BayBridgeInfo
BayBridgeInfo
  • Видео 32
  • Просмотров 100 842
Part 1: YBITS Concrete Pour
Watch as concrete is poured around the steel reinforcement on the new Yerba Buena Island Transition Structure, part of the the new East Span of the Bay Bridge. Part 1 of 3.
Просмотров: 29 123

Видео

Cable Compaction Nearly Complete
Просмотров 3 тыс.12 лет назад
Cable Compaction Nearly Complete
Bay Bridge News-Westbound Oakland Touchdown Detour
Просмотров 80812 лет назад
A description of the Bay Bridge Closure that took place over Presidents' Day Weekend 2012
Westbound Bay Bridge CLOSED Presidents' Day Weekend
Просмотров 56512 лет назад
The Westbound Bay Bridge will be Closed Presidents' Day Weekend Beginning at 8 p.m. Friday, Feb. 17 to 5 a.m. Tuesday, Feb. 21
inside_the_bay_bridge_360.mp4
Просмотров 3,2 тыс.12 лет назад
Take a tour inside and on top of the new Bay Bridge
Fourth SAS Tower Lift
Просмотров 48313 лет назад
The fourth lift of the SAS tower was completed March 4, bringing the tower to 480 feet, 91 percent of its final 525-foot height.
Design Features of the Bay Bridge SAS Tower
Просмотров 1,5 тыс.13 лет назад
Up-close look at some of the design features of the new Bay Bridge SAS Tower
First SAS Tower Lift
Просмотров 48213 лет назад
Images of the first section of the Bay Bridge Self-Anchored Suspension Span tower being raised
Bay Bridge SAS Tower-Strand Jacks and Rollers
Просмотров 8 тыс.13 лет назад
A look at the gear used to raise the massive sections of the Self-Anchored Suspension Span tower
Temporary SAS Steel Supports: A Bridge to Build a Bridge
Просмотров 6 тыс.14 лет назад
With construction of the new Self-Anchored Suspension (SAS) Span, the Bay Bridge team is turning traditional suspension bridge building on its head. Get a look at the unique construction process that involves first putting a temporary bridge in place in order to build the SAS structure
YBI Viaduct Replacement Timelapse (Labor Day 2007)
Просмотров 2,2 тыс.14 лет назад
See step-by-step how crews cut out and replaced a football field-sized piece of roadway on the Bay Bridge over Labor Day weekend 2007. This upgrade provided a seismically safe viaduct over Yerba Buena Island. After three days and nights of full bridge closure, the bridge reopened to traffic 11 hours ahead of schedule.
West Approach Demolition Timelapse (2006)
Просмотров 65914 лет назад
Hear interviews with key members of the San Francisco-Oakland Bay Bridge project team, who led the successful, intense three-day demolition of a 1,000-foot-long segment of roadway on the West Approach. To do the difficult work, the eastbound approach to the Bay Bridge was closed to traffic over Labor Day weekend 2006.
Overview of the Oakland Touchdown
Просмотров 3,7 тыс.14 лет назад
Find out how crews are building the roadway connecting Oakland to the new East Span which includes the iconic Self-Anchored Suspension Span tower.
West Approach Opening Ceremony
Просмотров 72714 лет назад
Watch highlights from the 2008 ceremony celebrating the completion of the West Approach of the San Francisco-Oakland Bay Bridge. Speakers included Governor Schwarzenegger, Caltrans Director Will Kempton, San Francisco Mayor Newsom, Oakland Mayor Dellums, and others.
Overview of the SFOBB Projects (2009)
Просмотров 1 тыс.14 лет назад
Get a taste of what it takes to build one of the engineering wonders of the world: the San Francisco-Oakland Bay Bridge.
Transition Span Lift
Просмотров 81114 лет назад
Transition Span Lift
West Approach Archaeology & Landscaping
Просмотров 15414 лет назад
West Approach Archaeology & Landscaping
YBI Detour/Labor Day Construction Sequence (2009)
Просмотров 1,4 тыс.14 лет назад
YBI Detour/Labor Day Construction Sequence (2009)
West Approach Demolition (2006)
Просмотров 86814 лет назад
West Approach Demolition (2006)
earthquake_simulation_lq.m4v
Просмотров 3,2 тыс.14 лет назад
earthquake_simulation_lq.m4v
SAS Construction Sequence
Просмотров 2 тыс.14 лет назад
SAS Construction Sequence
GoogleEarth PressConf (1 of 3).m4v
Просмотров 46014 лет назад
GoogleEarth PressConf (1 of 3).m4v
GoogleEarth PressConf (2 of 3) .m4v
Просмотров 9314 лет назад
GoogleEarth PressConf (2 of 3) .m4v
GoogleEarth PressConf (3 of 3).m4v
Просмотров 10114 лет назад
GoogleEarth PressConf (3 of 3).m4v
East Span Flythrough Simulation
Просмотров 2,2 тыс.15 лет назад
East Span Flythrough Simulation
YBI Viaduct Replacement Timelapse
Просмотров 2,4 тыс.15 лет назад
YBI Viaduct Replacement Timelapse
T1 Footing Box Replacement
Просмотров 71815 лет назад
T1 Footing Box Replacement
SAS Steel Saddle Casting
Просмотров 1,4 тыс.15 лет назад
SAS Steel Saddle Casting
Westbound Drivethrough
Просмотров 1,9 тыс.15 лет назад
Westbound Drivethrough
Eastbound Drivethrough
Просмотров 1,3 тыс.15 лет назад
Eastbound Drivethrough

Комментарии

  • @chaliehussle5838
    @chaliehussle5838 Год назад

    But the formen was there💆🏾‍♂️🤷🏾‍♂️

  • @chaliehussle5838
    @chaliehussle5838 Год назад

    They did all the real Ironworkers wrong I did all the rebar, laying all the rebar for the bridge and didn’t even get to show up to this 😢

  • @johndavidson4128
    @johndavidson4128 2 года назад

    I was on that pour

  • @phsycopiano
    @phsycopiano 7 лет назад

    I'm surprised Conco wasn't out there

  • @geomodelrailroader
    @geomodelrailroader 7 лет назад

    on the original Bay Bridge Pier 9 was the Achilles heel when Loma hit that pier snapped in half and sent two decks into the water. to make sure it does not happen again the whole Bay Bridge will have to be replaced and Pier 9 have to be demolished by explosive demolition.

  • @matthewcronin1286
    @matthewcronin1286 10 лет назад

    4:18-4:23 is hilarious! Their faces taught with concentration!

  • @EnriqueMoreno_Heavylift
    @EnriqueMoreno_Heavylift 13 лет назад

    Great job!!!

  • @marcelrookhuyzen
    @marcelrookhuyzen 14 лет назад

    look olso for maderokar or nettenkar and see yourzelf this stuf is working