Metromont
Metromont
  • Видео 27
  • Просмотров 171 488
Palmer Lakes Logistics Center
Located in Miami, FL, on over 9 acres of land, Palmer Lakes Logistics Center is the first multistory industrial warehouse in South Florida. The Class A, LEED certified three-story precast concrete building provides storage, loading bays, offices, and parking spaces.
Metromont’s Bartow manufacturing plant produced 564,190 SF of precast concrete for this project, and the warehouse totals almost 970,000 SF.
Parking is accessible on all levels of the distribution center and seamlessly wraps around the offices and warehouse space. The use of precast provides exceptional durability, provides long clear spans, and allows the structure to transition from an office to a parking garage to a warehouse...
Просмотров: 327

Видео

LUNA at Viera Apartment Community
Просмотров 6239 месяцев назад
LUNA at Viera is a six-story upscale apartment community in Viera, Florida, surrounded by some of the city’s most prominent buildings. The total precast concrete design utilizes Metromont’s proprietary MetroDeck flooring system and is comprised of 256,158 SF of precast concrete produced at Metromont’s Bartow, FL, manufacturing facility. The project also includes a 101,704 SF parking deck with f...
Brightline Boca Raton Parking Deck
Просмотров 3079 месяцев назад
The Brightline Parking Garage in Boca Raton, FL, provides parking for passengers of the Brightline high-speed railway linking Orlando and Miami. The garage features four elevated levels of precast concrete and provides 391 parking spaces for passengers and Brightline employees. Metromont’s Bartow, FL, manufacturing facility produced 129,047 SF of elevated precast for this project. All precast c...
DCD Talks -- Rapid Deployment in Data Center Construction with Marshall Sorenson
Просмотров 179Год назад
In this DCD Talk from DCD Connect Live - NY on March 27-28, Shockey Precast VP of Business Development Marshall Sorenson shares how all-precast concrete systems are providing the data center industry with the rapid deployment, flexibility, and efficiencies necessary to meet the demands of the fast-paced world of data center shell construction. www.datacenterdynamics.com/en/dcd-connect-live/conn...
Chris Pastorius Receives 2023 Mario J. Bertolini Leadership & Innovation Award
Просмотров 56Год назад
Metromont and Shockey Precast congratulate VP/GM Chris Pastorius as the recipient of the 2023 Mario J. Bertolini Leadership & Innovation Award. The award recognizes a Precast/Prestressed Concrete Institute (PCI) producer member who has demonstrated an outstanding ability in the management of precast concrete operations and in support of PCI and the precast concrete industry while exhibiting Ber...
Crystal Substation Total Precast Concrete Construction
Просмотров 1 тыс.Год назад
Construction time-lapse video of the total precast concrete Crystal Substation in Arlington, VA.
Design Build Done Right Shockey Precast A Metromont Company
Просмотров 281Год назад
Design Build Done Right Shockey Precast A Metromont Company
Metromont Brand Story
Просмотров 1,3 тыс.2 года назад
Metromont Brand Story
Heritage Plaza Finished Project Highlight
Просмотров 7072 года назад
Drone's-eye view of the total precast, design-build mixed-use Heritage Plaza Office Building and Parking Deck in Lakeland, FL. In a unique twist, four clients joined forces to fund the construction of Heritage Plaza in the heart of downtown Lakeland. The Plaza includes a six-level parking garage with convenient entrance access on both Tennessee and Kentucky Avenues along with 40,000 sq ft of at...
The Pearl
Просмотров 1,4 тыс.2 года назад
Located in Tampa, FL, The Pearl is a mixed-use apartment complex in the historic Tampa Heights neighborhood. Two of its three apartment buildings (Buildings #1 and #2) are constructed using Metromont's total precast solution, the MetroDeck system. Building #3 was constructed with block and precast concrete hollowcore. Building #1 is a seven-level, 128,939-SF total precast structure with 107 uni...
Cascades Tallahassee Mixed-Use Development
Просмотров 7162 года назад
Encompassing a two-block area across from the 24-acre Cascades Park, The Cascades mixed-use project in Tallahassee, FL is a vibrant live-work-play experience that includes a seven-story total precast AC Marriott hotel, an eight-story total precast apartment tower with 161 market-rate apartments, and a precast parking deck. Produced by Metromont’s Bartow, FL manufacturing facility, both the AC M...
Heritage Plaza Office Building & Parking Deck
Просмотров 2562 года назад
Time-lapse video of the precast concrete erection of the Heritage Plaza Office Building and Parking Deck in Lakeland, FL.
Total Precast Concrete Solutions: The MetroDeck System
Просмотров 36 тыс.2 года назад
Total Precast Concrete Solutions: The MetroDeck System
The Metropolitan at State College
Просмотров 1,4 тыс.3 года назад
Designed to meet the needs of both students and non-students in the community, The Metropolitan at State College is a 12-story, U-shaped mixed-use building with urban convenience. The building combines a total of 132 residential units with office space, 40,000 SF of retail/amenity space and three levels of underground structured parking. The Metropolitan was initially designed with a cast-in-pl...
GSU Piedmont Central Student Dorm
Просмотров 1 тыс.3 года назад
Time-lapse construction of the GSU Piedmont Central Student Dorm. The design/build team opted to use precast concrete for this project when preparing the winning proposal to the owner. Metromont joined the design team and helped to prepare the proposal, then assisted with construction designs. The two primary reasons for selecting a total precast structure were speed of erection to meet a trunc...
NOVA Time-Lapse
Просмотров 1,3 тыс.3 года назад
NOVA Time-Lapse
Suzanne Aultman Receives PCI's Irwin J. Speyer Young Professionals Award
Просмотров 913 года назад
Suzanne Aultman Receives PCI's Irwin J. Speyer Young Professionals Award
Hawkins Mixed-Use Multifamily Housing Tower
Просмотров 4644 года назад
Hawkins Mixed-Use Multifamily Housing Tower
PCI Fellow Video
Просмотров 2675 лет назад
PCI Fellow Video
Metromont Corporation | We've Gone Solar!
Просмотров 4226 лет назад
Metromont Corporation | We've Gone Solar!
Metromont Corporation | Building a Mold for Architectural Precast Concrete
Просмотров 1,1 тыс.6 лет назад
Metromont Corporation | Building a Mold for Architectural Precast Concrete
Metromont Corporation | Precast Concrete, Start to Finish
Просмотров 2,9 тыс.8 лет назад
Metromont Corporation | Precast Concrete, Start to Finish
Metromont Corporation | Precast Schools
Просмотров 2,2 тыс.8 лет назад
Metromont Corporation | Precast Schools
Metromont Corporation | Parking Structures
Просмотров 2 тыс.8 лет назад
Metromont Corporation | Parking Structures
Metromont Corporation | Total Precast
Просмотров 106 тыс.8 лет назад
Metromont Corporation | Total Precast
Metromont Corporation | Precast 101
Просмотров 4,7 тыс.8 лет назад
Metromont Corporation | Precast 101
Metromont Corporation | Brand Story
Просмотров 4,5 тыс.8 лет назад
Metromont Corporation | Brand Story

