Bilal Khan
Bilal Khan
  • Видео 33
  • Просмотров 114 075

Видео

Plate load test | HBC of soil | K value test | Safe bearing capacity of soil
Просмотров 2,2 тыс.9 месяцев назад
This video is based on how to perform plate load test to find out the hieghest bearing capacity of soil. If you have any doubt then ask me in comment section. For any inquiry call me at 8279524588, email us on bicbareilly@gmail.com
Pile load test in Pullout/tension/uplift | Pullout test | Uplift test.
Просмотров 2,1 тыс.Год назад
This is pile load test in pullout for heavy load. Here we have done arrangement for 500MT. This test is very complecated. This test was done as per IS2911 part 4. For soil test, pile load test service or engineer contact us 8279524588, 9999166558 email us bicbareilly@gmail.com
Routine Vertical Pile Load Test | load 420 MT | Vertical Test | safe bearing capacity | Pile Test
Просмотров 379Год назад
This is routine pile load test using sand bag kentledge methode as per IS 2911 part 4. We are providing pile load test, plate load test, pile integrity test service and also provide consultancy. Our test are very good and accurate in very competitive rates. Contact us for any information 8279524588, email us : bicbareilly@gmail.com feel free to contact us.
Initial Vertical Pile load test 188 MT | pile load test | Pile braring capacity test.
Просмотров 160Год назад
This is initial pile load test for more detail plz comment. For piling and pile load test and soil load bearing test, plate load test service contact us 8279524588 or email us on bicbareilly@gmail.com
Initial vertical pile load test in compression | test load 635 MT | kentledge test
Просмотров 1 тыс.2 года назад
This is initial vertical pile load test compression using kentledge plateform, for dead load we used CC block. Total test load 635 MT. Contact us for any pile load test or soil load test at 8279524588, email us bicbareilly@gmail.com
Vertical Pile Load test | Initial Pile Load Test | Pile Load Test.
Просмотров 1,3 тыс.2 года назад
This is vertical pile load test in compression using kentledge setup. 750 MT Load Test. Contact us for Querry and for work bicbareilly@gmail.com call us 8279524588 and 9999166558. We offer most competitive Rates.
Plate load test | Safe bearing Capacity of Soil | k-Value test | Soil test.
Просмотров 25 тыс.2 года назад
This is plate load test to find the safe bearing capacity of soil, footing load test. For any inquiry related how to do test or any consulting service please contact us on 8279524588 , 9999166558 or email us:- bicbareilly@gmail.com. We are Bharat Infra Constructions
Vertical Pile Load test using kentledge arrangement 75 Ton
Просмотров 1652 года назад
Contact us for any pile testing 8279524588, 9999166558 email us on bicbareilly@gmail.com
Initial Vertical Pile load test Upto 50-250MT | Vertical Test | Pile Load bearing Capacity.
Просмотров 3282 года назад
Initial Vertical Pile load test Upto 50-250MT | Vertical Test | Pile Load bearing Capacity.
Initial Vertical Pile load test in Compression | Anchor test
Просмотров 6622 года назад
Initial Vertical Pile load test in Compression | Anchor test
Lateral Pile Load test l Horizontal Pile load test | Initial pile load test in Lateral
Просмотров 1,2 тыс.2 года назад
Lateral Pile Load test l Horizontal Pile load test | Initial pile load test in Lateral
INITIAL PILE LOAD TEST IN COMPRESSION | Bridge Load test | Pile test | Vertical load test.
Просмотров 2 тыс.2 года назад
INITIAL PILE LOAD TEST IN COMPRESSION | Bridge Load test | Pile test | Vertical load test.
Lateral pile load test | initial horizontal load pile test.
Просмотров 5 тыс.3 года назад
Lateral pile load test | initial horizontal load pile test.
Vertical Pile load test | Load maintain method | 1000 MT.
Просмотров 1,4 тыс.3 года назад
Vertical Pile load test | Load maintain method | 1000 MT.
Initial Cyclic Pile load test | Cyclic test | block test
Просмотров 7 тыс.3 года назад
Initial Cyclic Pile load test | Cyclic test | block test
Vertical pile load test l Initial Pile load test in compression | IIT Roorkee
Просмотров 3983 года назад
Vertical pile load test l Initial Pile load test in compression | IIT Roorkee
Pile integrity test | Low strain test . | how to check pile length
Просмотров 1,5 тыс.3 года назад
Pile integrity test | Low strain test . | how to check pile length
Routine Pile load test in Compression | H-shaped Anchor Test Design.
Просмотров 2,4 тыс.3 года назад
Routine Pile load test in Compression | H-shaped Anchor Test Design.
Initial Pile load test in Lateral | horizontal Pile load test.
Просмотров 1,8 тыс.3 года назад
Initial Pile load test in Lateral | horizontal Pile load test.
Footing Load Test | Load bearing capacity of Footing 2m x 2m x 1m
Просмотров 5003 года назад
Footing Load Test | Load bearing capacity of Footing 2m x 2m x 1m
Initial Vertical pile load test 1075MT by Kentledge
Просмотров 1,4 тыс.3 года назад
Initial Vertical pile load test 1075MT by Kentledge
Vertical Pile load test failure point
Просмотров 7 тыс.3 года назад
Vertical Pile load test failure point
Routine Vertical Pile Load test By Anchor Arrangement | Anchor test | Static load test.
Просмотров 13 тыс.3 года назад
Routine Vertical Pile Load test By Anchor Arrangement | Anchor test | Static load test.
Pile Cyclic Load test | Pile load test | Skin Friction and End Bearing Test.
Просмотров 6 тыс.3 года назад
Pile Cyclic Load test | Pile load test | Skin Friction and End Bearing Test.
Pile load test in Pullout
Просмотров 14 тыс.3 года назад
Pile load test in Pullout

