Protection Relay Setting Calculation for MV Incoming Feeder Source B2 | Part 8 of 8
Просмотров 6272 года назад
Relay setting calculation for 51, 51N, 59 and 27 relays.
Protection Relay Setting Calculation for MV Bus Coupler with Directional Relay | Part 6 of 8
Просмотров 6162 года назад
Relay setting calculation for 51, 67, 67N, 59 and 27 relays.
Protection Relay Setting Calculation for MV Incoming Feeder Source B1 | Part 7 of 8
Просмотров 6162 года назад
Relay setting calculation for 51, 51N, 59 and 27 relays.
Protection Relay Setting Calculation for MV Cross Tie Feeders with Directional Relay | Part 5 of 8
Просмотров 5472 года назад
Relay setting calculation for 51, 67, 67N, 59 and 27 relays.
Protection Relay Setting Calculation for MV Incoming Feeder Source A1 & A2 | Part 4 of 8
Просмотров 6512 года назад
Relay setting calculation for 51, 51N, 59, and 27 relays.
Protection Relay Setting Calculation for MV Bus Coupler Upstream | Part 3 of 8
Просмотров 6392 года назад
Relay setting calculation for 51, 51N, 59, 27 relays.
Protection Relay Setting Calculation for MV Outgoing Cable Feeder | Part 2 of 8
Просмотров 1,1 тыс.2 года назад
Relay setting calculation for 51, 51N, 59 and 27 relays.
Protection Relay Setting Calculation for MV Bus Coupler Downstream | Part 1 of 8
Просмотров 1,3 тыс.2 года назад
Relay setting calculation for 51, 51N, 59 and 27 relays
Protection Relay Setting Calculation for MV Capacitor Bank Feeder
Просмотров 1,8 тыс.2 года назад
Relay setting calculation for 51, 51N and 27 relays.
Protection Relay Setting Calculation for Transformer Feeder (Iow set, high set & instantaneous)
Просмотров 6 тыс.2 года назад
Relay setting calculation for 51, 51N and 27 relays.
Arc Flash Analysis Using ETAP
Просмотров 12 тыс.2 года назад
Performed Arc Flash Analysis using two different methods, i.e. IEEE 1584-2002 and IEEE 1584-2018.
How to Prepare a Key Single Line Diagram (SLD)
Просмотров 1,8 тыс.2 года назад
Discussed on what are the information required in preparing a Key Single Line Diagram
Relay Coordination Study Using ETAP | Part 2
Просмотров 6 тыс.2 года назад
Phase element coordination between downstream LV circuit breakers and upstream MV circuit breaker.
Relay Coordination Study Using ETAP | Part 1
Просмотров 23 тыс.2 года назад
ANSI 51 relay phase element coordination study.
Usapang PEC | Article 6.95 Fire Pumps | Tagalog
Просмотров 5 тыс.3 года назад
Usapang PEC | Article 6.95 Fire Pumps | Tagalog
Cable Sizing Using ETAP
Просмотров 8 тыс.3 года назад
Cable Sizing Using ETAP
Protection Relay Setting Calculation for MV Motor Feeder Relays
Просмотров 10 тыс.3 года назад
Protection Relay Setting Calculation for MV Motor Feeder Relays
Optimal Capacitor Placement and Capacitor Bank Sizing Using ETAP
Просмотров 5 тыс.3 года назад
Optimal Capacitor Placement and Capacitor Bank Sizing Using ETAP
Protection Relay Setting Calculation for Transformer Feeder Relays
Просмотров 29 тыс.3 года назад
Protection Relay Setting Calculation for Transformer Feeder Relays
Protection Relay Setting Calculation for Double Ended LV Switchgear Incomer Relays
Просмотров 6 тыс.3 года назад
Protection Relay Setting Calculation for Double Ended LV Switchgear Incomer Relays
Harmonic Analysis and Harmonic Filter Sizing Using ETAP
Просмотров 7 тыс.3 года назад
Harmonic Analysis and Harmonic Filter Sizing Using ETAP
Motor Starting Analysis Using ETAP - Dynamic
Просмотров 3,6 тыс.3 года назад
Motor Starting Analysis Using ETAP - Dynamic
Motor Starting Analysis Using ETAP - Static
Просмотров 2,4 тыс.3 года назад
Motor Starting Analysis Using ETAP - Static
Short Circuit Analysis Using ETAP Based on IEC 60909 Standard
Просмотров 5 тыс.3 года назад
Short Circuit Analysis Using ETAP Based on IEC 60909 Standard
Short Circuit Analysis Using ETAP Based on ANSI C37 Standards
Просмотров 7 тыс.3 года назад
Short Circuit Analysis Using ETAP Based on ANSI C37 Standards
How to Customize ETAP Library by Adding New Cable Data
Просмотров 7 тыс.3 года назад
How to Customize ETAP Library by Adding New Cable Data
Cable Voltage Drop, Ckt. Breaker KAIC Rating and Busbar Bracing Verification Using ETAP
Просмотров 7 тыс.3 года назад
Cable Voltage Drop, Ckt. Breaker KAIC Rating and Busbar Bracing Verification Using ETAP
Load Flow Study Using ETAP | Part 2
Просмотров 6 тыс.3 года назад
Load Flow Study Using ETAP | Part 2
Load Flow Study Using ETAP | Part 1
Просмотров 11 тыс.3 года назад
Load Flow Study Using ETAP | Part 1

