Fire alarm Status in Pelican Wireless
I show you the components needed to add a fire alarm notification to Pelican Wireless.
Просмотров: 194

Видео

Stuck Open Damper Trend Data
Просмотров 403 месяца назад
I show you how to spot a stuck open damper in the trend log.
Static Pressure Probe Problem Trend Data
Просмотров 313 месяца назад
Poor static pressure readings in the trend log.
Heat call, but Boiler Off Trend Data
Просмотров 223 месяца назад
What the trend log looks like when the hot water valve is open, but the boiler is off.
Chilled water valve stuck open Trend Data
Просмотров 313 месяца назад
I show you how to spot a stuck open chilled water valve.
Bad Temp Sensor Trend Data
Просмотров 343 месяца назад
Lets see what a bad temp sensor reading looks like in a trend log.
Backwards Damper Trend Data
Просмотров 273 месяца назад
I show you how to spot a reverse acting VAV damper in trend logs.
Floating or Modulating?
Просмотров 4843 месяца назад
A modulating actuator was wired as floating and was creating a short circuit. After installing a new transformer I reduced the circuit until I found the short. I installed a Pelican Pearl to control both of the modulating actuators on the unit.
Pelican Trend Log Data Analysis
Просмотров 513 месяца назад
Backwards dampers, stuck open dampers, bad static pressure probe placement, bad controller configuration, and bad sensors. We will look at all these things and more in Pelican trend log data!
Lennox Prodigy M2 Econ Checkout
Просмотров 2063 месяца назад
I show how to test and configure the economizer on a Prodigy M2 unit.
Differential Pressure Sensor Install
Просмотров 4443 месяца назад
I show how to install a Veris Industries differential pressure transducer.
Pelican PM5 for Central Plant Control
Просмотров 1463 месяца назад
I install a Pelican PM5 to get control of a chiller, boiler, and their pumps. We had to install a transformer, 4 relays, and run conduit outside. The chiller and boiler were both enabled by their flow switches anytime the pumps would run, but we separated them so we can run the pumps by themselves if needed for freeze protection.
AAON Economizer Enthalpy to Dry bulb Conversion
Просмотров 6313 месяца назад
Enthalpy sensors are unreliable after the first few years of their life. We would much rather use a dry bulb sensor to control an economizer. I'll show you a way to do that on an older AAON unit without needing to buy any parts.
Heat Reclamation
Просмотров 2404 месяца назад
Heat absorbed from one part of the building is used to warm another part of the building, using this heat reclamation process.
Electric Boiler Control
Просмотров 894 месяца назад
The Electric Boiler is running wild. Let's add an enable relay.
VFD Alarm Troubleshooting
Просмотров 4504 месяца назад
VFD Alarm Troubleshooting
Short Circuit
Просмотров 1194 месяца назад
Short Circuit
Multitap Transformer Over Voltage
Просмотров 1115 месяцев назад
Multitap Transformer Over Voltage
Inlet Vanes To VFD Conversion
Просмотров 4765 месяцев назад
Inlet Vanes To VFD Conversion
Compressors Never Shut Off
Просмотров 7636 месяцев назад
Compressors Never Shut Off
Chiller Power Issue
Просмотров 3816 месяцев назад
Chiller Power Issue
Chiller Flow Alarm
Просмотров 6817 месяцев назад
Chiller Flow Alarm
Belimo Globe Valve Retrofit
Просмотров 2137 месяцев назад
Belimo Globe Valve Retrofit
Red Wire Relays
Просмотров 1,1 тыс.7 месяцев назад
Red Wire Relays
Central Plant Takeover
Просмотров 3,5 тыс.7 месяцев назад
Central Plant Takeover
VFD Commisioning
Просмотров 1,9 тыс.8 месяцев назад
VFD Commisioning
Thermostat on Electric Unit Heater
Просмотров 2729 месяцев назад
Thermostat on Electric Unit Heater
Wire Pull Technique
Просмотров 6979 месяцев назад
Wire Pull Technique
Boiler Enable Relay
Просмотров 2899 месяцев назад
Boiler Enable Relay
Stepdown Transformer Install
Просмотров 1,3 тыс.9 месяцев назад
Stepdown Transformer Install

Комментарии

  • @billysimmons2432
    @billysimmons2432 Месяц назад

    on the new hardware m2, can you disable the econ, got one 2011 unit that someone panned over the econ and disconnected the 15 pin harness, gives me error 150 - change enthalpy settings. figured i need to change the cooling modes to not allow for free cooling or disable the econ. just learning these prodigy controls

    • @building-automation
      @building-automation Месяц назад

      @@billysimmons2432 I'm sure you can. I bet it's just in the econ menu.

