Blissful Beats
Blissful Beats
  • Видео 143
  • Просмотров 1 250 631
Mumbai Metro Route Map | Lines 1, 2A & 2B, 3, 4, 5, and 6 Explained
The Mumbai Metro is a rapid transit system serving the city of Mumbai, India. It is a crucial component of the city's public transportation network, providing a fast and efficient means of commuting for millions of residents and visitors. The system consists of several interconnected lines, and the Mumbai Metro map is an essential tool for navigating the system.
Get all the latest updates, news, design, project details, progress, construction, current status, and drone view of the project.
🔴 SUBSCRIBE for more exciting videos!!: ruclips.net/channel/UChScgXlI6q8hZIHdcFPGy9w 🔴
DISCLAIMER:- All information on this channel is taken from the internet. This RUclips channel does not claim the trut...
Просмотров: 23 168

Видео

Ayodhya Ring Road Project Details | Latest Update | Progress | Construction | News | Current Status
Просмотров 5 тыс.2 года назад
Ayodhya Ring Road is a proposed 65 km route through the outskirts of Ayodhya. It is being developed to cater to the increasing tourism that will come here once the Ram temple is opened. Along with the ring road, the government plans to create 6 special economic zones along its route. Get all the latest updates, news, design, project details, progress, construction, current status, and drone vie...
Dwarka Expressway Project Details | Latest Update | Progress | Construction | News | Current Status
Просмотров 1,5 тыс.2 года назад
Dwarka Expressway is an 8-lane under construction 29.1 km long expressway connecting Mahipalpur in Delhi to Kherki Daula Toll Plaza, Gurgaon in Haryana. It is an alternate road link between Dwarka in Delhi and Gurgaon and is expected to ease the traffic situation on the Delhi-Gurgaon Expressway. Get all the latest updates, news, design, project details, progress, construction, current status, a...
Surat Chennai Expressway Project Details | Latest Update | Progress | Construction | Current Status
Просмотров 21 тыс.2 года назад
Surat Chennai Expressway is an under construction greenfield expressway with a length of 1461 km. It will reduce travel time between Chennai and Surat by six hours and distance by 330 km. Get the latest updates, news, design, project details, progress, construction, current status, and drone view of the project. 🔴 SUBSCRIBE for more exciting videos!!: ruclips.net/channel/UChScgXlI6q8hZIHdcFPGy9...
Ganga Expressway Project Details | Latest Update | Progress | Construction | News | Current Status
Просмотров 7132 года назад
Ganga Expressway is an under-construction 594 km long and 6-lane wide greenfield expressway that will connect Meerut with Allahabad. Prime Minister Narendra Modi laid the foundation stone for Ganga Expressway on 18 December 2021 in Shahjahanpur. Get all the latest updates, news, design, project details, progress, construction, current status, and drone view of the project. 🔴 SUBSCRIBE for more ...
Dombivli Mankoli Bridge Status | Project Details | Latest Update | Progress | Construction | News
Просмотров 13 тыс.2 года назад
Dombivli and Mankoli will come closer once the Dombivli Mankoli Bridge is completed by end of this year. It is a 1.3 km long six-lane bridge, over the Ulhas River. The bridge is being developed at an estimated cost of Rs, 223 crores. Get all the latest updates, news, design, project details, progress, construction, current status, and drone view of the project. 🔴 SUBSCRIBE for more exciting vid...
Trans Haryana Expressway Project Details | Latest Update | Progress | Construction | Current Status
Просмотров 1,1 тыс.2 года назад
The Trans Haryana Expressway is a 227 km long and 6-lane wide access-controlled expressway that connects Gangheri village in Kurukshetra district with Surana village in Mahendragarh district. Get all the latest updates, news, design, project details, progress, construction, current status, and drone view of the project. 🔴 SUBSCRIBE for more exciting videos!!: ruclips.net/channel/UChScgXlI6q8hZI...
Bangalore Outer Ring Road Project Details | Latest Update | Progress | Construction | Current Status
Просмотров 13 тыс.2 года назад
Bangalore Outer Ring Road (ORR) was developed between 1996 and 2002 by Bangalore Development Authority. It is a 60-kilometer-long road and goes along important localities of Bengaluru. Get all the latest updates, news, design, project details, progress, construction, current status, and drone view of the project. 🔴 SUBSCRIBE for more exciting videos!!: ruclips.net/channel/UChScgXlI6q8hZIHdcFPGy...
Amritsar Jamnagar Expressway Project Details | Latest Update | Progress | News | Current Status
Просмотров 3,8 тыс.2 года назад
Amritsar Jamnagar Expressway is an under-construction 4-lane wide expressway that passes through four states - Punjab, Haryana, Rajasthan, and Gujarat. The expressway will reduce the travel time between Amritsar and Jamnagar from earlier 26 hours to only 13 hours. Get all the latest updates, news, design, project details, progress, construction, current status, and drone view of the project. 🔴 ...
Pune Ring Road Latest Update | Project Details | Design | Progress | Construction | Current Status
Просмотров 13 тыс.2 года назад
Pune Ring Road is a proposed 170 km-long, eight-lane express highway that will be built around Pune to divert all traffic that passes through the city. Once completed this project will also explore new areas for residential, commercial complexes, and socio-economic developments. Get all the latest updates, news, design, project details, progress, construction, current status, and drone view of ...
Hyderabad Regional Ring Road Project Details | Latest Update | Construction | News | Current Status