Комментарии

  • @highvolt9679
    @highvolt9679 13 дней назад

    Protection 49 RMS not clear at all but thank you very much

  • @rakeshverma-cu8ug
    @rakeshverma-cu8ug Месяц назад

    Sir kindly make video on low stage , High stage and instantaneous and where one should set idmt and dmt settings as in ABB ref615 relay please

  • @aminhassan-y5l
    @aminhassan-y5l 2 месяца назад

    how to join your channel, I cannt get the SLD PDF to form OLV in etap

  • @Alk-up2xo
    @Alk-up2xo 2 месяца назад

    great video. thanks for the impressive information. I have a question: why there is no synchro check relay (25) in this BC ?

  • @julialitvinyuk3149
    @julialitvinyuk3149 3 месяца назад

    Why 565%?

  • @JoaozitoMorais-q5k
    @JoaozitoMorais-q5k 3 месяца назад

    can i have the drawing of the switchyard pleace

  • @marcuslove5055
    @marcuslove5055 4 месяца назад

    U have alert at the end😂

  • @jasem1017
    @jasem1017 5 месяцев назад

    Sir galing mo mgturo

  • @one0egg
    @one0egg 5 месяцев назад

    How do you find out whether you impliment a zigzag earthing transformer correctly, I tried with and with out the earthing tx, but the results are the same

  • @joeysaavedra56
    @joeysaavedra56 6 месяцев назад

    Sir your tutorial is good and helpful, the voltage on this example is at 400V now, correct nominal voltage and what makes it 100.3%?

  • @bennyzerda
    @bennyzerda 6 месяцев назад

    Hi Sir Julius. On an 11kV switchboard is it possible to configure the protection relay of an outgoing feeder as an Incomer? The intention is to supply temporary power from a generator to the 11kV switchboard using one of the spare outgoing feeders due to the permanent incoming power is not yet ready. Kindly explain how to configure the relay of the outgoing feeder. There is no potential transformer on the outgoing feeder but only CTs. Is there a need to change the connections on the CTs of the outgoing feeder to correct the polarity as incomer or this can be done thru configuration of relay?

  • @syedhaiderkhawarzmi6269
    @syedhaiderkhawarzmi6269 7 месяцев назад

    can you share what setting you had for distribution pannels, HVCB and cables?

  • @syedhaiderkhawarzmi6269
    @syedhaiderkhawarzmi6269 7 месяцев назад

    what are cable lengths?

  • @raymondgaballo7134
    @raymondgaballo7134 7 месяцев назад

    sir Juluis, dba grounding cable 1purpose will be for system ground. If the ground fault protection is disabled, is grounding cable ba still needed? Thank you

  • @sms150
    @sms150 7 месяцев назад

    Your video gave me confidence on Harmonics so that I can tackle clients. Thanks mate

  • @MJS146
    @MJS146 7 месяцев назад

    Sir I'm planning to take a whole training this coming nov. May I know how much usually is the amount of etap training? Based on the ff.topics 1. AC system modeling & cable sizing 1 & 2 2. Load flow study, evaluation, result analyzer review. 3. 3-D data base 4. Short circuit study and evaluation (ANSI & IEC) 5.Protective Device sequence and operation 6. Arc flash studies. Thank you

  • @ManojIllangasooriya
    @ManojIllangasooriya 7 месяцев назад

    love it

  • @malcolmherojudge-bu5mm
    @malcolmherojudge-bu5mm 7 месяцев назад

    Thank you for this video! I was having problems with my voltage drop on my cables using ETAP, and this video helped me see some options I believe I missed, great video!!

  • @phucnguyen-im7cj
    @phucnguyen-im7cj 7 месяцев назад

    PLEASE GIVE ME THIS DOCUMENT

  • @ManojIllangasooriya
    @ManojIllangasooriya 7 месяцев назад

    Thank you.

  • @jelesaraga3107
    @jelesaraga3107 7 месяцев назад

    salamat sir sa dagdag kaalaman, next vid sir sana po mga component na gngamit kapag jockey pump set up or with fire pump set up po. kagaya po nung nasa unang video mga piping diagram po.