    • @billysimmons2432
      @billysimmons2432 Месяц назад

      @ got it sorted it out with tech support. Thank you

  • @thinguyen4757
    @thinguyen4757 2 месяца назад

    Thank you for the tutorial

  • @desieranks
    @desieranks 2 месяца назад

    What are those jumpers for

    • @building-automation
      @building-automation 2 месяца назад

      @desieranks sometimes the fire alarm, or high static pressure safety will be wired to DI4 but in this case those safeties are wired in series with the fan start/stop signal so a jumper is needed on DI4. The input numbers are programmable and can change, but that's the basic idea. A jumper will be put in place if the safeties are wired in somewhere else.

  • @Veb2
    @Veb2 3 месяца назад

    Great teacher

  • @GlenS123
    @GlenS123 3 месяца назад

    At leastI'm not the only one who actually reads the directions, used to find this stuff quite often.

  • @AnthonyRodriguez-ir4ce
    @AnthonyRodriguez-ir4ce 3 месяца назад

    Thanks for the video definitely would like to see some videos on some of the newer AAON. This helped out a lot

    • @building-automation
      @building-automation 3 месяца назад

      I'll have to get out my camera next time I use the WattMaster!

  • @maheradous9257
    @maheradous9257 3 месяца назад

    Good job

  • @jasonjohnsonHVAC
    @jasonjohnsonHVAC 3 месяца назад

    I love keeping things simple and mechanical....i don't need a laptop, access to software or have to pull points, write code etc etc....and it works just fine. Old school was just fine....now everything is digital or analog. All for a false sense of "efficency"

  • @orlylandy
    @orlylandy 3 месяца назад

    Nice video, keep it up.

  • @Jeff-zk1sy
    @Jeff-zk1sy 3 месяца назад

    Great stuff

  • @kcomfortsystemshvac7060
    @kcomfortsystemshvac7060 3 месяца назад

    Hi ,,,nice information,,,,,,,intrestring ,,,,,,,I have little question,,,, 10 and 1 ,,,,are the switch,,,.?

    • @building-automation
      @building-automation 3 месяца назад

      @kcomfortsystemshvac7060 terminal 10 is the power supply, putting out 25vdc. Terminal 1 is the input that receives the signal back from the dry contact out the start/stop relay.

  • @SamMcWhannel
    @SamMcWhannel 4 месяца назад

    I'm just north of Washington in BC and I see these systems on pretty much every new construction institutional building (school, rec centre, hospital, etc). Although typically they pipe the chiller condenser directly to the building heating loop as the new construction buildings usually use low temperature hot water systems which allow the chiller and boiler to run together. The boiler is usually downstream of the condenser in the heating system so it can top it up when heating demands are higher and cooling demands lower.

  • @Magneticitist
    @Magneticitist 4 месяца назад

    It's almost like someone else got confused over Sink and Source about halfway through the relay wiring.

  • @jesusmedina7780
    @jesusmedina7780 4 месяца назад

    Great video! It’s really helpful to see how these devices are installed and wired in the field. Thank you for sharing.

  • @danieltolfo9332
    @danieltolfo9332 4 месяца назад

    Hi this video is what I needed out on the field. Quick question.. does the 25v gets generated from the vfd or it's coming off the rib relay? Thanks.

    • @christopherlalla4894
      @christopherlalla4894 4 месяца назад

      Vfd the relay is a dry set of contacts

    • @danieltolfo9332
      @danieltolfo9332 4 месяца назад

      @@christopherlalla4894 are the dry set getting command from bas to enable the vfd? do you wire the cube relay in series with the end switches?

    • @building-automation
      @building-automation 4 месяца назад

      @@danieltolfo9332 The 25VDC is generated in the VFD on terminals 9, and 10. The Rib relay and the safety devices are all just dry contacts that allow the 25VDC to come back to the VFD terminal 1, which is configured as the "run enable" input. In this instance there is an added layer of complexity because the "Ice Cube" relays are energized by the safeties and break the 25VDC circuit on behalf of the safeties. Its kind of rare to see that setup. Most of the time the safeties break the 25VDC circuit themselves.

    • @danieltolfo9332
      @danieltolfo9332 4 месяца назад

      @@building-automation wires that come off the safety would to direct to the coil of relay? How would the other wires be relative to vfd?