Комментарии

  • @rahulandani1716
    @rahulandani1716 22 дня назад

    Rate of per plate load test?

    • @BilalKhanbic
      @BilalKhanbic 21 день назад

      Without platform 40,000 with setup 60,000

  • @rahulandani1716
    @rahulandani1716 Месяц назад

    How settlement is calculated in mm/min?

  • @rintuMukherjee-nd2tj
    @rintuMukherjee-nd2tj Месяц назад

    Maximum settelment kitna ha as per is code

    • @BilalKhanbic
      @BilalKhanbic Месяц назад

      As per latest is code min. Settlement is 18mm and max. Settlement is 10% of pile dia.

  • @ratuldas360
    @ratuldas360 3 месяца назад

    At what level is the initial pile load test done? Is it conducted at the cut-off level or the pile cap level?

  • @azazur4726
    @azazur4726 3 месяца назад

    Is code mai is Anchor bar ki Welding kitna hona chahiye or legth or Uska procedure mention nhi hai 😅 Aapka is test k procedure k bare mai pujhe koi code bata dijiye 💫

    • @BilalKhanbic
      @BilalKhanbic 3 месяца назад

      Bahot lambi ho jayegi video, agar her cheez ko describe kiya. Use IS2911 part4

  • @abdullahwazir7537
    @abdullahwazir7537 4 месяца назад

    worst possible arrangement of refrence beams

  • @sachinmali6116
    @sachinmali6116 5 месяцев назад

    Nice

  • @Civilengineeringsitevlog
    @Civilengineeringsitevlog 5 месяцев назад

    Good work Bilal ji

  • @Jwshs88
    @Jwshs88 7 месяцев назад

    Bai apka company me job mil sakte he? Apke shat personal bath kor saktahu?

    • @BilalKhanbic
      @BilalKhanbic 7 месяцев назад

      Mail your resume at bicbareilly@gmail.com

  • @krishnaupadhyay7373
    @krishnaupadhyay7373 7 месяцев назад

    Apka test load kitna h pile per or anchor pile ka total weight kitna h

    • @BilalKhanbic
      @BilalKhanbic 7 месяцев назад

      Bahot time ho gaya test ko to yaad nhi h, approx 250-300 ton test load hoga.

  • @rahulkumar-pm5ji
    @rahulkumar-pm5ji 8 месяцев назад

    Requesting you to show us the actual calculations also...pls

  • @abdulwassay4269
    @abdulwassay4269 10 месяцев назад

    Main guitar Kitna kai hai

  • @subinks5652
    @subinks5652 10 месяцев назад

    How much is the safe load ?

  • @vishwjeetsingh1947
    @vishwjeetsingh1947 11 месяцев назад

    Nice video

  • @SHARDACHARANGUPTA-yd9gj
    @SHARDACHARANGUPTA-yd9gj 11 месяцев назад

    Sir, Depth of testing level kaise nikalta h?

