- Видео 23
- Просмотров 206 064
Fred. Olsen Windcarrier
Добавлен 20 мар 2015
Fred. Olsen Windcarrier on Moray East Offshore Wind Farm
14 September 2021, Fred. Olsen Windcarrier's installation vessel Blue Tern installed the last of 100 turbines on Moray East offshore wind farm well ahead of schedule. Moray East is Scotland's largest offshore windfarm to date with 100 V164-9.5 turbines.
Bold Tern installed the first turbines on Moray East in January 2021 but was later replaced by Blue Tern to undergo a scheduled crane upgrade. A carefully planned vessel substitution was successfully carried out in May where Blue Tern was delivered fully loaded on the Moray East site. The overlap helped to improve the project schedule.
Read more here: windcarrier.com/track-record/case-studies/moray-east/
Bold Tern installed the first turbines on Moray East in January 2021 but was later replaced by Blue Tern to undergo a scheduled crane upgrade. A carefully planned vessel substitution was successfully carried out in May where Blue Tern was delivered fully loaded on the Moray East site. The overlap helped to improve the project schedule.
Read more here: windcarrier.com/track-record/case-studies/moray-east/
Просмотров: 3 488
Видео
Timelapse of installations on Moray East offshore wind project
Просмотров 6812 года назад
In 2021, Fred. Olsen Windcarrier installed 100 V164-9.5 turbines on Moray East - Scotland's largest offshore windfarm to date. Bold Tern installed the first turbines on Moray East in January 2021 but was later replaced by Blue Tern to undergo a scheduled crane upgrade. A carefully planned vessel substitution was successfully carried out in May where Blue Tern was delivered fully loaded on the M...
Brave Tern - voyage from Esbjerg, Denmark to Taiwan.
Просмотров 2,7 тыс.4 года назад
Jack-up vessel Brave Tern left Esbjerg, Denmark in April 2020 for Taiwan to do transport and installation jobs on offshore windfarms.
Procurement - local content Taiwan
Просмотров 3394 года назад
Michael Aasted from Procurement talks about how to become a vendor for Fred. Olsen Windcarrier. The film is with Chinese subtitles and made for the Asian market.
Rune Tronsgaard on operational expectations for Taiwan
Просмотров 1,4 тыс.4 года назад
The Master on Brave Tern, Rune Tronsgaard, tells about his expectations for the projects in Taiwan.
Axel Wullf Wathne on soil conditions in Taiwan
Просмотров 6204 года назад
Axel Wullf Wathne, Lead Engineer at Fred. Olsen Windcarrier, talks about soil conditions and other technical challenges in Taiwan.
Hornsea One project film
Просмотров 8 тыс.4 года назад
In close collaboration with Ørsted and Siemens Gamesa Renewables, Fred. Olsen Windcarrier's Bold Tern installed 91 SWT-7.0-154 turbines out of 174 on the world's largest offshore wind farm; Hornsea One. The wind farm is capable of powering well over one million UK homes.
Alexandra Koefoed on the market in Taiwan
Просмотров 1,2 тыс.5 лет назад
Managing Director at Fred. Olsen Windcarrier, Alexandra Koefoed, talks about the new offshore wind market in Taiwan.
Hans Hansen on operational challenges in Taiwan
Просмотров 4215 лет назад
Regional Manager for Asia, Hans Hansen, talks about the operational challenges he expects in Taiwan
Liftboat Jill in Europe
Просмотров 3,2 тыс.5 лет назад
Liftboat Jill arrives in Rotterdam after having crossed the Atlantic on top of heavy lift vessel Hua Sheng Long. See the float-off and learn more about our new O&M vessel Jill.
Merkur time lapse
Просмотров 2 тыс.5 лет назад
Part of Blue Tern's (previously Seafox 5) track record was the transport and installion of 66 x GE-Alstom Haliade 6MW wind turbines - 4 turbines per load at Merkur Offshore Wind Farm. This timelapse shows a load-out of two turbines.
Blue Tern Name Change Animation
Просмотров 6215 лет назад
An animation showing Seafox 5 becoming Blue Tern
Upgrades on Brave Tern and Bold Tern
Просмотров 5 тыс.6 лет назад
Fred. Olsen Windcarrier’s jack-up vessels Brave Tern and Bold Tern are among the most versatile and efficient installation and service vessels in the offshore wind industry - capable of installing today's largest turbines. This requires continuous upgrades as the offshore wind business moves fast. The video shows the upgrades we have made to ensure that we can install the turbines on the market...
Fred. Olsen Windcarrier working on Borkum Riffgrund 2
Просмотров 4 тыс.6 лет назад
Check out this film on how Fred. Olsen Windcarrier in close collaboration with MHI Vestas and Ørsted installed 56 V164-8.0MW turbines offshore on Borkum Riffgrund 2 in Germany - well ahead of schedule
Timelapse from Borkum Riffgrund 2 - Bold Tern
Просмотров 6 тыс.6 лет назад
This timelapse shows Bold Tern installing one of 56 V164-8.0 MW turbines on Borkum Riffgrund 2. The 8MW turbine is the largest turbine to date in the German North Sea.
Wikinger Offshore Wind Farm Installation - short
Просмотров 3,4 тыс.6 лет назад
Wikinger Offshore Wind Farm Installation - short
Wikinger Offshore Wind Farm Installation - Full Length
Просмотров 121 тыс.6 лет назад
Wikinger Offshore Wind Farm Installation - Full Length
Belwind Alstom Haliade demonstrator
Просмотров 2,4 тыс.9 лет назад
Belwind Alstom Haliade demonstrator
On Board Fred. Olsen Windcarrier's the Brave Tern
Просмотров 17 тыс.9 лет назад
On Board Fred. Olsen Windcarrier's the Brave Tern