Mumbai Metro Rail Corporation - MumbaiMetro3
Mumbai Metro Rail Corporation - MumbaiMetro3
  • Видео 114
  • Просмотров 1 168 596
Proud Moment! PM hails woman power leading various govt. depts including MD, MMRC Ms Ashwini Bhide.
Proud Moment!
Prime Minister @NarendraModi while addressing foundation ceremony of Vadhavan port hails Woman power leading various Government departments including Managing Director of MMRC Ms Ashwini Bhide.
#NariShakti #IndiaRising #WomenEmpowernment
Просмотров: 1 133

Видео

Latest visuals of SEEPZ metro station of Mumbai Metro Line 3
Просмотров 23 тыс.2 месяца назад
🔸#SEEPZ station is built beneath MIDC Central Road and situated in a special economic zone. Presently, the locality is mainly served by metro one and BEST for transit to the #Mumbaikars🚇 🔸 #MetroLine3 corridor will be providing east-west and north-south connectivity in the locality boosting business growth and opportunities for businessman and traders. Also, ease the commuting woes to the nearb...
Latest visuals of Marol Naka metro station of Mumbai Metro Line 3
Просмотров 15 тыс.2 месяца назад
Latest visuals of Marol Naka metro station of Mumbai Metro Line 3
#Metro3 RDSO train trials completed!
Просмотров 11 тыс.4 месяца назад
#MMRC has successfully completed Research Designs and Standards Organisation #RDSO trials of Rolling Stock for #MetroLine3. Testing of other electrical systems and integrated testing of Rolling Stock with signaling is in progress. After completion of testing, the Commissioner of Metro Rail Safety (CMRS) will be invited. #MetroUpdates #TrialRuns #AquaLine #MumbaiUnderground
Integrated trial runs for Metro Line-3 from Aarey To BKC
Просмотров 58 тыс.7 месяцев назад
Integrated trial runs for #Metro3 has been commenced. Various systems like rolling stock (coach), signal telecommunications, tracks traction etc., are being validated during the trial runs which is being carried out between #BKC to #Aarey After completion of trials and certifications of individual systems and certificate from Independent Safety Accessor (ISA), the system shall be offered for in...
It has been a truly eventful & rewarding year for MMRC. Catch a glimpse of the highlights of 2023
Просмотров 7 тыс.10 месяцев назад
It has been a truly eventful and rewarding year for MMRC. Catch a glimpse of all the highlights of 2023 here. #ConnectingtheUnconnected #2023Highlights #Aqualine #MumbaiUnderground#ConnectingtheUnconnected #2023Highlights #Aqualine #MumbaiUnderground
Mahalaxmi Metro Station Construction & Benefits
Просмотров 9 тыс.11 месяцев назад
Explore the significance of #Mahalaxmi Metro Station in Mumbai's transportation system! Discover how this station connects key areas, including the monorail, Western Railway, and Central Line. Learn about the challenges faced during construction and the benefits it brings to commuters, tourists, and the city's growth. Watch now to see how Mahalaxmi Metro Station is transforming Mumbai's travel ...
9 Trains Ready for Mumbai Metro 3 Phase 1 Launch!
Просмотров 14 тыс.11 месяцев назад
With successful arrival of the 9th train the required number of trains for the #Aqualine Phase 1 operations is now met. All the trains are assembled and kept ready at the #AareyCarDepot
Station Challenges - #MarolNaka Metro Station
Просмотров 6 тыс.Год назад
Marol Naka Metro Station near Andheri station is set to revolutionize Mumbai's transportation network. Despite challenges, like narrow station boxes and hard rock excavation, the MMRC team is making rapid progress. Once complete, it'll be a seamless hub for Mumbai City commuters!
Handling Construction Challenges - Dadar Metro Station
Просмотров 6 тыс.Год назад
Dadar Metro Station, a critical project for #Metro3 had to face formidable challenges, ranging from relocating shops to efficiently managing traffic. But careful planning and transparent communication ensured these obstacles were successfully overcome. Minimal disruption for both local businesses and residents, was ensured through measures like effective noise control and vigilant building surv...
Challenges Of Santacruz Metro Station
Просмотров 10 тыс.Год назад