    • @building-automation
      @building-automation 4 месяца назад

      @danieltolfo9332 yes, the wires from the safeties control the coils of the relays. The 25vdc is run through each relay on the contact side. Normally open and common.

  • @mattd3416
    @mattd3416 4 месяца назад

    Thank you for posting videos. It is great to see how you diagnose a problem and explain your thought process.

  • @Reefertech
    @Reefertech 5 месяцев назад

    Your content Is underrated.

  • @ThtdripGaming
    @ThtdripGaming 5 месяцев назад

    What ohm tester is that

    • @building-automation
      @building-automation 4 месяца назад

      @@ThtdripGaming I built that resistor bank, but you can use a 30k ohm potentiometer to do the same thing.

  • @benahmedahmed831
    @benahmedahmed831 5 месяцев назад

    Perblam E2 model TRANE termosta SERVICE FIRST SENO 1577 Trane Rooftop

  • @benahmedahmed831
    @benahmedahmed831 5 месяцев назад

    Perblam E2 model TRANE termosta SERVICE FIRST SENO 1577 Trane Rooftop

  • @ZRock7771
    @ZRock7771 5 месяцев назад

    Good troubleshooting, very informative and to the point.

  • @WillLindsey-i3z
    @WillLindsey-i3z 5 месяцев назад

    You really know your stuff. Videos are always helpful and very informative. Thanks for making these!

  • @jasonjohnsonHVAC
    @jasonjohnsonHVAC 5 месяцев назад

    A few months ago I ran into a McQuay SWP with the factory inlet guide vanes. The microtech 1 board was not sending the 12v to the on board relay the closed the contacts to give it 24v to close. It had an old belimo with a potentiometer for feedback to the board. It got quoted to add a drive to it and lock the vanes open

  • @jasonblake97
    @jasonblake97 5 месяцев назад

    Exactly what I was looking for. Thanks.

  • @CedLeeFitness
    @CedLeeFitness 6 месяцев назад

    Great job

  • @willpa9778
    @willpa9778 6 месяцев назад

    Bad practice, if one phase has blown you should always replace other two phases as they will have been put under load. This could explain why fuses keep tripping. 😊

    • @patricklegault6383
      @patricklegault6383 6 месяцев назад

      not sure if you noticed... the blown fuse was on a 120v while the other 2 are on 208. it's not part of the phase but post transformer and they used a triple fuse block instead of a double + single

  • @MrRantWhy
    @MrRantWhy 6 месяцев назад

    And now we need to find out why there needs to be a box of fuses and what is cousing the fuse to blow. Thats the video i want to see.

  • @GrimmGX21
    @GrimmGX21 6 месяцев назад

    Thank you

  • @lance16O1
    @lance16O1 6 месяцев назад

    Until the pump coupler fails and you're not moving water and you have a false status but I'll stop. Thank you for your videos.

  • @pinolanuts69
    @pinolanuts69 6 месяцев назад

    I'm not super familiar with power supplies....do they allow you to vary the output DC voltage?

  • @P0nderProductions
    @P0nderProductions 7 месяцев назад

    Fuck York

  • @sergioramirez9025
    @sergioramirez9025 7 месяцев назад

    Sir where can I buy that bank box

  • @jasonjohnsonHVAC
    @jasonjohnsonHVAC 7 месяцев назад

    I used those before. Its a fairly easy kit to use. Thanks for the video

  • @AmauryJacquot
    @AmauryJacquot 7 месяцев назад

    now the question... why change the controller ? the original one stopped working ?

  • @qomco
    @qomco 7 месяцев назад

    Nice work

  • @glennmcgurrin8397
    @glennmcgurrin8397 7 месяцев назад

    You may already know this, but if you are going to put in a switch, talk to IT about that, sometimes our switches will ge configured to only allow one device per port, you plug that switch in and two devices and it will either only allow the first or will shutdown the port entirely. They may also prefer to provide a switch to keep certain management and diagnostic functions available. Even if the port protection features to block unauthorized switches are not in use, it may still create headaches later when doing diagnostics or troubleshooting, IT generally wants to know what and where all the switches are and it's not just a power or control thing, it helps us do our job better, also in some compliance things we may need to know everything on the network.

    • @JohnnyJr396
      @JohnnyJr396 7 месяцев назад

      Some controllers provide a secondary network isolated from the primary. Just asking, how can a switch or any hardwired devices on secondary affect anything on the primary?

    • @building-automation
      @building-automation 7 месяцев назад

      Great advice, thanks!