Комментарии

  • @nwankwonnamdi8729
    @nwankwonnamdi8729 3 месяца назад

    I'm interested to work here

  • @biznizsenz2583
    @biznizsenz2583 4 месяца назад

    Hi there, we are looking for a company that can build a school in Africa using this method. Please be so kind as to let me know if you have any contact with a company like that. Shaun Brandon

  • @AliouneGueye-td3wt
    @AliouneGueye-td3wt 7 месяцев назад

    ❤❤

  • @marialauraweems7553
    @marialauraweems7553 7 месяцев назад

    "... helps us anticipate issues before they arise" 🤔

  • @Josh-yr7gd
    @Josh-yr7gd 8 месяцев назад

    "Are you in good hands?" "That's Allstate's stand"

  • @hasnainkalwar5461
    @hasnainkalwar5461 8 месяцев назад

    how the parking is made?is it also prefab?

  • @mohanlal16
    @mohanlal16 10 месяцев назад

    Where I can see your building near Delhi. For a school

  • @uberdash007
    @uberdash007 Год назад

    Do you service in USA nyc NJ ?

  • @eng_abdrahman_ali
    @eng_abdrahman_ali Год назад

    contact info plz

  • @VASYLIEV
    @VASYLIEV Год назад

    Your company could help Ukraine in reconstruction after the war.