The construction of #SantaCruz Metro Station had it's own set of challenges considering its location. This task was handled by blending cut and cover with NATM methods. Built amidst a flyover and slums, it seamlessly integrates modern infrastructure with urban needs, minimizing disruptions. A remarkable feat in a bustling city! #MumbaiMetro #UrbanInnovation #MumbaiUnderground
Metro 3 Sariput Nagar Substation - India's 1st IGBC Platinum rated electric receiving sub station
Просмотров 2,3 тыс.Год назад
#Metro3 Sariput Nagar substation became India's first IGBC platinum rated electric receiving sub station in metro sector under service building category. Sustainable architecture & design, energy efficiency, water conservation, use of solar energy were some key parameters that were considered while awarding the platinum rating.
Latest Update On Aarey Depot's Progress
Просмотров 10 тыс.Год назад
#Aarey car depot of #MetroLine-3 is shaping up rapidly. Here is an update about the progress made at the depot site. #Metro3in2023 #Aqualine #MumbaiUnderground
His Excellency Mr. Hiroshi Suzuki, Ambassador Extraordinary Visits Metro 3 BKC Station
Просмотров 4,4 тыс.Год назад
His Excellency Mr. Hiroshi Suzuki, Ambassador Extraordinary Visits Metro 3 BKC Station
What's a Crossover in Underground Metro? Know more about it and where are these in Metro3
Просмотров 3,8 тыс.Год назад
What's a Crossover in Underground Metro? Know more about it and where are these in Metro3
The Underground Journey of Mumbai Metro 3's MIDC, SEEPZ & Marol Naka Stations
Просмотров 12 тыс.Год назад
The Underground Journey of Mumbai Metro 3's MIDC, SEEPZ & Marol Naka Stations
Hon CM Shri Eknath Shinde Visits Churchgate & Vidhan Bhavan Metro3 Stations
Просмотров 10 тыс.Год назад
Hon CM Shri Eknath Shinde Visits Churchgate & Vidhan Bhavan Metro3 Stations
Mumbai Metro-3 Train arrival at Aarey Car Depot
Просмотров 18 тыс.Год назад
Mumbai Metro-3 Train arrival at Aarey Car Depot
#Aarey car depot of #MetroLine-3 is shaping up rapidly. Catch a glimpse of it's progress here.
Просмотров 61 тыс.Год назад
#Aarey car depot of #MetroLine-3 is shaping up rapidly. Catch a glimpse of it's progress here.
Backfilling work has begun at most stations of #MML-3
Просмотров 22 тыс.Год назад
Backfilling work has begun at most stations of #MML-3
Come along for a visual ride through tunnels and underground stations of package 6
Просмотров 4,5 тыс.Год назад
Come along for a visual ride through tunnels and underground stations of package 6
NCPA inaugurates its renovated 'Dilip Piramal Art Gallery' with a photo exhibition on Metro Line-3
Просмотров 1,2 тыс.Год назад
NCPA inaugurates its renovated 'Dilip Piramal Art Gallery' with a photo exhibition on Metro Line-3
Escalators in Aqua Line #MumbaiMetroLine3 #Line3in2023 #MumbaiUnderground
Просмотров 14 тыс.Год назад
Escalators in Aqua Line #MumbaiMetroLine3 #Line3in2023 #MumbaiUnderground
Experience the journey through tunnels & underground stations from #Dharavi to #Santacruz
Просмотров 6 тыс.Год назад
Experience the journey through tunnels & underground stations from #Dharavi to #Santacruz
MMRC initiated the In-situ plantation of fully grown trees at SEEPZ metro station.
Просмотров 1,4 тыс.Год назад
MMRC initiated the In-situ plantation of fully grown trees at SEEPZ metro station.
Glimpses of site visit of MD, MMRC along with senior officials at MIDC & SEEPZ stations
Просмотров 6 тыс.Год назад
Glimpses of site visit of MD, MMRC along with senior officials at MIDC & SEEPZ stations
Metro Line-3 is Mumbai's first fully underground metro using full height Platform Screen Doors.
Просмотров 11 тыс.Год назад
Metro Line-3 is Mumbai's first fully underground metro using full height Platform Screen Doors.
It has been an eventful year for us at #MMRC. Have a look at the milestones achieved in 2022.
Просмотров 4,3 тыс.Год назад
It has been an eventful year for us at #MMRC. Have a look at the milestones achieved in 2022.
Trial Runs of Mumbai Metro Line-3
Просмотров 13 тыс.Год назад
Trial Runs of Mumbai Metro Line-3
CSMIA T1 metro station of #MML3 has completed 88% of its overall civil work and 52% of system work.
Просмотров 15 тыс.2 года назад
CSMIA T1 metro station of #MML3 has completed 88% of its overall civil work and 52% of system work.

Комментарии

  • @sunilmohandas912
    @sunilmohandas912 18 дней назад

    Is airport T1 and T2 metro station below the terminal bldg like abroad ?