Просмотров 4,2 тыс.2 года назад
Hyderabad Regional Ring Road is a proposed 340 km, 4-lane access-controlled expressway project by the National Highway Authority of India that will come outside of Hyderabad at a distance of 40 km. Get all the latest updates, news, design, project details, progress, construction, current status, and drone view of the project. 🔴 SUBSCRIBE for more exciting videos!!: ruclips.net/channel/UChScgXlI...
Goregaon Mulund Link Road Project Details | Latest Update | Design | Progress | Construction | News
Просмотров 11 тыс.2 года назад
BMC kicked off the construction work of Goregaon Mulund Link Road on March 14. GMLR will be developed in 3 phases and currently work on phase 2 is being undertaken. It will be 12.2 kilometers long and partly elevated and underground. Get the latest updates, news, design, project details, progress, construction, current status, and drone view of the project. 🔴 SUBSCRIBE for more exciting videos!...
Virar Alibaug Multimodal Corridor Project Details | Latest Update | Progress | Construction | News
Просмотров 14 тыс.2 года назад
Virar Alibaug Multi Modal Corridor is a single corridor having a total length of 126 km, which incorporates multiple modes, such as buses, BRT, metro rail, cars, and non-motorized track. A section of this corridor has been approved by MCZMA and other departments and construction will start in the next few months. Get all the latest updates, news, design, project details, progress, construction,...
Mumbai Nagpur High Speed Rail Corridor Project Details | Latest Update | Progress | Construction
Просмотров 2,3 тыс.2 года назад
Mumbai Nagpur High-Speed Rail Corridor is one of the six high-speed rail corridors that is proposed by the Government of India. It will connect Mumbai with Nagpur and will run entirely within Maharashtra. Get all the latest updates, news, design, project details, progress, construction, current status, and drone view of the project. 🔴 SUBSCRIBE for more interesting videos!!: ruclips.net/channel...
Kalyan Ahmednagar Railway Project Details | Latest Update | Progress | Construction | News | Status
Просмотров 13 тыс.2 года назад
Kalyan Ahmednagar railway project is a 246 km railway line that will run between rural areas of Thane, Pune, and Ahmednagar. This will bring the strategically located Vidharbha and Marathwada regions close to Mumbai. Once completed, this rail corridor will help people avoid taking the dangerous Malshej ghat section that comes under National Highway 222. Get all the latest updates, news, design,...
PM Narendra Modi Launches 11 Projects In Chennai
Просмотров 4172 года назад
PM Narendra Modi Launches 11 Projects In Chennai
Vitawa Thane Skywalk Project Details | Latest Update | Design | Progress | Construction | Status
Просмотров 2,8 тыс.2 года назад
Vitawa Thane Skywalk Project Details | Latest Update | Design | Progress | Construction | Status
Konkan Railway Electrification Project Details | Latest Update | Progress | Construction | Status
Просмотров 4 тыс.2 года назад
Konkan Railway Electrification Project Details | Latest Update | Progress | Construction | Status
Mega Projects In Navi Mumbai Details | Latest Update | Design | Progress | Drone | Construction
Просмотров 3912 года назад
Mega Projects In Navi Mumbai Details | Latest Update | Design | Progress | Drone | Construction
Bangalore Metro Route Map Project Details | Latest Update | Design | Progress | Current Status
Просмотров 47 тыс.2 года назад
Bangalore Metro Route Map Project Details | Latest Update | Design | Progress | Current Status
Vasai Panvel Local Train Project Details | Latest Update | Progress | Construction | News | Status
Просмотров 12 тыс.2 года назад
Vasai Panvel Local Train Project Details | Latest Update | Progress | Construction | News | Status
Hosur Metro Train Project Detail | Latest Update | Design | Progress | Construction | Current Status
Просмотров 5 тыс.2 года назад
Hosur Metro Train Project Detail | Latest Update | Design | Progress | Construction | Current Status
Mumbai Metro Train Route Map Project Details | Latest Update | Design | Progress | Construction
Просмотров 2,1 тыс.2 года назад
Mumbai Metro Train Route Map Project Details | Latest Update | Design | Progress | Construction
Namma Metro Phase 3 Project Details | Latest Update | Design | Progress | Construction | News
Просмотров 11 тыс.2 года назад
Namma Metro Phase 3 Project Details | Latest Update | Design | Progress | Construction | News
Namma Metro Phase 2 - Project Details | Latest Update | Design | Progress | News | Current Status
Просмотров 1,4 тыс.2 года назад
Namma Metro Phase 2 - Project Details | Latest Update | Design | Progress | News | Current Status
Pune Nashik Semi High-Speed Railway - India's First Semi High-Speed Railway Corridor
Просмотров 7182 года назад
Pune Nashik Semi High-Speed Railway - India's First Semi High-Speed Railway Corridor
Mega Projects That Will Change Thane Forever
Просмотров 3,9 тыс.2 года назад
Mega Projects That Will Change Thane Forever
Vasai Bhayander Bridge Project Details | Latest Update | Design | Progress | News | Current Status
Просмотров 11 тыс.2 года назад
Vasai Bhayander Bridge Project Details | Latest Update | Design | Progress | News | Current Status
Namma Metro Pink Line Project Details | Latest Update | Design | Progress | News | Current Status
Просмотров 3,5 тыс.2 года назад
Namma Metro Pink Line Project Details | Latest Update | Design | Progress | News | Current Status
Namma Metro Yellow Line Project Details | Latest Update | Design | Progress | News | Current Status
Просмотров 1,1 тыс.2 года назад
Namma Metro Yellow Line Project Details | Latest Update | Design | Progress | News | Current Status