    • @BilalKhanbic
      @BilalKhanbic 10 месяцев назад

      As per is code and design consultant

  • @muzamillmohammad1110
    @muzamillmohammad1110 Год назад

    Thoda detail video banayi sir please

    • @BilalKhanbic
      @BilalKhanbic Год назад

      Aap comment me pooch sakte h. Jyada detail cover nhi ho paati video me

  • @subratkumaranayak6232
    @subratkumaranayak6232 Год назад

    Sir pls load ka calculation sheet send kijiye

    • @BilalKhanbic
      @BilalKhanbic Год назад

      Aap pooch sakte h, site ka data share nahi kiya ja sakta, privacy ki wajha se

  • @shashiranjan9031
    @shashiranjan9031 Год назад

    Bhai kahi job hai toh batao yaar PIT,vertical test aata hai

    • @PalJiProduction
      @PalJiProduction 11 месяцев назад

      Bhai job mil gayi hai ab aapko kya

    • @BilalKhanbic
      @BilalKhanbic 10 месяцев назад

      Send your CV on bicbareilly@gmail.com

  • @hamidkhankhan5234
    @hamidkhankhan5234 Год назад

    Will you like share to me your WhatsApp number

  • @AKRAMKHAN-mb3df
    @AKRAMKHAN-mb3df Год назад

    pull out test kaise karte janab

  • @MotivaMillionaire2.0
    @MotivaMillionaire2.0 Год назад

    Really very informative video sir ❤

  • @waynewai2276
    @waynewai2276 Год назад

    Hi, why don’t use LVDT ?

  • @thetehleelvlogs594
    @thetehleelvlogs594 Год назад

    Why we perform this in field plz ans

  • @akramkhanvlogs_
    @akramkhanvlogs_ Год назад

    Nice video

  • @bridgeconstruction_irwansyah

    good Mr. Bilal.

  • @M.S.U_Engineering
    @M.S.U_Engineering Год назад

    Nice explained sir

  • @constructionworks7264
    @constructionworks7264 Год назад

    एक कोटेशन चाइए मुझे, पायल टेस्ट की प्लीज दीजिए 356 टन की

  • @constructionworks7264
    @constructionworks7264 Год назад

    Good

  • @empiregaming2094
    @empiregaming2094 Год назад

    Awesome

  • @MohakNagrani
    @MohakNagrani Год назад

    What is the design test load given at site?...And what is the size of concrete block where hydraulic jack is attached?

    • @BilalKhanbic
      @BilalKhanbic Год назад

      Safe load 11 MT Block size 1200 x 1200 Jack is in between block and pile

  • @bsnegi
    @bsnegi Год назад

    हमें एक रूटीन पाईल लोड टेस्ट के लिए रेट अनालिसिस करना है कुछ आइडिया दें Pile dia is 1500mm

    • @BilalKhanbic
      @BilalKhanbic Год назад

      +91 99717 72593 Is per call kar lijiye sir

  • @Amanpatelshorts
    @Amanpatelshorts Год назад

    Good 👍

  • @informeta2022
    @informeta2022 Год назад

    Hi Bilal bhai.. Can i get any vendor contact details for plate load test

  • @MAYUDHAENTERPRISES
    @MAYUDHAENTERPRISES 2 года назад

    hi

  • @knowledgeforcivilengineer9773
    @knowledgeforcivilengineer9773 2 года назад

    TQ

  • @knowledgeforcivilengineer9773
    @knowledgeforcivilengineer9773 2 года назад

    Very nice vedio sir

  • @vijaypandit1644
    @vijaypandit1644 2 года назад

    Mobile number de sakte hai sir

  • @vijaypandit1644
    @vijaypandit1644 2 года назад

    Aap ka kon sa company hai sir

  • @rizz682
    @rizz682 2 года назад

    Guru g shukriya..

  • @mohdaaftabalam6764
    @mohdaaftabalam6764 2 года назад

    इसमें आपको लाइट कम होने की वजह से आपको चोट लगा है इसके हर गाटर की बर्बादी करो स्कार्टर को

  • @ErAzeemKhan
    @ErAzeemKhan 2 года назад

    Waoo

  • @mohdaaftabalam6764
    @mohdaaftabalam6764 2 года назад

    यह वीडियो बहुत मेहनत लगा होगा बहुत अच्छा वीडियो

  • @rizz682
    @rizz682 2 года назад

    Thank you sir. Concept clear krne k lie

    • @BilalKhanbic
      @BilalKhanbic 2 года назад

      3 saal baad concept clear hua. 😂

  • @JavedKhan-lq5zv
    @JavedKhan-lq5zv 2 года назад

    Very informative video Sir Ji

  • @Altamushuddin
    @Altamushuddin 2 года назад

    Lage raho mamu 👍😁

  • @ErAzeemKhan
    @ErAzeemKhan 2 года назад

    Gajab er sahab ❤️

  • @omg_gopal
    @omg_gopal 2 года назад

    Shandaar Good work Keep it up

  • @CrazyBoy-ns3wi
    @CrazyBoy-ns3wi 2 года назад

    💥💥💥💥💥❤‍🔥❤‍🔥❤‍🔥one of the best thing i have seen on internet , thankyou sir

  • @dasjayantaapc
    @dasjayantaapc 2 года назад

    Good information 👌👌👌

  • @barbiegirl2.o633
    @barbiegirl2.o633 2 года назад

    Nice 👌