  • @sunilpawar-rp5js
    @sunilpawar-rp5js Месяц назад

    Please give job opportunity for engineers like me in Mumbai metro

  • @Skull_Editz25
    @Skull_Editz25 Месяц назад

    When will the aqua line be finished? Its ok if the date isnt accurate

  • @mandartamore9607
    @mandartamore9607 Месяц назад

    Jai Hind Make Mumbai Pune Rapido Railway

  • @randomclips5540
    @randomclips5540 Месяц назад

    Corrupt government

  • @AKSImakesbeat
    @AKSImakesbeat Месяц назад

    Phele ke 6 mahine nhi jaaneka, malum padha upar ki jhatt hi gir gai

  • @newbie8051
    @newbie8051 Месяц назад

    trippy

  • @FaizanShaikh02
    @FaizanShaikh02 2 месяца назад

    Extending the September deadline to?

    • @MaheshR-l2v
      @MaheshR-l2v Месяц назад

      Now october 5 is deadline. Next extension will be given on that date.

  • @star_boi_gaming7858
    @star_boi_gaming7858 2 месяца назад

    Mahalaxmi racecourse mai bhi hoga station and ticket price

  • @devilox9401
    @devilox9401 2 месяца назад

    Recently Sydney metro overtake mumbai metro 46 km 😂😂😂 Mumbai metro rank fell from 105 to 106 Shame on mumbai metro 😂😂😂😂😂

  • @devilox9401
    @devilox9401 2 месяца назад

    Wtf they off coments section every new video😂😂😂

  • @amanshaikh6777
    @amanshaikh6777 2 месяца назад

    EVM

  • @amanshaikh6777
    @amanshaikh6777 2 месяца назад

    I'm very disappointed with Mumbai metro Line 9 - Red Line because it's not operational yet so you have to do something about it for satisfaction.

  • @rahuljaisinghani7268
    @rahuljaisinghani7268 3 месяца назад

    Mumbai aqua line metro is starting when 24-7-24 it didn't start when its starting after Diwali?

  • @VivekSharma-yy5yk
    @VivekSharma-yy5yk 3 месяца назад

    Stations chote hain baaki boht acha laga dekh ke thank you modi ji

  • @surajkunder5745
    @surajkunder5745 3 месяца назад

    Proud that I have worked on this project during my internship with L&T, we designed all 3 receiving stations for this line which is in seepz, Dharavi and mahalaxmi

    • @surajkunder5745
      @surajkunder5745 3 месяца назад

      L&T team was very professional the same team designed airfield lighting for many Indian airport including mumbai airport runway and T2 terminal

  • @jyotigandhi1124
    @jyotigandhi1124 3 месяца назад

    When the cuffee parade starts to bkc?

    • @metroenthusiasat07
      @metroenthusiasat07 Месяц назад

      that will be opened next year cuz yesterday i went to mumbai central station they havent even started with their overground work

  • @user-uz5cq4xo5h
    @user-uz5cq4xo5h 3 месяца назад

    Then it would be faster & easier to reach BKC for western suburb commuters.

  • @Rose-g7o4x
    @Rose-g7o4x 3 месяца назад

    Fantastic work, Mumbai the shaan of Bharat. BRAVO.

  • @tukaidas1272
    @tukaidas1272 3 месяца назад

    Fuck my neck 😂😂😂

  • @avikagram
    @avikagram 3 месяца назад

    I saw a date that on 24th july metro will be start but when we reached here we saw its hasn’t stated yet there will he delay for more than 6 month

  • @mandartamore9607
    @mandartamore9607 3 месяца назад

    Mumbai To Pune Rapido Relway Calu Karo

  • @isshiomi6364
    @isshiomi6364 3 месяца назад

    Mumbai metro project declared in 2004 along with Delhi metro...7 yrs for all approvals & clearances ...Then 3 yrs 2011 - 14 not started as state govt didn't allocate funds...2016 state govt got funding from Japan and project started by Fadanvis govt under Ashwini Bhide as MD

  • @isshiomi6364
    @isshiomi6364 3 месяца назад

    Thank you Devendra Fadanvis ji and Ashwini Bhide ji, MD of Mumbai Metro

  • @studentin30sbeyond6
    @studentin30sbeyond6 3 месяца назад

    Dekh raha hai binod Sirf trial trial khel rahe aur public ko ch****ya Bana rahe

  • @anuragsharma7071
    @anuragsharma7071 3 месяца назад

    great to see the a much needed development

  • @str7413
    @str7413 3 месяца назад

    Have some shame. Nothing to be proud of. Should have been completed 2 years back. Corruption and Indians go hand in hand.

