Delivery of Bidwell to the project site.
Delivery of Bidwell to the project site.
Просмотров: 186

Видео

May_24_Girder_Setting_Span_3_Girder D.MOV
Просмотров 8712 лет назад
Time: 0254 Thursday, May 24 / Span 3, Girder "D," between Piers 3 and 4 - Girder "D," fourth of five girders, being placed at Span 3. View looking northwest from east ROW of Interstate 5, just south of Retaining Wall No. 4. Girder setting began at Midnight, and continued on to 0400, with rain persisting throughout the night.
May_24_Girder_Setting_Span_3_Girder C.MOV
Просмотров 7112 лет назад
0200 on Thursday, May 24, 2012 / Span 3 between Piers 3 and 4 - Girder "C," third of five, being lifted into place. Steady rain persisted throughout the night's operation.
Picking 2nd concrete girder
Просмотров 15112 лет назад
Placing the 2nd concrete girder that goes between piers #1 and #2.
Placing 1st Concrete Girder
Просмотров 51112 лет назад
Atkinson Construction along with Ness Cranes placing the 1st of 15 concrete girders for the Lakewood Triangle Access Bridge from pier #1 to #2 going over Twin Lakes Ave.
Asphalt Paving
Просмотров 63912 лет назад
Its not very often you will have 3 rollers working this close together while paving.
Starting to Pave
Просмотров 28512 лет назад
First day of paving w/ 1" HMA. 3" base course provided and placed by Lakeside Industries.
Structural Earth Wall
Просмотров 19712 лет назад
Structural Earth Wall
Structural Earth Wall
Просмотров 5112 лет назад
Structural Earth Wall
Structural Earth Walls
Просмотров 8612 лет назад
Placing one of the panels for the Structural Earth Wall west of Pier #1
Fascia Walls
Просмотров 26912 лет назад
Pumping concrete into the forms for the new fasica wall at pier #4.
Fascia Wall Footings
Просмотров 20112 лет назад
Placing concrete in the fascia wall footings around Pier #4.
Placing Concrete in Pier #4 Columns
Просмотров 13212 лет назад
Placing Concrete in Pier #4 Columns
Picking Shaft Cage
Просмотров 16013 лет назад
Picking Shaft Cage
Pier #1 North Shaft Concrete Placement
Просмотров 1,1 тыс.13 лет назад
Concrete Nor'west is delivering the Class 4000P mix which is then pumped through a tremie pipe by Ralph's Concrete Pumping and Malcom Drilling.
Pier #1 North Shaft Cleanout
Просмотров 28913 лет назад
Pier #1 North Shaft Cleanout
Pier #1 North Shaft
Просмотров 28813 лет назад
Pier #1 North Shaft
Picking Pier #2 North Shaft Cage
Просмотров 1,3 тыс.13 лет назад
Picking Pier #2 North Shaft Cage
Pier #2 North Shaft
Просмотров 31213 лет назад
Pier #2 North Shaft
Drilling Pier #2 North Shaft
Просмотров 30813 лет назад
Drilling Pier #2 North Shaft
Lifting Pier #2 steel cage
Просмотров 17 тыс.13 лет назад
Lifting Pier #2 steel cage
Pumping concrete into Pier #4 North Shaft
Просмотров 65613 лет назад
Pumping concrete into Pier #4 North Shaft
Raising the steel shaft linings while pumping concrete
Просмотров 1,7 тыс.13 лет назад
Raising the steel shaft linings while pumping concrete
Placing Pier #4 North Shaft Cage
Просмотров 40013 лет назад
Placing Pier #4 North Shaft Cage
Placing Pier #4 North Shaft Cage
Просмотров 19813 лет назад
Placing Pier #4 North Shaft Cage
Drilling Pier #4 South Shaft
Просмотров 1,2 тыс.13 лет назад
Drilling Pier #4 South Shaft
Marysville Bridge Pier 4 South Shaft
Просмотров 12 тыс.13 лет назад
Marysville Bridge Pier 4 South Shaft