Комментарии

  • @indianidol1977
    @indianidol1977 16 дней назад

    What’s the latest update on this project. When will it become operational. How many new locals are expected to be added

  • @Shree-ho6ws
    @Shree-ho6ws Месяц назад

    Please remove back ground music. It is distracting.

  • @Xryujfdjd
    @Xryujfdjd 2 месяца назад

    Not in my lifetime

  • @Dovreguben
    @Dovreguben 2 месяца назад

    I can drive to saltstraumen if i want it souldn’t be far from my home saltstraumen is in Norway right so i can driv there if i want

  • @rrarjun8
    @rrarjun8 2 месяца назад

    Why metro connectivity to Hosur?? There are a lot of areas that need to connect in Bengaluru only .. And also need to connect Tumkur or Chikabalpur.. Let the TN government consider Chennai Metro connectivity and second Airport to Sri city Andhra which is 70 km from Chennai city will they?? Let the TN government allow the Mekedatu project ..

  • @bagdilaljain725
    @bagdilaljain725 3 месяца назад

    Abhi Tak nahin chalu hai😂😂

  • @mrvcreations232
    @mrvcreations232 4 месяца назад

    The same information provided in BUDGET 2024 Today

  • @kanthamurugan6688
    @kanthamurugan6688 4 месяца назад

    Pendhar me flat hai.Bahut pareshan hu.Agar local train aayega ye sure hai? Tho rakhega nahi tho sell kardunga, aapko kuch malum hai kya?

  • @prithsss9721
    @prithsss9721 4 месяца назад

    On Saturday that's 13july 2024 pm Modi will do the bhoomi Puja for this project.

  • @craigwiester9177
    @craigwiester9177 4 месяца назад

    Thank you for pronouncing KILOmetres correctly!

  • @shaileshkallianpur2755
    @shaileshkallianpur2755 5 месяцев назад

    We are eagerly waiting for this bridge. This road bridge will definitely cut down the travel time. At present it takes to much time due concrete road work. Bhayander to Naigaon road bridge will be a Sanjeevani for people travelling by road from Vasai Virar region. Jai Hind Jai Maharashtra 🇮🇳

  • @SK-im6dm
    @SK-im6dm 6 месяцев назад

    फडणवीस साहेबांनी घोषणा केली आहे

  • @himowa3206
    @himowa3206 7 месяцев назад

    Please add tirupati too

  • @deepanjanchakravorty7771
    @deepanjanchakravorty7771 7 месяцев назад

    Shivaji nagar route is any way connected to sarjapur?

  • @t.hussain6278
    @t.hussain6278 7 месяцев назад

    👌🏾👌🏾

  • @prateikiscool
    @prateikiscool 8 месяцев назад

    The pronounciation is pathetic.

  • @ChiockenPlayzC
    @ChiockenPlayzC 8 месяцев назад

    Fact: bangalore metro motor sound is same as the Dubai metro motor sound

  • @ninja-xv5xg
    @ninja-xv5xg 9 месяцев назад

    Abhi tak nhi chslu hua 😂😂

  • @tejass4657
    @tejass4657 10 месяцев назад

    Tejas India templesmoves part time job integration inbenglore tonecity motor inbenglore tonecity integration making business development oftejas

    • @tejass4657
      @tejass4657 10 месяцев назад

      Tejas India templesmoves part time job integration inbenglore tonecity integration 0:14

  • @tejass4657
    @tejass4657 10 месяцев назад

    Tejas India templesmoves part time job integration

    • @tejass4657
      @tejass4657 10 месяцев назад

      Tejas India templesmoves part time job integration inbenglore tonecity integration 0:00

  • @milliefrye5747
    @milliefrye5747 10 месяцев назад

    Very impressive!

