir , kindly design the box culvert in the staad pro software and explain.
Sir, in the side wall detailing, I think the 20 mm dia bar @180 mm spacing should be on the backfill side , not towards the stream side.. Because according to the moment diagram, the side walls are undergoing hogging moments only. And regarding haunch portion, how could we know that 3 bars of 8mm and 20 mm dia bars @200 mm spacing need to be put on the corners? Kindly reply
Sir which code is used for finding the value of "p",. "f". and "n"...
We want for such type of lessons please sir do it for us
Very Nice Presentation.. Keep Going
Very good explanation With practical problem.