  • @ManojIllangasooriya
    @ManojIllangasooriya 7 месяцев назад

    one of the best overall lesson

  • @ManojIllangasooriya
    @ManojIllangasooriya 8 месяцев назад

    love it

  • @charinath5445
    @charinath5445 8 месяцев назад

    Thank you for sharing your knowledge; I see some doing motor starting analysis in Transient stability module? why?

  • @subbancc
    @subbancc 9 месяцев назад

    Thank you very much.

  • @ManojIllangasooriya
    @ManojIllangasooriya 9 месяцев назад

    Love it

  • @Engr.EEmpay
    @Engr.EEmpay 9 месяцев назад

    Great video sir! By the way, can you also demonstrate on how to do Temperature Rise Analysis using ETAP? Thank you very much po.

  • @Engr.EEmpay
    @Engr.EEmpay 9 месяцев назад

    Sir Julius, How about if the transformer is ONAN/ONAF type? What rating will be considered in load flow analysis? Is it the ONAN or ONAF or both can be considered? Thank you very much po

  • @noelfaithfulkari2857
    @noelfaithfulkari2857 10 месяцев назад

    Thanks sir, well explained. Subscribe to the channel

  • @recelalbertcelis8012
    @recelalbertcelis8012 10 месяцев назад

    Sir good day. How to change units to mm squared sir instead of AWG/kcmil?

  • @pinoyguitartv
    @pinoyguitartv 10 месяцев назад

    Thanks sir 👍👍👍

  • @edwinloquina6693
    @edwinloquina6693 10 месяцев назад

    Hi Sir, can you provide calculation and selection on CT and PT sizing.

  • @RedIBrown-mn9zs
    @RedIBrown-mn9zs 10 месяцев назад

    Thank you, Sir! Ask ko nalang din po if ever na nababago yung single tuned to double tuned? Tsaka RLC filter lang po ba or pwede po kaya ako makapag simulate ng LCL or LLCL filter? Thank you po in advance

  • @Doti_231
    @Doti_231 11 месяцев назад

    Sir thank you for the videos, how you determine operating time T 0.50 second on the calculation for Relay 1??

  • @dha9jay
    @dha9jay 11 месяцев назад

    Please guide on input data of switchgear, bracing asymm rms and peak values.

  • @MeysamSadeghzadeh
    @MeysamSadeghzadeh 11 месяцев назад

    Thank you so much. So Helpful and informative

  • @alaadilekh4373
    @alaadilekh4373 11 месяцев назад

    what is length of cable

  • @muhammadfajri5137
    @muhammadfajri5137 11 месяцев назад

    Sorry Can i ask something. How to update library CB?

  • @9999afshin
    @9999afshin 11 месяцев назад

    Nice

  • @Elangelina
    @Elangelina Год назад

    Thank you Lodi. Excellent videos

  • @garciabaptista3392
    @garciabaptista3392 Год назад

    Could you please send me Tr. datesheet

  • @raju-by3nb
    @raju-by3nb Год назад

    Sir please provide explanation on REF 615

  • @arbabimran388
    @arbabimran388 Год назад

    Hello Salaam Peace be upon you Dear I checked it out your last video happened to uploaded an an year before. You technically have good content on ETAP and in Relays Why you are making vlogs on Relays especially and good vlogs to make model analysis on Etap. I encourage you to please continue your knowledge sharing on you tube. You have very good knowledge able skills Regard imran

  • @tuna6423
    @tuna6423 Год назад

    Hi Julius, I am thinking that 24:15 Earth fault protection If it is set only 2 value i.e., threshold and definite time, it should be called as 50G not 51G Unless you select IDMT Characteristic e.g., NINV, VINV or EINV Normal/Very/Extremely Inverse respectively and set time multiplier this will be 51G

  • @jessiesantos1641
    @jessiesantos1641 Год назад

    sir, papaano kung customer owned yung transformer or tawag natin sa pinas is owner supplied transfomer, allowed pa rin ba naka tap yung conductor sa secondary side ng transformer?

  • @syedbaqirrazakazmi5290
    @syedbaqirrazakazmi5290 Год назад

    I am having this error "could not meet all minimum voltage limits. you may increase the number of capacitor banks or add more candidate buses and try again". Can you tell me how to fix it please?

  • @ASIFKHAN-ui7jp
    @ASIFKHAN-ui7jp Год назад

    Excellent explanation. Thanks

  • @ASIFKHAN-ui7jp
    @ASIFKHAN-ui7jp Год назад

    Very well explained thanks.

  • @diansyahkira7
    @diansyahkira7 Год назад

    Thank you sir !!

  • @RaymundSanone
    @RaymundSanone Год назад

    sir, can you also discuss how genset circuit breaker in synchronizing panel trip coordination done, condition genset circuit breaker has lower ampere rating compare to the feeder it will serve since 3 genset in parallel