  • @TasmiyaSayyed-l5j
    @TasmiyaSayyed-l5j 11 месяцев назад

    Mi lhan pana padun eakato

  • @padmab.j6991
    @padmab.j6991 Год назад

    It go through sarjapura to attibele right or its move through chikkathirupathi and next hosur

  • @prabhakarbodas8712
    @prabhakarbodas8712 Год назад

    Good news

  • @prabhakarwadkar6665
    @prabhakarwadkar6665 Год назад

    वसई पनवेल, पनवेल वसई लोकल ट्रेन चालू करना चाहिए हर एक घंटे मे ,अब मेमो गाडी मे भिड बहोत होती है.

  • @Raj-xo9ws
    @Raj-xo9ws Год назад

    Foreigners ruined the Beaches by making it Bathing place and throwing Rubbish/Plastic into Sea Water...

  • @BalmukundSwarnkar
    @BalmukundSwarnkar Год назад

    Nice

  • @SoftwareDeveloperAspNet
    @SoftwareDeveloperAspNet Год назад

    Hope it gets completed asap. Waiting for this. Also the metro will be till alibag?

  • @gausmohammadshaikh3787
    @gausmohammadshaikh3787 Год назад

    What is the latest updates for constructions?

  • @Prathamesh1712
    @Prathamesh1712 Год назад

    Line 4 is not connected to line 1... Its necessary

  • @sarthakkharade7112
    @sarthakkharade7112 Год назад

    amazing video, really informative, cleared all the confusion i had about the different lines

  • @pratikhulawale3460
    @pratikhulawale3460 Год назад

    Any latest update on this project?

  • @vyankateshkolagal
    @vyankateshkolagal Год назад

    crossing road is problem

  • @jothivasu40
    @jothivasu40 Год назад

    Informativve Video. they can extend the project till Goa.

  • @vinayakjambhekar1339
    @vinayakjambhekar1339 Год назад

    pune indore pune express has already run via panvel. ....

  • @Abductor-tinboom
    @Abductor-tinboom Год назад

    Brian

  • @Anwari_khatun
    @Anwari_khatun Год назад

    Xinjiang ❤

  • @biplobchowdhury4482
    @biplobchowdhury4482 Год назад

    I knew that, Cox"s Bazar is the longest sea beach in the world. But, very sad. Now I have heard that, It is the second largest sea beach. 😢😢😢😢😢

  • @sannie104
    @sannie104 Год назад

    Can anyone tell me which projects are public sector undertaking ones?

  • @sunilmohandas912
    @sunilmohandas912 Год назад

    All cities have Ring Road except mumbai.

  • @ranjitbgmi2947
    @ranjitbgmi2947 Год назад

    Metro app neme pls

  • @vishwanathsanagoudar8438
    @vishwanathsanagoudar8438 Год назад

    Traffic has increased after this project

  • @javeednawaz2203
    @javeednawaz2203 Год назад

    Remove music. Bro... Lady voice .. is itself amazing..

  • @MariaDakkan-s3v
    @MariaDakkan-s3v Год назад

    Omg 🤯😮😢

  • @mohangohar7340
    @mohangohar7340 Год назад

    What is stopping the doubling KR single line is already saturated

  • @sunilmohandas912
    @sunilmohandas912 Год назад

    Will the worli connector be ready when mthl is ready ?

  • @uttambhanjebhanje8547
    @uttambhanjebhanje8547 Год назад

    Kalyan-Murbad-Ahmednagar-Beed-Parli Vaijanath-Udgir-Degloor-Bodhan-Nizamabad-Jagtiyal-Ramagund-Kirandul-Dantewada-Koraput-Vishakhapatnsm

  • @uttambhanjebhanje8547
    @uttambhanjebhanje8547 Год назад

    Surveyed by British and Nizam state Railway of Hyderabad before independent.this line connects Mumbai to Vishakhapranam and Mumbai to Calcutta.and Vishakhapranam to Ratnagiri and Ratnagiri to Calcutta by nearest distance.

  • @uttambhanjebhanje8547
    @uttambhanjebhanje8547 Год назад

    Kalyan-Murbad-Ahmednagar-Beed-Parli Vaijanath-Udgir-Degloor-Bodhan-Nizamabad-Jagtiyal-Ramagund-Kirandul-Dantewada-Koraput-Vishakhapatnsm

  • @francescos7361
    @francescos7361 Год назад

    As airpor desiner I appreciate his