  • @iamkishansuthar
    @iamkishansuthar 3 месяца назад

    When this train will start it's already deadline period

  • @devilox9401
    @devilox9401 3 месяца назад

    Seoul subway 1302 km 🔥💥💥💥 Beijjing metro 836 km 🗿🗿🗿 Shanghai metro 802 km 🗿🗿 Mumbai metro 46 km 🤡🤡🤡💩💩💩

    • @krishnapala_music04
      @krishnapala_music04 3 месяца назад

      those cities are much bigger than mumbai and plus mumbai metro is still developing and more lines are going to come

    • @p.r.i.m.u.s1723
      @p.r.i.m.u.s1723 3 месяца назад

      U R Right​@@krishnapala_music04

    • @YG_4
      @YG_4 2 месяца назад

      Mumbai local train Network 390 km doing the job since ages Additional 470 km Metro line under construction

  • @tukaidas1272
    @tukaidas1272 3 месяца назад

    Mumbai metro is joke not even touch 50 km Go learn shanghai and beijjing metro 1000 km how to built massive metro network

  • @tukaidas1272
    @tukaidas1272 3 месяца назад

    This is joke mumbai metro 46 km is joke 107 rank Mumbai metro higher position people should visit shanghai and beijjing see the metro construction of how to built 1000 km metro rail

  • @silkrouteful
    @silkrouteful 3 месяца назад

    This should have been given publicity

  • @SshivamKhopkar
    @SshivamKhopkar 4 месяца назад

    Slowest construction ever! Fake start dates given.

    • @soumyamohapatra365
      @soumyamohapatra365 4 месяца назад

      Tu bana le next time

    • @alagyinsaan6592
      @alagyinsaan6592 3 месяца назад

      Bro they have deal with all other stuffs

    • @Rose-g7o4x
      @Rose-g7o4x 3 месяца назад

      ​@@soumyamohapatra365 gali galoch aur juth banaayega, aur kyae.

  • @Billu.Bhau.5
    @Billu.Bhau.5 4 месяца назад

    खुप छान ....😻🔥

  • @NR-kl7bv
    @NR-kl7bv 4 месяца назад

    Love it. But the platform looks too small..if we were to compare it to the local train demands then won't it be highly probable that the crowd during peak hours would be unbearable?

    • @pred9665
      @pred9665 4 месяца назад

      hello, the first and third platforms are emergency platforms i believe. the second one is bigger than it looks check delhi undergorund platforms they are very similar.

    • @poojapramodjadhav485
      @poojapramodjadhav485 4 месяца назад

      Its good so nobody vl take platform as their home to sit n beg n sleep,

    • @pred9665
      @pred9665 4 месяца назад

      @@poojapramodjadhav485 😂 😂

    • @ameykulk
      @ameykulk 4 месяца назад

      You're too quickly to judge something you haven't seen it actually! Let the train service start first!!

    • @poojapramodjadhav485
      @poojapramodjadhav485 4 месяца назад

      @@ameykulk M not judging just saying if platforms r short then ppl vl atleast behave & properly board the train

  • @PreshitDeorukhkar
    @PreshitDeorukhkar 4 месяца назад

    Will the station-sides differ randomly? Line 2A and Line 7 have the stations arriving on the left side only, which is nice. Hope there's no inconsistency in Line 3 like our local trains, where the station arrives on a random side.

    • @shockwave5484
      @shockwave5484 3 месяца назад

      I believe it will be an island platform on all stations, except maybe Aarey. So it will always be on the right.

  • @sohamranadepersonal2733
    @sohamranadepersonal2733 4 месяца назад

    How long would it take to obtain CMRS certification?

    • @ayushgarg7033
      @ayushgarg7033 4 месяца назад

      December mai start hoga bhai so ja

    • @devilox9401
      @devilox9401 3 месяца назад

      Next year January 😂😂😂😢😢😢

  • @amolgawde911
    @amolgawde911 4 месяца назад

    👌😍

  • @Ajay-fl7bl
    @Ajay-fl7bl 5 месяцев назад

    the biggest reason i love bjp.