    • @Elontusk40
      @Elontusk40 9 месяцев назад

      No

    • @Elontusk40
      @Elontusk40 9 месяцев назад

      Why dont do you help and help instead of telling others to

    • @johncford3957
      @johncford3957 8 месяцев назад

      Because RuZZia is goin to pay to rebuild what they have destroyed.@@Elontusk40

    • @philrabe910
      @philrabe910 8 месяцев назад

      @@Elontusk40 where did you get that at Elontusk told others what to do? it soulds like a great idea, except that Ukraine already embraces this tech. Most of the destroyed towers are of prefab panels.

    • @MiroBG359
      @MiroBG359 4 месяца назад

      Ukraine freeloaders always looking for handouts

  • @mohamedmansour875
    @mohamedmansour875 Год назад

    I would like have more information

  • @sumittravel5464
    @sumittravel5464 Год назад

    2bk 34/26

  • @gastonbugingo1923
    @gastonbugingo1923 2 года назад

    Fantastic

  • @darealdealsharieff1549
    @darealdealsharieff1549 2 года назад

    Amazing project, can you tell me how long did it take to finish the project from the start to finish ?

  • @mehbubkhan2244
    @mehbubkhan2244 2 года назад

    10yars explanation Saudi Arabia premco precast

  • @mehbubkhan2244
    @mehbubkhan2244 2 года назад

    Sir kya job vacency he kya

  • @tlusx777
    @tlusx777 2 года назад

    Please can we work together

  • @vmrais
    @vmrais 2 года назад

    Where can we see the project around mumbai

    • @Metromont
      @Metromont 2 года назад

      Metromont Corporation works in the US only.

  • @vmrais
    @vmrais 2 года назад

    What is cost of construction for 14000 sq ft building

  • @joepeters4045
    @joepeters4045 3 года назад

    Imbed Plates.... technology of the last century.....

    • @aSASa45454
      @aSASa45454 8 месяцев назад

      what do you propose instead?

  • @imdattokat
    @imdattokat 3 года назад

    Muhteşem

  • @lukacsattila9868
    @lukacsattila9868 3 года назад

    0.38-nál mi az a repedés?Elég veszélyesnek tűnik...

  • @homestecconstructionarchit6928
    @homestecconstructionarchit6928 3 года назад

    Magnifique

  • @davidallur4342
    @davidallur4342 3 года назад

    How can I contact you

  • @Ishuttanu
    @Ishuttanu 3 года назад

    sir i worked as a precast draftsman in Dubai for 4 years and now no job . are there any vacancy

  • @varunphadke4497
    @varunphadke4497 3 года назад

    Mast (Translation : Very nice)

  • @shenoyglobal
    @shenoyglobal 3 года назад

    is it possible to have precast exterior cladding like marble or granite?

    • @MegaMrstfu
      @MegaMrstfu 3 года назад

      I would also like to know that, that's exactly what I was thinking aswel.

    • @AadrianB09
      @AadrianB09 3 года назад

      I believe that in the case of such brittle materials the cladding should be added after the elements are assembled. The walls can come with the connections embedded and the marble/granite can be later added to the facade using the embedded connections.

  • @fernandoaranda5235
    @fernandoaranda5235 3 года назад

    how to apply your company ihave 9year experence precast erector here in saudi aŕabia

  • @donaldbrown73
    @donaldbrown73 5 лет назад

    Congrats Suzanne.........

  • @jonathansosu8584
    @jonathansosu8584 5 лет назад

    How do I contact you

  • @kasmirsingh3755
    @kasmirsingh3755 6 лет назад

    Kashmir Singh new mamotra engg works Batala 143505/pb.ind price for Mainer. Kasmirsingh24126@gmilcom918360455050w

  • @salihalp5106
    @salihalp5106 6 лет назад

    Prekast montaj silikon boya uygulama işleriniz yapılır

  • @bryjabeeda1261
    @bryjabeeda1261 6 лет назад

    ماهذا البناء ؟؟؟؟ هذا قديما /// هناك نظام الكوفور المعزول حراريا هو الأسرع والأفضل جدران سمك 160/200/250/ في حالة احتياجكم لالواح الكوفور اعلامنا مع التقدير