Rosenberger Construction
Rosenberger Construction
  • Видео 12
  • Просмотров 9 743
First Slab Pour at East Belt Logistics
Check out this amazing drone video of our first slab pour at East Belt Logistics in Houston, Texas!
Просмотров: 161

Видео

Walls are up at Denton 35 Exchange
Просмотров 942 месяца назад
The walls are up in Denton, Texas at Denton 35 Exchange! Steel erection is ongoing at Building 1, followed by roofing in a few weeks. Panel erection for Building 2 starts next week!
EAST BELT LOGISTICS PARK
Просмотров 1023 месяца назад
EAST BELT LOGISTICS PARK Rosenberger Construction is working on a new project in Houston, East Belt Logistics Park. This project consists of two (2) tiltwall, cross-dock, warehouse buildings totaling 858,600 square feet. Building 1 totals 591,560 square feet with a 40’ clear height and Building 2 totals 267,040 square feet with a 36’ clear height. Stay tuned for more updates on our progress of ...
Constellation Eldridge Demolition
Просмотров 2025 месяцев назад
Rosenberger Construction recently began demolition on the future build site for Constellation Eldridge, a 537,375 square-foot cross-dock shell tiltwall building with 40’ clear heights and an ESFR sprinkler system. This industrial project is scheduled for completion first quarter of 2025.
Fort Bend Southwest Logistics Center
Просмотров 3111 месяцев назад
Check out this drone video of Fort Bend Southwest Logistics Center in Missouri City, TX!
Completed Slab Pour at Post Oak in Houston, TX
Просмотров 3011 месяцев назад
Completed Slab Pour at Post Oak in Houston, TX
Lakeside 130 Panel Erection in Pflugerville, TX
Просмотров 1611 месяцев назад
Lakeside 130 Panel Erection in Pflugerville, TX
CONSTELLATION TRADE CENTER
Просмотров 16Год назад
CONSTELLATION TRADE CENTER Drone video for March 2023
Constellation Trade Center - February 2023 Site Visit
Просмотров 17Год назад
Check out this great drone video of Constellation Trade Center at our last site visit!
Oakmont Loop 410 - San Antonio, TX
Просмотров 19Год назад
Rosenberger is making progress out at Oakmont Loop 410 in San Antonio, TX! #rosenbergerconstruction
Seton Lake Logistics Center
Просмотров 512 года назад
The TCC Seton Lake project is currently in the finishing stages. The exterior paint is being touched up, the site sidewalks are in progress and the irrigation system is being installed in preparation for the landscaping. The canopies are in progress and the glass storefronts are finishing up as well. The building shell is on track to finish ahead of schedule at the end of October. The office de...