  • @HEFTYLEFTY303
    @HEFTYLEFTY303 7 месяцев назад

    You can put that chiller in local mode so you can start stop right off the ov

  • @sircampbell1249
    @sircampbell1249 7 месяцев назад

    What are you hiding in video ?

  • @bills6946
    @bills6946 7 месяцев назад

    The common on the relay that you called the lever, is the armature.

    • @building-automation
      @building-automation 7 месяцев назад

      Yes! That was on the tip of my tongue while recording. Thanks Bill.

  • @MrArfcom
    @MrArfcom 7 месяцев назад

    resistors on wire nuts? be neat and put them on the terminal...

  • @qomco
    @qomco 7 месяцев назад

    Years of experience to see this one so quickly. Your videos are priceless!

    • @building-automation
      @building-automation 7 месяцев назад

      You just made my day.

    • @qomco
      @qomco 7 месяцев назад

      ​@@building-automationim glad to hear that!! Out of curiosity, do you work for an hvac contractor or are you purely in controls?

    • @building-automation
      @building-automation 7 месяцев назад

      @@qomco Mostly controls work, although we are licensed to do mechanical work as well.

  • @EverythingHVACR
    @EverythingHVACR 7 месяцев назад

    Interesting stuff, Nicely done.

  • @kelseyw4283
    @kelseyw4283 7 месяцев назад

    First!

  • @hvacman954
    @hvacman954 7 месяцев назад

    Keep these video coming.

    • @building-automation
      @building-automation 7 месяцев назад

      I'm glad you are getting something good out of them!

  • @jasonjohnsonHVAC
    @jasonjohnsonHVAC 8 месяцев назад

    Those YK chillers need a start pulse and a stop pulse. Its a more of a latching switch type of action. You can add a start/stop relay...give it a run command and then pull the relay and it'll still run.

    • @building-automation
      @building-automation 7 месяцев назад

      Yes, I noticed that. I had to use a N.O/N.C relay. Normally open calls it on, and normally closed calls it off.

    • @building-automation
      @building-automation 7 месяцев назад

      Very interesting. That's the first time I've seen that setup on a chiller.

  • @sschueller
    @sschueller 8 месяцев назад

    Wow, documentation. I wish that was always the case...

    • @building-automation
      @building-automation 8 месяцев назад

      Yeah, it's pretty rough when there's no points list, and we don't have access to the existing B.A.S.

    • @andrewamaya8109
      @andrewamaya8109 8 месяцев назад

      What do you do when it’s not there

    • @building-automation
      @building-automation 7 месяцев назад

      @@andrewamaya8109 There are a few tricks you can do. Start by doing a walk through of the facility and take note of where all the devices are(pumps, chillers, boilers, ect.) Then take a good look at the controller and identify the different types of inputs and outputs. For the outputs you can use your meter to determine the different signal types being sent to get an idea of what they might control. For the inputs you might see a resistor in parallel which would indicate a 4-20mA sensor. Then trace some of the wires out of the control box and see which direction they go. If you're lucky you'll see conduits going in a direction of a group of devices like over toward all the pumps for instance. Once you have an understanding of the general layout and the signal types being sent you could begin pulling one output wire at a time from the controller and see what turns off. It would be a good idea to shutdown the chillers before you start pulling wires. If you kill a pump, or shut an isolation valve while the chiller is running you could send it into alarm or worse. Its also nice to shut everything down so its quiet and you can hear valve actuators move, or contactors pull in. If you are going to jump voltage to bring on a binary output you had better know what you are doing, it would be easy to damage components if you make a mistake.

  • @Jeff-zk1sy
    @Jeff-zk1sy 8 месяцев назад

    Wow. It’s like this guy knows his stuff. What a pro

  • @ayoutubewatcher7009
    @ayoutubewatcher7009 8 месяцев назад

    Why did you cut the wires 🫤

    • @building-automation
      @building-automation 7 месяцев назад

      I was simulating an outside air temperature so I could observe the economizer logic in action, but yes i suppose I could have put my resistor where the outside air temperature sensor connects to those wires by just unplugging the sensor and putting the resistor in place. It would have been cleaner that way.

  • @dillonreynolds2095
    @dillonreynolds2095 8 месяцев назад

    This video saved my life and my job 🙏🏼

  • @sergioramirez9025
    @sergioramirez9025 8 месяцев назад

    Sir where do you get that ohm box???

    • @building-automation
      @building-automation 7 месяцев назад

      I built it, but you can just order a 30k ohm potentiometer.

    • @sergioramirez9025
      @sergioramirez9025 3 месяца назад

      ​@building-automation brother how much? I'll buy one from you.