  • @pramodrewale3499
    @pramodrewale3499 5 месяцев назад

    feel sad for Mumbai that this international city is getting pathetic metro station designs 😞

  • @mandartamore9607
    @mandartamore9607 5 месяцев назад

    Nice Make Mumbai To Pune Rapid 🚄 Relway Jai Hind

  • @shamimahmed1038
    @shamimahmed1038 5 месяцев назад

    May the 11th and still no fucking clue of when commercial operations are going to start

  • @jaygandecha8667
    @jaygandecha8667 5 месяцев назад

    Aur kitne sal trial chalenge...😂

  • @devangshah123
    @devangshah123 6 месяцев назад

    september se phele chalu nahi hoga.

  • @indian_coaster_enthusiast
    @indian_coaster_enthusiast 6 месяцев назад

    8 years to build a 46 km line... Bmc and its 28000 crore at work, everyone!

    • @tailwind112
      @tailwind112 6 месяцев назад

      Uddhav thackeray delayed land acquisition process.

    • @parthkatkhede7772
      @parthkatkhede7772 5 месяцев назад

      Say thanks to land acquisition delay by Thackeray

  • @keithdsouza8266
    @keithdsouza8266 6 месяцев назад

    Please update backfilling work 28th April 2024

  • @prasadmore-c3f
    @prasadmore-c3f 6 месяцев назад

    most boring metro till date

  • @maharashtraengineeringadmi6428
    @maharashtraengineeringadmi6428 6 месяцев назад

    भ्रष्टाचाराचा महामेरू

  • @mrmprm8732
    @mrmprm8732 6 месяцев назад

    Urban development dep of maharashtra state issued notification dated 29Feb 2024 on adding clause 33(23) to DCPR2034 about Transit oriented development zone of 500m from boundary of each metro station on Colaba to Seepz route. 500m is very less, distance between Siddhivinayak Metro Station and Dadar Metro Station is approx 1.4km. TOD zone should be 800m or 65% of distance between two successive metro stations on Colaba to Seepz route. In Pune City, on Vanaz to Ramwadi metro route, average distance between two successive stations is approx 1km yet TOD zone is kept as 650m from boundary of metro station. Plot area constraint should be removed for giving TOD zone FSI as there are very few buildings in Mumbai island which have plot areas exceeding 10000sqm. Even Pune metro tod zone FSI has removed the constraint of plot area. Car and scooter parking should not be encouraged in TOD zone FSI as then it contradicts the purpose of building metro line. Instead bicycle parking should be encouraged as bicycle can be carried inside the metro too. FSI in metro tod zone should be higher than that available from existing alternative clauses of dcpr2034 like 33(7), self redevelopment, cluster redevelopment, sra redevelopment then only buildings will try to avail metro tod zone FSI. For example A more than 30 years old building in Mumbai Island having plot area above 4000sqm and adjacent to 18m wide road can right now avail 5.4FSI including fungible. If this building comes in metro tod zone then it should be eligible to get much more than 5.4fsi from clause 33(23) if it has to apply for metro tod zone FSI else building will not make use of 33(23) for redevelopment. The above should be taken care off before government passes a resolution on 33(23) of dcpr 2034.

  • @mrmprm8732
    @mrmprm8732 6 месяцев назад

    Urban development dep of maharashtra state issued notification dated 29Feb 2024 on adding clause 33(23) to DCPR2034 about Transit oriented development zone of 500m from boundary of each metro station on Colaba to Seepz route. 500m is very less, distance between Siddhivinayak Metro Station and Dadar Metro Station is approx 1.4km. TOD zone should be 800m or 65% of distance between two successive metro stations on Colaba to Seepz route. In Pune City, on Vanaz to Ramwadi metro route, average distance between two successive stations is approx 1km yet TOD zone is kept as 650m from boundary of metro station. Plot area constraint should be removed for giving TOD zone FSI as there are very few buildings in Mumbai island which have plot areas exceeding 10000sqm. Even Pune metro tod zone FSI has removed the constraint of plot area. Car and scooter parking should not be encouraged in TOD zone FSI as then it contradicts the purpose of building metro line. Instead bicycle parking should be encouraged as bicycle can be carried inside the metro too. FSI in metro tod zone should be higher than that available from existing alternative clauses of dcpr2034 like 33(7), self redevelopment, cluster redevelopment, sra redevelopment then only buildings will try to avail metro tod zone FSI. For example A more than 30 years old building in Mumbai Island having plot area above 4000sqm and adjacent to 18m wide road can right now avail 5.4FSI including fungible. If this building comes in metro tod zone then it should be eligible to get much more than 5.4fsi from clause 33(23) if it has to apply for metro tod zone FSI else building will not make use of 33(23) for redevelopment. The above should be taken care off before government passes a resolution on 33(23) of dcpr 2034.