- Видео 205
- Просмотров 41 348
Roshan Pakistan
Добавлен 26 апр 2018
Rising Peacefully!
Видео
Wiring | Stringing with a Winch Machine |132 kV |Upstream |Flowing Water |Indus River |Rohri Sukkur
Просмотров 414 месяца назад
Wiring | Stringing with a Winch Machine |132 kV |Upstream |Flowing Water |Indus River |Rohri Sukkur
Indus River|Dargaah|Landsdown Bridge|Rohri
Просмотров 2104 месяца назад
Indus River|Dargaah|Landsdown Bridge|Rohri
Stringing Work in Flowing Water |Wiring |132 kV |River Main Stream |Detail Video
Просмотров 214 месяца назад
Stringing Work in Flowing Water |Wiring |132 kV |River Main Stream |Detail Video
Stringing Work |Wiring |ACSR Rail Conductor |River Crossing |132 kV |Detail Work
Просмотров 304 месяца назад
Stringing Work |Wiring |ACSR Rail Conductor |River Crossing |132 kV |Detail Work
Permanent Casing Lowering |Pile Foundation
Просмотров 2285 месяцев назад
Permanent Casing Lowering |Pile Foundation
Assembling Of Tower |Erection |By Crane | Indus |River Bank |Transmission Lines
Просмотров 825 месяцев назад
Assembling Of Tower |Erection |By Crane | Indus |River Bank |Transmission Lines
Pile Foundation |Concrete Pouring |By Winch Machine |Mobile Crane |Indus River |Sukkur
Просмотров 1205 месяцев назад
Pile Foundation |Concrete Pouring |By Winch Machine |Mobile Crane |Indus River |Sukkur
Erection Of Towers |Site Activities |Clips | River Work |132 kV |River Xing |Indus River |Sukkur
Просмотров 405 месяцев назад
Erection Of Towers |Site Activities |Clips | River Work |132 kV |River Xing |Indus River |Sukkur
Earthwork |Approaching way |Indus River |Temporary Road |Site Work
Просмотров 1425 месяцев назад
Earthwork |Approaching way |Indus River |Temporary Road |Site Work
Insulators Hanging |Conductor Letup |Wiring |500 kV TL
Просмотров 985 месяцев назад
Insulators Hanging |Conductor Letup |Wiring |500 kV TL
Assembling |Erection of Steel Tower |500 kV |Single Circuit |Rehabilitation Work
Просмотров 935 месяцев назад
Assembling |Erection of Steel Tower |500 kV |Single Circuit |Rehabilitation Work
Landsdown Bridge |1889 |Rohri |Sukkur |Indus River |Visit |Rohri Bridge
Просмотров 465 месяцев назад
Landsdown Bridge |1889 |Rohri |Sukkur |Indus River |Visit |Rohri Bridge
Breakdown |Rehabilitation Work |Dismantling Work |Assembling |Erection of Steel Tower |500 kV
Просмотров 1135 месяцев назад
Breakdown |Rehabilitation Work |Dismantling Work |Assembling |Erection of Steel Tower |500 kV
Piyari Naat-Ghulam Hussain in Office
Просмотров 495 месяцев назад
Piyari Naat-Ghulam Hussain in Office
Tie Beam Construction | Steel Fixing |Concreting with Lift| River Crossing |132 kV Transmission Line
Просмотров 666 месяцев назад
Tie Beam Construction | Steel Fixing |Concreting with Lift| River Crossing |132 kV Transmission Line
Nice PPE sandals and bathrobes
اچھا جی ❤
Nice!!
Thanks for the visit
Good job
Or GEC?
Hello please can I ask something
A Delle Alstom disconnector?
Yes.
❤❤❤
❤
🎉🎉🎉
❤❤
❤❤❤
❤❤
🎉🎉
❤❤
🎉
Ma Sha Allah❤
MashaAllah❤❤❤
❤❤
❤
Good Work
❤
❤
❤
❤
❤
Good
❤❤
❤❤
❤
Good efforts ❤
Thanks 😊
❤
Good❤
❤
❤
❤
❤
Hardworking
Very Challenging work.
It really is!
Good
Thanks
Good work...
Thanks
Good Work ❤
Thank you! 😊
Good.
Thanks
❤❤❤
❤❤
Nice
Thanks
❤❤❤
Nice❤❤
Thanks 🤗
❤❤
Nice❤❤❤
Thanks 🤗