- Видео 11
- Просмотров 18 581
Environmental Excavation LLC
Добавлен 6 окт 2011
Specialized equipment for solving complicated water and land management projects
Clear Fork Fish Barrier : III Final
Trout Unlimited Fish barrier installed to protect native Cutthroat trout species in Western Colorado. A gabion rock structure was removed and an Armor -Flex concrete mattress was installed for the Gunnison National Forest Ranger District.
Просмотров: 621
Видео
Beaver Dam Removal and minor repairs to ditch bank
Просмотров 2,1 тыс.21 час назад
35G excavator, Removing a beaver dam in late November, in a remote canal in Colorado.
Culvert Collapse during spring runoff/mitigation
Просмотров 1,1 тыс.21 час назад
Tearing out 14' culvert pipe over Memorial day weekend 2024 in Dutch Creek, Redstone,CO pre-spring runoff. John Deere Excavators/ Engcon tiltrotator/ Komatsu Loader work performed by Environmental Excavation L.L.C.
Ponds, Augmentation Environmental Excavation
Просмотров 204День назад
Ponds were constructed for ranchers and related property owners to augment, waters of the state. HDPE welded lined ponds, Agri-Drain water leveling device installed with John Deere Excavators, and Engcon titlt-rotator
Clear Fork Fish Barrier: Part II
Просмотров 24610 месяцев назад
Excavation and concrete footprint for the start of the fish barrier project. Equipment: John Deere excavators 210G, 135G, 35G, 624P TopCon GPS, Engcon tiltrotator
Introduction to Environmental Excavation
Просмотров 22111 месяцев назад
River restoration and Bank stabilization environmentalexcavationllc.com/
Post Flood River Project 2015
Просмотров 1899 лет назад
Building a multi-use river structure that serves anglers, white water enthusiast, and agriculture. A post flood project completed in the spring of 2015 Environmental Excavation L.L.C.
😢
I would replace that culvert; at best, it's a temporary solution. If you look at the final project, it is bent to one side. Weight distribution is now not what it should be, etc. etc
What an amazing resoration / remediation